CN201521979U - Three-passage flow uniformizing part - Google Patents

Three-passage flow uniformizing part Download PDF

Info

Publication number
CN201521979U
CN201521979U CN2009202367293U CN200920236729U CN201521979U CN 201521979 U CN201521979 U CN 201521979U CN 2009202367293 U CN2009202367293 U CN 2009202367293U CN 200920236729 U CN200920236729 U CN 200920236729U CN 201521979 U CN201521979 U CN 201521979U
Authority
CN
China
Prior art keywords
room
chamber
main body
air channel
flue
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009202367293U
Other languages
Chinese (zh)
Inventor
霍沛强
潘灏
范永春
李伟科
樊晓茹
尹进
宁继宏
刘堂礼
姚友江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Energy Engineering Group Guangdong Electric Power Design Institute Co Ltd
Huaneng Power International Inc
Original Assignee
Guangdong Electric Power Design Institute
Huaneng Power International Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Electric Power Design Institute, Huaneng Power International Inc filed Critical Guangdong Electric Power Design Institute
Priority to CN2009202367293U priority Critical patent/CN201521979U/en
Application granted granted Critical
Publication of CN201521979U publication Critical patent/CN201521979U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Incineration Of Waste (AREA)

Abstract

The utility model discloses a three-passage flow uniformizing part. The three-passage flow uniformizing part is arranged between the outlet of a boiler flue and the inlet air ducts of a first chamber, a second chamber and a third chamber, wherein the inlet of a main body is connected with the outlet side of the boiler flue; a first partition plate and a second partition plate are arranged in the outlet side of the main body for dividing the inner cavity three cavities; and the air ducts of the first chamber, the second chamber and the three chamber are respectively communicated with the three cavities through pipes. The three-passage flow uniformizing part can reduce the difference of smoke flow rate and dust content in each chamber, so that a dust removing apparatus has the balance load distribution in each passage, thereby effectively improving the dust removal efficiency.

Description

Three fens flue flow equalizing parts
Technical field
The utility model relates to the parts in a kind of coal-fired unit flue system, especially relates to three fens flue flow equalizing parts of the coal-fired unit of 1000MW.
Background technology
In the flue system of the coal-fired unit of routine, tend to be provided with deduster, and the interface of this deduster is three, and the exhaust gas volumn that requires three interfaces to enter is uniform distribution, especially in the coal-fired unit of 1000MW, be provided with three chambers in the deduster of its use, because the exhaust gas volumn that unit produces is big, in order better to bring into play the effect of electric precipitation, even for the flow of three chambers distribution in the deduster.Consult Fig. 1 and Fig. 2, during existing flue is arranged, the boiler flue outlet directly is connected on the bottom of vertical bellows 1, on the top of vertical bellows 1 respectively level be provided with and lead to first Room 2, the air channel 5 of second Room 3 and the 3rd Room 4, the boiler flue outlet, the cross section in vertical bellows 1 and air channel 5 is rectangle, many sharp turns, interconnected position, there is flow blind angle, so, because the effect of inertia of ash in the flue gas, boiler smoke exports at boiler flue, when turning in vertical bellows and the air channel, increase in the outside of elbow concentration, inboard concentration reduces, and the height deficiency of vertical bellows 1, the dust that the back centrifugal force of turning causes distributes seriously inhomogeneous, cause entering each indoor tolerance inequality, the flue gas concentration difference, three indoor live loads differ greatly, and have a strong impact on efficiency of dust collection.If come each indoor tolerance of balance by the mode that on air channel 5, increases flow regulator, can increase circulating resistance again, and easy dust stratification.
Summary of the invention
The purpose of this utility model provides and a kind ofly reduces the flue gas deviation, makes each chamber sharing of load equilibrium of cleaner and three fens high flue flow equalizing parts of efficiency of dust collection.
Technical solution of the present utility model is: the equal stream unit of a kind of triple channel, be arranged between the inlet air channel of the boiler flue outlet and first Room, second Room, the 3rd Room, the entrance side of its main body connects described boiler flue outlet, be provided with first dividing plate and the second partition that its inner chamber are separated into three chambers in the outlet side, the air channel of described first Room, second Room and the 3rd Room is communicated with three chambers of main body respectively by pipeline.
By two dividing plates are set in main body, make its inner chamber be separated into three independent cavity, the flue of boiler flue outlet has entered and just has been separated into three strands in the main body like this, finish the distribution of flue gas and dust, make and enter three indoor exhaust gas volumns of deduster and dust content basically identical, effectively reduced each chamber and entered dust content deviation and flow deviation, the sharing of load equilibrium has improved the efficient of dedusting.
Elbow quantity on the pipeline between each described air channel and the described main body is identical respectively.Because it is bigger that elbow accounts for the share of flow resistance, by the elbow quantity between unified each air channel and the main body, the resistance in can each air channel of efficient balance guarantees that flow is even in each air channel, further improves the efficiency of dust collection of whole deduster.
The utility model has the advantages that: reduced entering each indoor flue gas flow deviation and dustiness deviation, made each passage internal loading of cleaner divide balancing, effectively raised efficiency of dust collection.
Description of drawings
Accompanying drawing 1 is the plan view that flue is arranged in the prior art;
Accompanying drawing 2 is the sectional drawing that flue is arranged in the prior art;
Accompanying drawing 3 is the plan view that flue is arranged among the utility model embodiment;
Accompanying drawing 4 is the sectional drawing that flue is arranged among the utility model embodiment;
1, vertical bellows, 2, first Room, 3, second Room, the 4, the 3rd Room, 5, the air channel, 6, main body, 7, first dividing plate, 8, second partition, 9, elbow.
The specific embodiment
Embodiment:
Consult Fig. 3 and 4, the equal stream unit of a kind of triple channel, be arranged between the inlet air channel 5 of first Room 2, second Room 3, the 3rd Room 4 of boiler flue outlet and deduster, the entrance side of its main body 1 connects described boiler flue outlet, be provided with the air channel 5 that its inner chamber is separated into first dividing plate 7 of three chambers and second partition Room 28, the first, second Room 3 and the 3rd Room 4 is communicated with main body 1 respectively by pipeline three chambers in the outlet side.
In the present embodiment, elbow 9 quantity on the pipeline between each air channel 5 and the main body 1 are identical respectively, all are 2.Because to occupy share less for the resistance of straight tube in the pipeline, though the length of straight pipe that is connected between each air channel 5 and the main body 1 is variant, but this difference is less to the influence of whole pipe internal resistance, and elbow 9 quantity are identical, the quantity of the elbow 9 that comparative resistance is bigger is identical, thereby can guarantee the gas-flow resistance basically identical in every pipeline substantially, corresponding flow also relatively evenly.If accomplish that the resistance in three pipelines is identical, accurately distribute flue gas and dust, can also adjust the gap of first dividing plate 7 and second partition 8, realize thereby change the area of distributing for each air channel.
Above-listed detailed description is specifying at one of the utility model possible embodiments, this embodiment is not in order to limit claim of the present utility model, allly do not break away from the equivalence that the utility model does and implement or change, all should be contained in the claim of this case.

Claims (2)

1. equal stream unit of triple channel, be arranged between the inlet air channel of the boiler flue outlet and first Room, second Room, the 3rd Room, it is characterized in that: the entrance side of its main body connects described boiler flue outlet, be provided with first dividing plate and the second partition that its inner chamber are separated into three chambers in the outlet side, the air channel of described first Room, second Room and the 3rd Room is communicated with three chambers of main body respectively by pipeline.
2. the equal stream unit of a kind of triple channel according to claim 1 is characterized in that: the elbow quantity on the pipeline between each described air channel and the described main body is identical respectively.
CN2009202367293U 2009-09-30 2009-09-30 Three-passage flow uniformizing part Expired - Fee Related CN201521979U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009202367293U CN201521979U (en) 2009-09-30 2009-09-30 Three-passage flow uniformizing part

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009202367293U CN201521979U (en) 2009-09-30 2009-09-30 Three-passage flow uniformizing part

Publications (1)

Publication Number Publication Date
CN201521979U true CN201521979U (en) 2010-07-07

Family

ID=42508155

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009202367293U Expired - Fee Related CN201521979U (en) 2009-09-30 2009-09-30 Three-passage flow uniformizing part

Country Status (1)

Country Link
CN (1) CN201521979U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105351954A (en) * 2015-11-25 2016-02-24 中国能源建设集团广东省电力设计研究院有限公司 Flue system for outlet of tower-type furnace air pre-heater of thermal power plant
CN105042624B (en) * 2015-08-20 2017-06-16 中国能源建设集团广东省电力设计研究院有限公司 The guiding device of air and gas system and its cold Secondary Air entrance of air preheater

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105042624B (en) * 2015-08-20 2017-06-16 中国能源建设集团广东省电力设计研究院有限公司 The guiding device of air and gas system and its cold Secondary Air entrance of air preheater
CN105351954A (en) * 2015-11-25 2016-02-24 中国能源建设集团广东省电力设计研究院有限公司 Flue system for outlet of tower-type furnace air pre-heater of thermal power plant

Similar Documents

Publication Publication Date Title
WO2009143016A3 (en) Skimmer for concentrating an aerosol
CN201521979U (en) Three-passage flow uniformizing part
CN2821408Y (en) Step type cut-off ir inlet path
CN201711053U (en) Big bag-type dust collector with brick-concrete structure
CN201776035U (en) Uniform gas distribution system of bag filter
CN203458338U (en) Four-level cyclone separator
CN104525392A (en) Cyclone separator with gradually enlarged inlet, flow guide plate and dustproof screen and experiment system
CN202915049U (en) Energy dissipation ring pipe system of long-distance ore pulp pipe
CN103939927A (en) Smoke duct and three-in-one collecting pipe thereof
CN2820293Y (en) Wedge type cut-off air inlet channel
CN102794057B (en) Technology for uniformly distributing fume flow in large bag-type dust collector
CN207975753U (en) A kind of air purifier
CN203869066U (en) Smoke and air flue and three-in-one flow collecting pipe thereof
CN104879765A (en) Six-outlet two-row rear flue gas and air system combined arrangement structure with flue gas waste heat recovery device
CN209197438U (en) A kind of drying oven air draft pipe
CN204194133U (en) House outlet flue gas collector-shoe gear
CN205019870U (en) Sack cleaner collection wind and smoke case
CN104791821A (en) Combined arrangement structure of four outlets of dust remover and rear smoke and air systems of two rows of induced draft fans for power plant
CN205965381U (en) Filter with air distributor
CN208482172U (en) A kind of deduster air-intake device and bag filter
CN204704830U (en) With air and gas system combination layout structure after four outlet biserials of flue gas waste heat recovery apparatus
CN204704832U (en) The rear air and gas system combination layout structure that power plant exports with deduster six
CN106111336A (en) A kind of wet electrical dust precipitator direct exhaust chimney uniform gas distribution system
CN204704833U (en) With air and gas system combination layout structure after six outlet biserials of flue gas waste heat recovery apparatus
CN201507750U (en) Three-channel confluence part

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA ENERGY ENGINEERING GROUP GUANGDONG ELECTRIC

Free format text: FORMER NAME: GUANGDONG ELECTRIC POWER DESIGN INSTITUTE

CP03 Change of name, title or address

Address after: 510663 Luogang District, Guangdong, Guangzhou Science City Fung Road, No. 1, No.

Patentee after: GUANGDONG ELECTRIC POWER DESIGN INSTITUTE OF CHINA ENERGY ENGINEERING GROUP Co.,Ltd.

Patentee after: Huaneng Power International,Inc.

Address before: 510600 No. 846 Dongfeng East Road, Guangzhou, Guangdong, Yuexiu District

Patentee before: Guangdong Electric Power Design Institute

Patentee before: Huaneng Power International,Inc.

C56 Change in the name or address of the patentee

Owner name: CHINA ENERGY ENGINEERING GROUP GUANGDONG ELECTRIC

Free format text: FORMER NAME: CHINA ENERGY ENGINEERING GROUP GUANGDONG ELECTRIC POWER DESIGN INSTITUTE

CP01 Change in the name or title of a patent holder

Address after: 510663 Luogang District, Guangdong, Guangzhou Science City Fung Road, No. 1, No.

Patentee after: CHINA ENERGY ENGINEERING GROUP GUANGDONG ELECTRIC POWER DESIGN INSTITUTE Co.,Ltd.

Patentee after: Huaneng Power International,Inc.

Address before: 510663 Luogang District, Guangdong, Guangzhou Science City Fung Road, No. 1, No.

Patentee before: GUANGDONG ELECTRIC POWER DESIGN INSTITUTE OF CHINA ENERGY ENGINEERING GROUP Co.,Ltd.

Patentee before: Huaneng Power International,Inc.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100707

Termination date: 20160930