CN201523173U - Temporary transformer cabinet used for building sites - Google Patents
Temporary transformer cabinet used for building sites Download PDFInfo
- Publication number
- CN201523173U CN201523173U CN2009202263383U CN200920226338U CN201523173U CN 201523173 U CN201523173 U CN 201523173U CN 2009202263383 U CN2009202263383 U CN 2009202263383U CN 200920226338 U CN200920226338 U CN 200920226338U CN 201523173 U CN201523173 U CN 201523173U
- Authority
- CN
- China
- Prior art keywords
- outer case
- anchor
- transformer
- steel frame
- wallboard
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model provides a temporary transformer cabinet used for building sites. The structure of the temporary transformer cabinet consists of a prefabricated base, a steel machine foundation, a dry transformer, an overhauling working pedal and an external box body; the dry transformer is fixed on the steel machine foundation; the steel machine foundation and the wall plate of the external box body are fixed with the prefabricated based by an anchor bolt and the anchor bolt used for fixing the external box body wall plate; the prefabricated base is provided with an anchor through hole and a cable wire through hole; a grounded anchor passes through the anchor through hole and fixes the prefabricated base on the surface; the underground cable wire passes through the cable wire through hole and the steel machine foundation and is connected with the dry transformer and relative equipment; and the overhauling working pedal is fixedly clamped with the side part of the steel machine foundation by a clamping part. Compared with the prior art, the transformer cabinet has the advantages of having reasonable process design, factory machining and production, whole transporting, field assembly construction, short construction period, low manufacturing cost, safe and reliable running, convenient disassembly and easy maintenance, and generating no building garbage after being removed and the like, and has excellent popularization and usage values.
Description
Technical field
The utility model relates to a kind of power transformation technology of sending, and the power transformation case is used in specifically a kind of construction site temporarily.
Background technology
The wet type power transformer of traditional oil immersion cooling is substituted by dry-type transformer, because the dry-type transformer volume is little, fail safe good, be mounted on the ground more, a box outer case is being built in the outside then, therefore have the transformer station of the dry-type transformer composition of box outer case, also be box-type substation.
Box type transformer normally is fixed on the support top that is formed by concrete casting, and support generally is to dig pit on ground according to the occupation of land size of outer case, carries out template, pours into semi-underground type, and promptly 2/3rds underground, and 1/3rd on the ground.Outer case is also mostly to be on-the-spot processing and fabricatings.The deficiency that this box-type substation base of prior art exists in actual applications is, (1) difficulty of construction is big, is subject to temperature and climatic influences in the work progress, such as construction in the winter time, concrete stirring, transportation and cast then are subjected to the influence of temperature, then are subjected to the influence of rainwater in summer; (2) consume a large amount of construction material and manpower and materials; (3) long construction period, used the same day of can not constructing the same day; (4) if site construction finishes, box outer case is then removed because of the building site resettlement, transformer in the outer case, outer case and other relevant devices can remove, but the cement base that stays then is difficult to remove, and causes environmental pollution even mechanical removal also will produce a large amount of building wastes; Also there is not at present good solution.
Summary of the invention
The purpose of this utility model is to overcome above-mentioned shortcoming, provides a kind of and convenient installs, detachable and make things convenient for the power supply management personnel that the power transformation case is used in the construction site that box type transformer overhauls temporarily.
Realize with the power transformation case temporarily in the following manner in the purpose of this utility model construction site, the power transformation case is by precast base, steel frame, dry-type transformer, service work pedal and outer case are formed, dry-type transformer is fixed on the steel frame, steel frame and outer case wallboard are fixed together by anchor bolt and precast base, precast base is provided with anchor perforation and cable and wire perforation, grounding anchor rod passes anchor perforation precast base is fixed on the ground surface, pass the electric wire perforation from underground cable and wire and be connected with dry-type transformer and relevant device thereof with steel frame, the service work pedal fixes together by the triangle hanging hole of triangle fastener and steel frame side.
Detachable box-type substation advantage of the present utility model is: because work progress is without earth excavation, thus be not subjected to climatic influences, and construction volume is little, short construction period, all parts all can be reused, and do not have raw materials consumption, have significantly reduced construction cost.If the power transformation case needs to remove, can use hoisting equipment to entruck and carry away pulling down piecemeal at the bottom of outer case, transformer, support and the precast concrete easily, very convenient and practical.In the ordinary maintenance process of power transformation case, in the limit of dry-type transformer steel frame portion demountable service work pedal is set, when the maintainer need overhaul transformer, maintenance pedal is connected to the side of transformer support, like this, the maintainer can stand on the maintenance pedal and work, and it is very handy to work together, promptly improve operating efficiency, also reduced labour intensity.
Description of drawings
Accompanying drawing 1 is the overall structure schematic diagram of construction site with the power transformation case;
Accompanying drawing 2 is construction site power transformation case steel frame and Working pedal plan structure schematic diagram;
Accompanying drawing 3 is the structural representation between construction site usefulness power transformation case steel frame and the Working pedal.
Mark in the accompanying drawing is represented respectively; Outer case is foot bolt 1 regularly; Anchor bolt 2; Electric wire perforation 3; Ground connection reinforcing bar 4; Precast base 5; Grounding anchor rod 6; Anchor perforation 7; Steel frame 8; Outer case 9; Gusseted 10; Working pedal 11; Dry-type transformer 12; Cable 13; Triangle hanging hole 14; Triangle fastener 15.
Embodiment
Below in conjunction with accompanying drawing folding case of the present utility model is become support and do following detailed description the in detail.
Shown in accompanying drawing 1-2, construction site of the present utility model is by precast base 5 with the power transformation case, steel frame 8, dry-type transformer 12, service work pedal and outer case 9 are formed, dry-type transformer 12 is fixed on the steel frame 8, steel frame 8 and outer case 9 by anchor bolt 2 and outer case regularly foot bolt 1 be fixed together with precast base 5, precast base 5 is provided with anchor perforation 7 and cable and wire perforation 3, grounding anchor rod 6 passes anchor perforation 7 with precast base 5 regularly on the surface, pass electric wire perforation 7 from underground cable and wire 13 and is connected with dry-type transformer 12 and relevant device thereof with steel frame 8, triangle hanging hole 14 fixings of service work pedal by triangle fastener 15 and steel frame 8 sides together.
The top of anchor bolt is welded with grounding anchor rod 6, and outer case foot bolt 1 regularly is arranged on the limit portion of reinforced concrete prefabricated base 5, and the outer case lower end and the weldering of the ground connection reinforcing bar in the precast base 54 of foot bolt 1 regularly is connected together.
The external lightning conducter 16 of transformer station, the earth connection 17 of transformer are connected ground connection by the ground connection reinforcing bar 4 in the precast base 5 and the support set bolt 2 at grounding anchor rod 6 tops respectively.
Embodiment
Transformer base, support and outer case all adopt batch production processing, and the mode of carrying out the job site assembling during use is to improve construction efficiency, shorten the construction period, reduce construction cost and not produce building waste.
The concrete bed that installs and fixes box type transformer is in the machine-shaping of cement prefab factory, steel frame and box outer case are all at Metal Processing Factory's blanking welding fabrication, by the defeated disposable job site of transporting to of vehicle of handling, be placed on the position that needs fixing box type transformer, the anchoring perforation of passing from the top down on the concrete prefabricated base with anchor metal during installation directly is anchored at ground surface, when all anchor poles get to underground after box type transformer base construction can finish, can carry out the installation of box type transformer support and transformer immediately, transformer installs and can carry out the assembling of casing, can realize fully constructing the same day and send the same day.When transformer need be removed, direction program that fully can installation is removed, promptly remove outer case, remove transformer, remove transformer steel support, extract all anchor poles, at last prefabricated cement base lifting is transported, the power transformation case is removed the place, back and is not stayed any future trouble, can carry out the clearance of site greening immediately and pay user's use.
Temporary transformer cabinet used for building sites of the present utility model is compared with existing technology, have technological design rationally, batch production processing, whole carrying, Assembling construction, thereby, short construction period, cost are low, safe and reliable to operation, convenient disassembly, be easy to safeguard and remove after can not produce the characteristics such as building waste, have good value for applications.
Claims (4)
1. the power transformation case is used in a construction site temporarily, it is characterized in that it is by precast base, steel frame, dry-type transformer, service work pedal and outer case are formed, dry-type transformer is fixed on the steel frame, steel frame and outer case wallboard are fixed together by anchor bolt and precast base, precast base is provided with anchor perforation and cable and wire perforation, grounding anchor rod passes anchor perforation precast base is fixed on the ground surface, pass the electric wire perforation from underground cable and wire and be connected with dry-type transformer and relevant device thereof with steel frame, the service work pedal fixes together by the triangle hanging hole of triangle fastener and steel frame side.
2. the power transformation case is used in construction site according to claim 1 temporarily, the upper end that it is characterized in that grounding anchor rod also is welded with anchor bolt, the limit portion of precast base is provided with outer case wallboard foot bolt regularly, and the outer case wallboard lower end of foot bolt and the ground connection reinforcing bar in the precast base regularly welds together.
3. the power transformation case is used in construction site according to claim 1 temporarily, it is characterized in that outer case by the roof and the four sides wallboard form, between the top and roof of outer case wallboard, assemble together by bolt respectively between the outer case wallboard side, the base of outer case wallboard and the outer case wallboard set bolt on the precast base are fixed together.
4. the power transformation case is used in construction site according to claim 1 temporarily, it is characterized in that the lightning conducter of transformer station, the earth connection of transformer are connected ground connection by the ground connection reinforcing bar in the precast base and the steel frame set bolt at grounding anchor rod top respectively.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009202263383U CN201523173U (en) | 2009-09-11 | 2009-09-11 | Temporary transformer cabinet used for building sites |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009202263383U CN201523173U (en) | 2009-09-11 | 2009-09-11 | Temporary transformer cabinet used for building sites |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201523173U true CN201523173U (en) | 2010-07-07 |
Family
ID=42509349
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009202263383U Expired - Fee Related CN201523173U (en) | 2009-09-11 | 2009-09-11 | Temporary transformer cabinet used for building sites |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201523173U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112103792A (en) * | 2020-09-18 | 2020-12-18 | 李渝 | High-voltage circuit breaker for power distribution system |
CN112768186A (en) * | 2020-12-27 | 2021-05-07 | 滨海翔东电子有限公司 | Low-energy-consumption power transformer and processing technology thereof |
-
2009
- 2009-09-11 CN CN2009202263383U patent/CN201523173U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112103792A (en) * | 2020-09-18 | 2020-12-18 | 李渝 | High-voltage circuit breaker for power distribution system |
CN112768186A (en) * | 2020-12-27 | 2021-05-07 | 滨海翔东电子有限公司 | Low-energy-consumption power transformer and processing technology thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101659082B (en) | System for integral binding and integral hoisting of steel bar framework of box beam and construction method thereof | |
CN103334359B (en) | Prefabricated reinforced concrete pavement plate and pavement construction method | |
CN103452350B (en) | Assembling electronic workshop and construction method thereof | |
CN201443072U (en) | Detachable combined tower crane foundation | |
CN203383121U (en) | Prefabricated temporary pavement concrete slab convenient to assemble and disassemble | |
CN103343547B (en) | Container type prefabricated house assembling steel reinforced concrete four patten and construction method | |
CN201523173U (en) | Temporary transformer cabinet used for building sites | |
CN103334361A (en) | Fabricated precast hollow reinforced concrete wear-resistant pavement slab and pavement construction method | |
CN201401040Y (en) | Concrete precast balance weight for mobile communication antenna holding pole | |
CN100589297C (en) | A kind of composite type cabinet type transformer substation | |
CN200953442Y (en) | Assembling box type transformer substation | |
CN201511439U (en) | System for integrally binding and hoisting box girder steel reinforcement framework | |
CN206941338U (en) | A kind of multi-functional truss machine | |
CN203603542U (en) | Fabricated electronic workshop | |
CN203429655U (en) | Assembly type steel reinforced concrete single-double column foundation for container prefabricated house | |
CN215287675U (en) | Hoisting tool for steel reinforcement cage | |
CN109098395A (en) | A kind of installation method of the prefabricated piping lane of assembly concrete | |
CN211229781U (en) | Novel prefabricated hollow enclosure | |
CN203429656U (en) | Assembly type steel reinforced concrete four-column combined foundation for container prefabricated house | |
CN203373631U (en) | Prefabricated reinforced concrete pavement slab | |
CN103334362B (en) | Prefabricated steel concrete wear resistant road surface plate and pavement construction method | |
CN103924614B (en) | A kind of shaft tower split raft foundation fast-assembling basis | |
CN203373635U (en) | Prefabricated hollow reinforced concrete wearproof pavement slab | |
CN203373624U (en) | Bridge prefabricated reinforced concrete hidden beam slab wearproof pavement system | |
CN2916869Y (en) | Earthed riveted box type transformer base |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |