CN201506815U CN2009202262304U CN200920226230U CN201506815U CN 201506815 U CN201506815 U CN 201506815U CN 2009202262304 U CN2009202262304 U CN 2009202262304U CN 200920226230 U CN200920226230 U CN 200920226230U CN 201506815 U CN201506815 U CN 201506815U
Authority
CN
China
Prior art keywords
chimney
heat treated
purging
chamber
synchronous
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2009202262304U
Other languages
Chinese (zh)
Inventor
王会波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Hui Feng transmission limited company
Original Assignee
LAIWU HUIFENG AUTOMOBILE GEAR SHAFT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LAIWU HUIFENG AUTOMOBILE GEAR SHAFT CO Ltd filed Critical LAIWU HUIFENG AUTOMOBILE GEAR SHAFT CO Ltd
Priority to CN2009202262304U priority Critical patent/CN201506815U/en
Application granted granted Critical
Publication of CN201506815U publication Critical patent/CN201506815U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model discloses a synchronous two-way opposite purging equivalent temperature normalizing rapid cooling chamber, which comprises a chamber outer shell (1), a heat processing workpiece pushing-in door (2), a workpiece pushing-out door (3) after air cooling, a fan (4), an air pipe (5) and a chimney (6). The synchronous two-way opposite purging equivalent temperature normalizing rapid cooling chamber is characterized in that upper arc tile-shaped folded plates (7) are fixed on the surrounding wall on the upper portion in the room outer shell (1), the chimney (6) is fixed on the rear side portion on the top wall of the chamber outer shell (1), the middle portion in the chamber outer shell (1) is provided with a channel (9) which is communicated with an inlet of the chimney (6), compared with existing devices which are used in rapid cooling chambers for purging hot processing workpieces upwards and downwards, since blowing air can blow the upper surfaces and the lower surfaces of the hot processing workpieces simultaneously and synchronously under the blowing of one fan, the temperature reduction of the hot processing workpieces can be even, the cooling speed is consistent, and the synchronous two-way opposite purging equivalent temperature normalizing rapid cooling chamber not only can improve the hot processing quality and reduce the waste product rate, but also has simple structure and easy operation and control, and can be widely used in cross wedge rolling production lines.

Description

Synchronous bidirectional is to blowing the isothermal normalizing quick cooling chamber
Technical field
The utility model relates to the improvement of the interior heat treated part quick cooling chamber of stove in a kind of isothermal normalizing heat-treatment production line, and specifically a kind of synchronous bidirectional is to blowing the isothermal normalizing quick cooling chamber.Be applicable to a class part isothermal normalizing heat treatment step.
Background technology
The isothermal normalizing stove comprises High Temperature Furnaces Heating Apparatus, constant-temperature oven, quick cooling chamber and blowing device, material transfer mechanism, heating system and electrical means, need the workpiece of heat treated at first to arrive desired austenitizing temperature at the High Temperature Furnaces Heating Apparatus internal heating, push quick cooling chamber by push rod again, when in quick cooling chamber, drying the temperature range that is cooled to set with fast speeds by blowing device, rapidly heat treated part is pushed and carry out isothermal in the constant-temperature oven, the beginning phase transformation also keeps this temperature to finish until phase transformation.The isothermal normalizing thermal treatment process is because of obtaining organizing relatively evenly and the less relatively forged steel pieces of nonhomogeneous hardness is widely used in treatment production.Described quick cooling chamber comprises chamber enclosure, the heat treated part push-in door, air-cooled back workpiece is released door, blower fan, airduct and chimney constitute, the air outlet of airduct is fixedlyed connected with the bottom centre of chamber enclosure, chimney is fixed on the roof middle part of chamber enclosure, the blast inlet of airduct is connected with blower fan, cold wind is blown into from the bottom centre of chamber enclosure, blow to the bottom surface of heat treated part, around heat treated part, around above heat treated part, entering chimney blows out, the heat treated part push-in door is located at an end that is connected with High Temperature Furnaces Heating Apparatus, and air-cooled back workpiece is released door and is located at an end that is connected with constant-temperature oven.The quick cooling chamber of this structure, because the bottom surface that cold wind directly blows heat treated part causes the bottom surface of heat treated part to form malleation, cold blast rate is big, cooling is fast; And heat treated part above, periphery is an eddy current, the center then forms negative pressure, cooling rate is slow.This upper and lower temperature contrast of heat treated part can cause heat treated part hardness inhomogeneous or metallographic structure is defective, and scrap rate rises; Particularly when a plurality of heat treated parts are cooled off simultaneously fast, also can produce the notable difference of speed of cooling and respective phase change effect between each heat treated part, cause and occur distributing eutectoid ferrite, Widmannstatten structure, bainite even martensite improperly in heat treated part part or the global tissue, and and thick perlite form phenomenons such as mixed grain structure, make road processing difficulties behind the heat treated part, degradation.For addressing this problem, what have has increased switch and converting system on airduct, pass through switch, for a moment from the bottom surface of heat treated part to up-draught, for a moment again from the blowing that faces down of heat treated part, though certain effect is arranged, cooling is intermittent, so can not thoroughly solve the uneven problem of cooling; The minimizing that has heated components Intake Quantity or increase spacing between the heated components, but influence working efficiency.
Summary of the invention
The purpose of this utility model is to provide a kind of can neither influence working efficiency from the cooling of drying simultaneously of the upper and lower both direction of heat treated part, and the synchronous bidirectional that can make the quick uniform decrease in temperature of heat treated part again is to blowing the isothermal normalizing quick cooling chamber.
For reaching above purpose, the technical scheme that the utility model adopted is: this synchronous bidirectional is to blowing the isothermal normalizing quick cooling chamber, comprise chamber enclosure, the heat treated part push-in door, air-cooled back workpiece is released door, blower fan, airduct and chimney constitute, the air outlet of airduct is fixedlyed connected with the bottom centre of chamber enclosure, the blast inlet of airduct is connected with blower fan, cold wind is blown into from the bottom centre of chamber enclosure, blow to the bottom surface of heat treated part, around heat treated part, around above heat treated part, the heat treated part push-in door is located at an end that is connected with High Temperature Furnaces Heating Apparatus, air-cooled back workpiece is released door and is located at an end that is connected with constant-temperature oven, arc watt shape flap on it is characterized in that fixing on the top perisporium in chamber enclosure, around the blowing above heat treated part, flow along arc watt shape flap, force blowing to be turned back, blow to heat treated part above, chimney is fixed on the rear lateral portion on the chamber enclosure roof, middle part in chamber enclosure is provided with the passage that communicates with the chimney import, and the top blowing that blows to heat treated part enters chimney along the passage that communicates with the chimney import.
The utility model is also implemented by following measure: arc watt shape flap is inboard to be 25-35cm along the distance above heated components, and the channel diameter that communicates with the chimney import is than the big 2-4 of air outlet diameter times of airduct.
The beneficial effects of the utility model are: with use in quick cooling chamber at present the upper and lower device that blows of heat treated part is compared, because under the blowing of same blower fan, blowing can be simultaneously, synchronously to the above and below of heat treated part to blowing, cause the heat treated part lowering temperature uniform, the speed of cooling unanimity, can not only improve thermal treatment quality, reduce scrap rate, and simple in structure, easy handling control.
Description of drawings
Fig. 1, be the utility model structure cross-sectional schematic vertically.
Fig. 2, be that the utility model is along A-A section cross-sectional schematic.
Fig. 3, be the flow schematic diagram of drying among Fig. 1.
Fig. 4, be the flow schematic diagram of drying among Fig. 2.
Embodiment
Make the utility model with reference to Fig. 1,2.This synchronous bidirectional is to blowing the isothermal normalizing quick cooling chamber, comprise chamber enclosure 1, heat treated part push-in door 2, air-cooled back workpiece is released door 3, blower fan 4, airduct 5 and chimney 6 constitute, the air outlet of airduct 5 is fixedlyed connected with the bottom centre of chamber enclosure 1, the blast inlet of airduct 5 is connected with blower fan 4, cold wind is blown into from the bottom centre of chamber enclosure 1, blow to the bottom surface of heat treated part 8, around heat treated part 8, around above heat treated part 8, heat treated part push-in door 2 is located at an end that is connected with High Temperature Furnaces Heating Apparatus, air-cooled back workpiece is released door 3 and is located at an end that is connected with constant-temperature oven, arc watt shape flap 7 on it is characterized in that fixing on the top perisporium in chamber enclosure 1, around to heat treated part 8 above blowing, flow along arc watt shape flap 7, force blowing to be turned back, blow to heat treated part 8 above, make the top malleation that also forms of heat treated part 8, strengthen cooling, chimney 6 is fixed on the rear lateral portion on chamber enclosure 1 roof, middle part in chamber enclosure 1 is provided with the passage 9 that communicates with chimney 6 imports, and the top blowing that blows to heat treated part 8 enters chimney 6 along the passage 9 that communicates with chimney 6 imports.
Arc watt shape flap 7 distances of inboard edge above heat treated part 8 are 25-35cm, and passage 9 diameters that communicate with chimney 6 imports are than the big 2-4 of air outlet diameter times of airduct 5.

Claims (2)

1. a synchronous bidirectional is to blowing the isothermal normalizing quick cooling chamber, comprise chamber enclosure (1), heat treated part push-in door (2), air-cooled back workpiece is released door (3), blower fan (4), airduct (5) and chimney (6) constitute, the air outlet of airduct (5) is fixedlyed connected with the bottom centre of chamber enclosure (1), the blast inlet of airduct (5) is connected with blower fan (4), air-cooled back workpiece is released door (3) and is located at an end that is connected with constant-temperature oven, it is characterized in that the fixing arc watt shape flap (7) of going up on the top perisporium in chamber enclosure (1), chimney (6) is fixed on the rear lateral portion on chamber enclosure (1) roof, and the middle part in chamber enclosure (1) is provided with the passage (9) that communicates with chimney (6) import.
2. synchronous bidirectional according to claim 1 is to blowing the isothermal normalizing quick cooling chamber, it is characterized in that the distance of the inboard edge of described arc watt shape flap (7) above heat treated part (8) is 25-35cm, passage (9) diameter that communicates with chimney (6) import is than the big 2-4 of air outlet diameter times of airduct (5).
CN2009202262304U 2009-09-15 2009-09-15 Synchronous two-way opposite purging equivalent temperature normalizing rapid cooling chamber Expired - Lifetime CN201506815U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009202262304U CN201506815U (en) 2009-09-15 2009-09-15 Synchronous two-way opposite purging equivalent temperature normalizing rapid cooling chamber

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009202262304U CN201506815U (en) 2009-09-15 2009-09-15 Synchronous two-way opposite purging equivalent temperature normalizing rapid cooling chamber

Publications (1)

Publication Number Publication Date
CN201506815U true CN201506815U (en) 2010-06-16

Family

ID=42467945

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009202262304U Expired - Lifetime CN201506815U (en) 2009-09-15 2009-09-15 Synchronous two-way opposite purging equivalent temperature normalizing rapid cooling chamber

Country Status (1)

Country Link
CN (1) CN201506815U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103352103A (en) * 2013-06-30 2013-10-16 贵州安大航空锻造有限责任公司 Thermal treatment cooling device
CN103468890A (en) * 2013-10-16 2013-12-25 湖州中联机械制造有限公司 Air-cooling normalization temperature-lowering device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103352103A (en) * 2013-06-30 2013-10-16 贵州安大航空锻造有限责任公司 Thermal treatment cooling device
CN103468890A (en) * 2013-10-16 2013-12-25 湖州中联机械制造有限公司 Air-cooling normalization temperature-lowering device

Similar Documents

Publication Publication Date Title
CN100457349C (en) Air protecting and heating type braze welding furnace
CN202938629U (en) Heat treatment furnace using waste heat for preheating
CN103898280A (en) Residual-heat available roll-bar type rapid-cooling furnace
CN103290191A (en) Device for recycling afterheat of thermal treatment furnace
CN202595225U (en) Cooling system of bell-type bright annealing furnace
CN201506815U (en) Synchronous two-way opposite purging equivalent temperature normalizing rapid cooling chamber
CN201193236Y (en) Thermal recovery type continuous isothermal normalizing furnace
CN207276657U (en) A kind of annealing energy-saving furnace
CN203295556U (en) Heat-treatment furnace system for waste heat recovery
CN201190174Y (en) Fast-cooling device of heat treating workpiece
CN203112868U (en) After-heat-usable roller-type quick cooling furnace
CN200996035Y (en) Air cooler for bright annealing furnace
CN201463609U (en) High-temperature material gas rapid injection cooing unit
CN203758242U (en) Novel heating furnace
CN101225462B (en) Automobile wheel hub continuous heat-treating furnace
CN200999254Y (en) Automobile wheel hub continuous heat-treating furnace
CN202989213U (en) Quick annealing furnace
CN202214381U (en) Bidirectional trolley type thermal treatment furnace
CN203878194U (en) Push-disk aluminum alloy solid solution aging heat treatment production line
CN203236084U (en) Air-heating brazing equipment
CN101812573B (en) Gas-heated multipurpose roller hearth furnace
CN205175148U (en) Steel ball waste heat recovery utilizes system
CN201331256Y (en) Air blocking device for high temperature furnace tube
CN104259358A (en) Heating mechanism of aluminum alloy blank
CN204803353U (en) Energy -efficient annealing stove

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: SHANDONG HUIFENG GEAR CO., LTD.

Free format text: FORMER NAME: LAIWU HUIFENG AUTO GEAR CO., LTD.

CP03 Change of name, title or address

Address after: Yan Zhuang Industrial Park, 271103 Shandong province Laiwu City Gangcheng district (Yan Zhuang - Han Vlei Road No. 001 Lixin section)

Patentee after: Shandong Hui Feng transmission limited company

Address before: Yan Zhuang Industrial Park, 271103 Shandong province Laiwu City Gangcheng district (Yan Zhuang - Han Lixin Vlei road section) No. 001 Laiwu Huifeng Automobile Gear Co. Ltd.

Patentee before: Laiwu Huifeng Automobile Gear Shaft Co., Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20100616