CN201510838U - Chlorine gas absorption tower - Google Patents
Chlorine gas absorption tower Download PDFInfo
- Publication number
- CN201510838U CN201510838U CN200920021715XU CN200920021715U CN201510838U CN 201510838 U CN201510838 U CN 201510838U CN 200920021715X U CN200920021715X U CN 200920021715XU CN 200920021715 U CN200920021715 U CN 200920021715U CN 201510838 U CN201510838 U CN 201510838U
- Authority
- CN
- China
- Prior art keywords
- chlorine gas
- tower body
- shower
- tower
- gas absorption
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Treating Waste Gases (AREA)
Abstract
The utility model discloses a chlorine gas absorption tower, which comprises a tower body. A gas inlet pipe is installed at the lower part of the tower body. A gas outlet pipe is installed at the upper part of the tower body. A first shower pipe and a second shower pipe perpendicular to the first shower pipe are installed at the upper part of the tower body. A first hanging rod and a second hanging rod are installed in the tower body. A plurality of parallel baffle plates are installed between the first hanging rod and the second hanging rod. The baffle plates are of bended shape. The utility model has the advantages that since the baffle plates are arranged, the chlorine gas ascending speed in the tower is slowed down, the time and the area of contact between chlorine gas and sulfuric acid are increased, chlorine gas absorption rate is greatly improved by 30 percent to 50 percent when being compared with the existing chlorine gas absorption tower, and the effect is very obvious; since two shower pipes perpendicular to each other are arranged, the shower area is increased, the dead shower zone is eliminated and the chlorine gas absorption rate is improved; since restriction plates are arranged, the chlorine gas ascending speed is slowed down, the stay duration of chlorine gas in the tower is improved and the chlorine gas absorption rate is increased; and the structure is simple and reasonable, the chlorine gas absorption tower is not apt to be damaged and the like.
Description
Technical field
The utility model relates to the chlorine absorption unit field, specifically is a kind of chlorine gas absorption tower.
Background technology
At present, for the chlorine that prevents to produce in the industrial production enters other devices or enters the atmosphere pollution environment, generally adopt chlorine gas absorption tower that chlorine is absorbed.In use there is following problem in existing chlorine gas absorption tower: after chlorine entered the absorption tower, its rate of climb was too fast, can't fully be absorbed, and causing exporting still has chlorine to exist in the gas, polluted.
Summary of the invention
The purpose of this utility model is to provide a kind of chlorine gas absorption tower, and it can solve the deficiency that exists in the known technology, and by deflection plate is set, the chlorine rate of climb in the tower that slows down fully contacts chlorine with sulfuric acid, increase the chlorine absorptivity greatly.
The utility model for achieving the above object, be achieved through the following technical solutions: a kind of chlorine gas absorption tower, comprise tower body, the tower body bottom is installed into tracheae, and escape pipe is installed on tower body top, and orthogonal first shower and second shower are installed in tower body top, first peg and second peg are installed in the tower body, some deflection plates are installed between first peg and second peg, are parallel to each other between deflection plate, deflection plate is a bending.Baffle(s) spacing is 0.5cm-1.5cm.The 3rd peg and the 4th peg are installed in the tower body, some deflection plates are installed between the 3rd peg and the 4th peg.Current limiting plate is installed in the bottom in the tower body, offers pod apertures on the current limiting plate.On first shower and second shower shower nozzle is installed.
Advantage of the present utility model is: by deflection plate is set, chlorine rises in the tower that can slow down, and increases chlorine and sulfuric acid time of contact and area, significantly improve the chlorine absorptivity, existing relatively chlorine gas absorption tower, chlorine absorptivity of the present utility model can improve 30%-50%, and effect is very obvious; Two orthogonal showers are set, increase spray area, remove the spray dead angle, improve the chlorine absorptivity; Be provided with current limiting plate, the chlorine rate of climb that can slow down improves the holdup time of chlorine in tower, increases the chlorine absorptivity; Simple for structure reasonable, not fragile etc.
Description of drawings
The specific embodiment
The contrast accompanying drawing is described further the utility model:
The utility model agent structure has tower body 10, tower body 10 bottoms are installed into tracheae 14, escape pipe 7 is installed on tower body 10 tops, orthogonal first shower 8 and second shower 9 are installed in tower body 10 tops, first shower 8 is connected with outer water tube with second shower 9, orthogonal first shower 8 and second shower 9 can effectively increase spray area, improve the chlorine absorptivity.In the described tower body 10 first peg 1 and second peg 3 are installed, 3 of first peg 1 and second pegs are installed some deflection plates 2,2 maintenances of deflection plate are parallel to each other, described deflection plate 2 is a bending, in the use, chlorine is subjected to deflection plate 2 obstructions in the tower body 10 when rising, and slows down the rate of climb, and chlorine fully is absorbed in tower body 10.
The spacing of above-mentioned deflection plate 2 is preferably 0.5cm-2cm, and the spacing of deflection plate 2 is less than 0.5cm, and then the chlorine rate of climb is slow excessively, and chlorine treatment efficient is low; The spacing of deflection plate 2 is greater than 2cm, and the chlorine rate of climb is too fast, and the chlorine absorptivity is low; When the spacing of deflection plate 2 was preferably 0.5cm-2cm, the chlorine treatment effect was best.
The structure of the utility model embodiment is: tower body 10 is arranged, tower body 10 bottoms are installed into tracheae 14, escape pipe 7 is installed on tower body 10 tops, orthogonal first shower 8 and second shower 9 are installed in tower body 10 tops, first peg 1 is installed in the tower body 10, second peg 3, the 3rd peg 4 and the 4th peg 6,3 of first peg 1 and second pegs are installed some deflection plates 2,6 of the 3rd peg 4 and the 4th pegs are installed some deflection plates 2,2 maintenances of deflection plate are parallel to each other, described deflection plate 2 is a bending, among this embodiment, two-layer deflection plate 2 is set, chlorine fully is absorbed in tower body 10, improves the chlorine absorptivity greatly.
In the above-described embodiments, current limiting plate 5 is installed in tower body 10, is offered pod apertures 12 on the current limiting plate 5.Above-mentioned current limiting plate 5 can further reduce the chlorine rate of climb, improves the reaction time of chlorine in tower body 10, increases the chlorine absorptivity.Shower nozzle 11 is installed on first shower 8 and second shower 9, sulfuric acid is more disperseed when spraying, fully contact with chlorine.
Claims (5)
1. chlorine gas absorption tower, comprise tower body (10), tower body (10) bottom is installed into tracheae (14), escape pipe (7) is installed on tower body (10) top, it is characterized in that: orthogonal first shower (8) and second shower (9) are installed in tower body (10) top, and first peg (1) and second peg (3) are installed in the tower body (10), and some deflection plates (2) are installed between first peg (1) and second peg (3), deflection plate is parallel to each other between (2), and deflection plate (2) is a bending.
2. a kind of chlorine gas absorption tower according to claim 1 is characterized in that: deflection plate (2) spacing is 0.5cm-1.5cm.
3. a kind of chlorine gas absorption tower according to claim 1 and 2 is characterized in that: the 3rd peg (4) and the 4th peg (6) are installed in the tower body (10), some deflection plates (2) are installed between the 3rd peg (4) and the 4th peg (6).
4. a kind of chlorine gas absorption tower according to claim 3 is characterized in that: current limiting plate (5) is installed in the interior bottom of tower body (10), offers pod apertures (12) on the current limiting plate (5).
5. a kind of chlorine gas absorption tower according to claim 4 is characterized in that: first shower (8) and second shower (9) are gone up shower nozzle (11) are installed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200920021715XU CN201510838U (en) | 2009-04-28 | 2009-04-28 | Chlorine gas absorption tower |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200920021715XU CN201510838U (en) | 2009-04-28 | 2009-04-28 | Chlorine gas absorption tower |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201510838U true CN201510838U (en) | 2010-06-23 |
Family
ID=42482234
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN200920021715XU Expired - Fee Related CN201510838U (en) | 2009-04-28 | 2009-04-28 | Chlorine gas absorption tower |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201510838U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112755728A (en) * | 2020-12-11 | 2021-05-07 | 深圳市星源空间环境技术有限公司 | Deodorizing device for sewage treatment tank |
-
2009
- 2009-04-28 CN CN200920021715XU patent/CN201510838U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112755728A (en) * | 2020-12-11 | 2021-05-07 | 深圳市星源空间环境技术有限公司 | Deodorizing device for sewage treatment tank |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201880475U (en) | Multifunctional integrated phenol-containing waste gas purification device | |
CN204816203U (en) | A acid mist purification tower for handling acid gas | |
CN105363334A (en) | Polypropylene exhaust gas packing spray tower | |
CN206631400U (en) | A kind of two level cross-flow horizontal washing tower | |
CN101537305A (en) | Chlorine gas absorption tower | |
CN202569948U (en) | Absorption device for wet-process smoke desulfurization and denitrification | |
CN201023022Y (en) | Device for making dilute nitric acid with nitrogen oxide adsorption | |
CN206304558U (en) | Denitration integrated device with high-effective dust-removing | |
CN201510838U (en) | Chlorine gas absorption tower | |
CN204637955U (en) | A kind of acid tail gas absorption tower | |
CN105642100A (en) | Polypropylene acid mist and waste gas purification tower | |
CN203061032U (en) | Tail gas absorbing device | |
CN201889156U (en) | Combined alkaline washing tower | |
CN202179927U (en) | Device for treating waste gas containing nitric acid mist | |
CN105797558A (en) | Polypropylene filler washing tower | |
CN203155054U (en) | Waste gas spray tower | |
CN201752627U (en) | Improved device of ammonium sulfate absorption tower | |
CN204522700U (en) | New and effective laboratory spray column | |
CN201076807Y (en) | Highly effective filler absorbing tower | |
CN213078010U (en) | Horizontal downstream spray desulfurizing tower and desulfurization system | |
CN205613267U (en) | Polyacrylic acid fog waste gas purification | |
CN204704824U (en) | A kind of chemical production equipment vent gas incinerator | |
CN203425675U (en) | Baffling type water scrubber for smelting gas | |
CN216825649U (en) | Multistage waste gas washing tower | |
CN204619720U (en) | Tubular fluid foam desulfurizing duster |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100623 Termination date: 20120428 |