CN201522396U - 直立式电动液压推土器 - Google Patents

直立式电动液压推土器 Download PDF

Info

Publication number
CN201522396U
CN201522396U CN2009200739111U CN200920073911U CN201522396U CN 201522396 U CN201522396 U CN 201522396U CN 2009200739111 U CN2009200739111 U CN 2009200739111U CN 200920073911 U CN200920073911 U CN 200920073911U CN 201522396 U CN201522396 U CN 201522396U
Authority
CN
China
Prior art keywords
oil
valve
oil pump
oil cylinder
fuel tank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009200739111U
Other languages
English (en)
Inventor
冯蓓蕾
王照明
陈智勇
胡建平
张�成
郑建朝
黄国弟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Third Harbor Consultants
Original Assignee
CCCC Third Harbor Consultants
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Third Harbor Consultants filed Critical CCCC Third Harbor Consultants
Priority to CN2009200739111U priority Critical patent/CN201522396U/zh
Application granted granted Critical
Publication of CN201522396U publication Critical patent/CN201522396U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Sampling And Sample Adjustment (AREA)

Abstract

本实用新型提供一种直立式电动液压推土器,包括:油箱;滤油器,通过管道与油箱连接;油泵,通过管道与滤油器相连接;推进油缸,油泵通过换向阀连接到推进油缸的下部;调速节流阀,其一端与推进油缸的上部连接,另一端连接到换向阀;溢油阀,设置在油泵的出口油路和换向阀与油箱相连的油路之间;活塞,设置在推进油缸内;顶头,通过顶杆与活塞相连,顶头与原状土试样相连接,以推动原状土试样,便于取土。

Description

直立式电动液压推土器
技术领域
本实用新型涉及一种取土器原状土试样取出用推土器,尤其涉及一种原状土试样取出用薄壁推土器。
背景技术
通过岩土工程勘察,获取不同深度的原状土试样送到土工试验室做测试,为设计、施工提供依据。
采取原状土试样时,原状土试样的扰动程度直接影响土木工程试验指标的准确性和可靠性。从这点上来说,薄壁取土器在软土中的取土质量明显优于厚壁取土器。目前国标、行业规范、地方规范对软、流塑状态的粘性土均要求采用薄壁取土器压入取土,因此薄壁取土器工艺得到广泛的推广和应用。
在薄壁取土器中,目前国内普遍采用手动推土器和卧式电动式推土器来推取土的试样。前者劳动强度大,工作效率低;后者机械齿轮易磨损,故障率较高,原状土试样易受到机械震动影响,推土器制作工艺复杂,占地面积大,由于是卧式,原状土试样在推出过程中不断弯曲变形。
上述二种方式取出得原状土试样均受到了不同程度的扰动。影响了土的试验成果数据,不能正确反映地基土层的真实性;影响到土的物理力学指标的准确性和可靠性,结果导致设计对土质的评价减低,无形中增加了建设投资。
因此,土木工程技术领域存在着这样的需求:发明一种在推土过程中原状土试样受扰动影响程度低的取土设备。
发明内容
为满足如上需求,本实用新型提供了一种直立式电动液压推土器,其采用的技术方案如下:
一种直立式电动液压推土器,其特征在于,包括:
油箱;
滤油器,通过管道与油箱连接;
油泵,通过管道与滤油器相连接;
推进油缸,油泵通过换向阀连接到推进油缸的上、下部;
调速节流阀,其一端与推进油缸的上部连接,另一端连接到换向阀;
溢油阀,设置在油泵的出口油路和换向阀与油箱相连的油路之间;
活塞,设置在推进油缸内;
顶头,通过顶杆与活塞相连,顶头与原状土试样相连接,以推动原状土试样,便于取土。
本实用新型的优点是:
1.无级变速,以液压为动力,推土匀速,避免了机械磨损、松动引起推出原状土过程造成的震动,避免了试样扰动。
2.操作简便,由溢流阀及换向阀组成操纵阀,溢流阀最大调整压力8MKPa。
3.节能降耗技术:传动结构上液压系统取代变速齿轮箱,不需要电源控制箱,适用性好,制造成本降低。
4.试样推出过程中始终保持平稳匀速,以3mm/s速率工作,能保证土体不扭曲,并保持试样和在地下时的直立状态一致,确保了土体结构的原状性,避免了试样二次扰动。
5.推土器上部设置内螺纹,配置不同规格内径的压板螺母和顶头,能适应不同直径、长度的试样,满足薄壁、砂样管等不同类型取土器采集的试样,一机多用。
6.克服了机械式推土器易磨损、易故障、维修麻烦的缺点,环保无污染;无噪声。
7.配置压力计显示工作压力,操作直观。
8.根据土的不同性质,自由调节、选择速率,推土连续匀速,避免原状土试样扰动,复位快速迅捷。
附图说明
下面结合附图,通过对本实用新型的具体实施方式的详细描述,将使本实用新型的技术方案及其他有益效果显而易见。
图1为本实用新型的示意图;
图2为本实用新型的原状土试样安装的示意图。
具体实施方式
为了更进一步了解本实用新型的特征,请参阅以下有关本实用新型的详细说明与附图,然而所附图式仅提供参考与说明之用,并非用来对本实用新型的保护范围加以限制。
如图1所示,为本实用新型的一个实施例。油箱101通过滤油器102连接到油泵103,油泵103通过换向阀107连接到推进油缸109,推进油缸109的上部连接调速节流阀108,调速节流阀108的另一端连接到换向阀107。在油泵103的出口油路和换向阀107与油箱101相连的油路之间设置一个溢油阀104。在推进油缸109内,设置有活塞110,与活塞110相连的顶杆111,以及位于顶杆111端部的顶头112。顶头112用来与原状土试样的衬筒连接,以推动原状土试样,便于取土。换向阀117可以选择三位二通换向阀,通过手动杠杆106来操作阀芯运动,以控制油的流向。在油泵103的出口设置压力表105,以随时观察液压。
在预备状态时,手动杠杆106位于中间,此时,换向阀107的P点与O点重合,油泵103处于工作状态,此时油泵103从油箱101吸入油,油经过管道流入滤油器102,经油泵103,经过换向阀107的PO闭合点,之后重新流回到油箱101。可以看到,此状态下油的运行线路为:油箱101→滤油器102→油泵103→P位→O位→油箱101。在整个过程中,油不经过推进油缸109。
图2是本实用新型的原状土试样安装的示意图。在推进油缸109上部设置承接板213,承接板213上设置顶头座214,承接板213之上设立柱215,立柱215上支撑压板216,压板216设置有内螺纹,通过此内螺纹与压板螺母217上外螺纹旋紧。在本实用新型的实施例中,可以配置不同规格内径和长度的压板螺母217和直径不同的顶头112,能适应各种直径、长度的原状土试样。在推土时,首先将原状土试样218两头的衬筒盖子拧开,原状土试样218的底部放置在顶头112上,根据原状土试样218衬筒直径不同,选择尺寸相应的压板螺母117拧上,使原状土试样218处于稳定状态。
下面结合图1和图2说明在工作状态时本实用新型的工作过程。将手动杠杆106向右推进,此时换向阀的5、6、8、7分别和P、A、B、O重合,使PA导通;OB导通。油的运行线路为:油箱101→滤油器102→油泵103→P和5重合位→6和A的重合位→推进油缸109的底部。此时,随着推进油缸109底部油量的增加,在液压作用下,顶杆111被不断推动上升,因此顶头112推动原状土试样218底部从衬筒中经过压板螺母117缓缓推出,操作者即可以不断截取根据工程和规范要求高度的原状土试样,直到原状土试样218被全部推出压板螺母117。此时,推进油缸109上部的油通过调速节流阀108流经BO回到油箱101。
调速节流阀108用来根据原状土试样218的特性及软硬程度来调节液压的大小。具体方法是:在调速节流阀108上设置一个控制流量的手轮。一般情况下手轮处于某一位置不变动。特殊情况下,如原状土试样218非常软时,为了避免扰动,通过将手轮旋大,增大阀口通流截面积,使流经的压力减小,此时,压力表105上的指示值减小。如果原状土试样218非常硬,通过将手轮旋小,阀口通流截面积减小,流经流量变大,此时,压力表105上的指示值增大。这样使得软、硬土的推进速度始终保持衡定。
溢油阀104保证压力为定值,能防止系统过载。当阀前压力不超过某一预调的极限值时,溢油阀104关闭,不溢油。当阀前压力超过极限值时,溢油阀104立即打开,油液即流回油箱101,因而可防止液压系统过载,保护油泵和液压系统的安全。
下面结合图1和图2说明在卸载状态时本实用新型的工作过程。将手动杠杆106向左推,此时换向阀1、4、3、2分别和P、B、A、O重合,使AO导通;PB导通。油的运行线路为:油箱101→滤油器102→油泵103→1和P的重合点→推进油缸109的上部。此时,随着推进油缸109上部的油量增加,在液压作用下,顶杆111随着活塞109往下压而不断下降。而推进油缸109底部的油,通过AO回到油箱101。
应当理解的是,上述对实施例的详细说明仅为了理解本实用新型,对本领域普通技术人员而言,可以根据上述说明加以改进或变换,只要是达到此目的的所有改进和变换都应属于本实用新型所附权利要求的保护范围。

Claims (4)

  1. 一种直立式电动液压推土器,其特征在于,包括:
    油箱;
    滤油器,通过管道与该油箱连接;
    油泵,通过管道与该滤油器相连接;
    推进油缸,该油泵通过换向阀连接到该推进油缸;
    调速节流阀,其一端与该推进油缸的上部连接,另一端连接到该换向阀;
    溢油阀,设置在该油泵的出口油路和该换向阀与该油箱相连的油路之间;
    活塞,设置在该推进油缸内;
    顶头,通过顶杆与该活塞相连,该顶头与原状土试样相连接。
  2. 如权利要求1所述的直立式电动液压推土器,其特征在于,该换向阀为三位二通换向阀。
  3. 如权利要求1所述的直立式电动液压推土器,其特征在于,在该油泵的出口处设置压力表。
  4. 如权利要求1所述的直立式电动液压推土器,其特征在于,还包括:
    承接板,设置在该推进油缸上部;
    顶头座,设置在该承接板上;
    支撑压板,通过立柱安装在承接板上,该压板设置有内螺纹;
    压板螺母,其具有外螺纹,该外螺纹与该压板的内螺纹配合。
CN2009200739111U 2009-05-19 2009-05-19 直立式电动液压推土器 Expired - Fee Related CN201522396U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009200739111U CN201522396U (zh) 2009-05-19 2009-05-19 直立式电动液压推土器

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009200739111U CN201522396U (zh) 2009-05-19 2009-05-19 直立式电动液压推土器

Publications (1)

Publication Number Publication Date
CN201522396U true CN201522396U (zh) 2010-07-07

Family

ID=42508574

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009200739111U Expired - Fee Related CN201522396U (zh) 2009-05-19 2009-05-19 直立式电动液压推土器

Country Status (1)

Country Link
CN (1) CN201522396U (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103134912A (zh) * 2013-02-27 2013-06-05 中交第一航务工程勘察设计院有限公司 电动液压反力装置推土器
CN103196695A (zh) * 2013-02-06 2013-07-10 中交水运规划设计院有限公司 样筒固定与顶样装置及包含该装置的顶样器
CN107179211A (zh) * 2017-06-21 2017-09-19 北京农学院 一种液压原状土取土钻
CN108287085A (zh) * 2018-03-27 2018-07-17 昆明理工大学 一种液压控制的原状土取土装置
CN109837883A (zh) * 2019-03-01 2019-06-04 浙江大学城市学院 一种人工冻结土电动推土器及推土方法
CN109870324A (zh) * 2019-03-01 2019-06-11 浙江大学城市学院 一种直立式电动推土器及使用方法

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103196695A (zh) * 2013-02-06 2013-07-10 中交水运规划设计院有限公司 样筒固定与顶样装置及包含该装置的顶样器
CN103196695B (zh) * 2013-02-06 2015-07-01 中交水运规划设计院有限公司 样筒固定与顶样装置及包含该装置的顶样器
CN103134912A (zh) * 2013-02-27 2013-06-05 中交第一航务工程勘察设计院有限公司 电动液压反力装置推土器
CN107179211A (zh) * 2017-06-21 2017-09-19 北京农学院 一种液压原状土取土钻
CN107179211B (zh) * 2017-06-21 2023-05-02 北京农学院 一种液压原状土取土钻
CN108287085A (zh) * 2018-03-27 2018-07-17 昆明理工大学 一种液压控制的原状土取土装置
CN109837883A (zh) * 2019-03-01 2019-06-04 浙江大学城市学院 一种人工冻结土电动推土器及推土方法
CN109870324A (zh) * 2019-03-01 2019-06-11 浙江大学城市学院 一种直立式电动推土器及使用方法

Similar Documents

Publication Publication Date Title
CN201522396U (zh) 直立式电动液压推土器
CN103424326B (zh) 煤岩截割试验装置及截割刀具试验方法
CN103760087B (zh) 用于岩体渗流试验的可持续加压的渗透装置
CN204491710U (zh) 一种小型挖掘机用双泵合流液压回路
CN203732406U (zh) 用于岩体渗流试验的可持续加压的渗透装置
CN104100763A (zh) 浮筒截流阀
CN101852696B (zh) 一种双向进压液压装置
CN110031259A (zh) 一种用于软土的主动下压式活阀薄壁取土器
CN204510165U (zh) 一种手动活动坝
CN204004727U (zh) 浮筒截流阀
CN107179271B (zh) 多功能土坡抗渗稳定性测试箱及其测试方法
CN106735155B (zh) 一种钢包精确灌引流砂装置
CN202466566U (zh) 一种用于水平链刀式整体切割成墙设备的开式液压系统
CN205449760U (zh) 一种用于破碎岩石水砂两相渗流的试验装置
CN206593902U (zh) 一种油罐取样装置
CN211205750U (zh) 一种挖掘机脚踏阀可靠性试验装置
CN204510222U (zh) 一种长螺旋钻机取土器
CN206343619U (zh) 一种钢包精确灌引流砂装置
CN209607270U (zh) 一种隧道围岩渗流模型试验箱
CN204533596U (zh) 一种用于疏浚排泥管道液压闸阀
CN201671593U (zh) 上旋塞开闭的控制装置
CN207147833U (zh) 一种排水管道原状沉积物采样器
CN208951484U (zh) 一种给水排水管变径连接装置
CN208604600U (zh) 防溢浆装置
CN105675472A (zh) 一种可持续加砂的泵站式破碎岩石渗透试验装置

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CCCC THIRD HARBOR CONSULTANTS CO.,LTD.

Free format text: FORMER OWNER: CCCC THIRD HARBOR CONSULTANTS CO., LTD.

Effective date: 20110707

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Niu Jianding

Inventor after: Feng Beilei

Inventor after: Wang Zhaoming

Inventor after: Chen Zhiyong

Inventor after: Hu Jianping

Inventor after: Zhang Cheng

Inventor after: Zheng Jianchao

Inventor after: Huang Guodi

Inventor before: Feng Beilei

Inventor before: Wang Zhaoming

Inventor before: Chen Zhiyong

Inventor before: Hu Jianping

Inventor before: Zhang Cheng

Inventor before: Zheng Jianchao

Inventor before: Huang Guodi

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: FENG BEILEI WANG ZHAOMING CHEN ZHIYONG HU JIANPING ZHANG CHENG ZHENG JIANZHAO HUANG GUODI TO: NIU JIANDING FENG BEILEI WANG ZHAOMING CHEN ZHIYONG HU JIANPING ZHANG CHENG ZHENG JIANZHAO HUANG GUODI

Free format text: CORRECT: ADDRESS; FROM: 200135 NO. 221, MINSHENG ROAD, PUDONG NEW DISTRICT, SHANGHAI TO: 200032 NO. 831, ZHAOJIABANG ROAD, SHANGHAI

TR01 Transfer of patent right

Effective date of registration: 20110707

Address after: 200032, 831 Jia Jia Road, Shanghai

Patentee after: CCCC Third Harbor Consultants Co., Ltd.

Address before: 200135 No. 221 Minsheng Road, Shanghai, Pudong New Area

Patentee before: CCCC Third Harbor Consultants Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100707

Termination date: 20170519