CN201502216U - Assembled guard rail - Google Patents

Assembled guard rail Download PDF

Info

Publication number
CN201502216U
CN201502216U CN2009201042383U CN200920104238U CN201502216U CN 201502216 U CN201502216 U CN 201502216U CN 2009201042383 U CN2009201042383 U CN 2009201042383U CN 200920104238 U CN200920104238 U CN 200920104238U CN 201502216 U CN201502216 U CN 201502216U
Authority
CN
China
Prior art keywords
vertical rods
holes
cross rod
buckle
montant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009201042383U
Other languages
Chinese (zh)
Inventor
韩书同
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2009201042383U priority Critical patent/CN201502216U/en
Application granted granted Critical
Publication of CN201502216U publication Critical patent/CN201502216U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses an assembled guard rail which comprises an upright column and a cross rod connected with the upright column. Through holes are arranged on the cross rod at intervals; vertical rods are inserted into the through holes; fixing pieces are arranged between the through holes and the vertical rods; the fixing pieces adopt buckles which can be clamped and connected on the through holes of the cross rod; perforations for the vertical rods to pass through are arranged on the buckles; inward bulges are arranged at the lower ends of the buckles; and holes matched with the bulges are arranged on the vertical rods. By arranging the bulges arranged on the buckles clamped and connected with the cross rod to be matched with the holes arranged on the vertical rods, the vertical rods are fixed on the cross rod, the vertical rods are prevented from being pulled out from the cross rod, and the purposes of fixing and burglary protection are achieved. As large-scale special equipment is not required to be used for opening rectangular holes on the cross rod and the vertical rods, and a large amount of labor costs are saved, therefore, the assembled guard rail has the advantages of low investment and convenient processing, the cost of the product is lower, and the yield is higher.

Description

The assembly type guardrail
Technical field
The utility model relates to a kind of building product, especially a kind of assembly type guardrail.
Background technology
At present, the guardrail of be used for the protection of places such as balcony, stair, claustra, bridge, road, enclosure wall and garden landscape, isolating all is made up of column, cross bar and montant basically, can be divided into two kinds of the guardrail of field Welding installation and assembly type guardrails.The guardrail that field Welding is installed both can't guarantee precision, the quality and attractive in appearance of railing, took a lot of work again, effort, time-consuming, and operating efficiency is low, and its installation, maintenance is also inconvenient.The installation, maintenance of assembly type guardrail is convenient, solves the shortcoming of the guardrail of field Welding installation.The structure of existing assembly type guardrail is to be connected with cross bar between column, and spacing has through hole on cross bar, and montant is plugged in the through hole, is provided with fixture between through hole and the montant.Place high slightly or that be lower than cross bar and montant joint slightly has rectangular opening on montant, and the bar shaped clamp of fixture for matching with rectangular opening reaches the purpose that prevents that montant from extracting out from cross bar by the bar shaped clamp, plays fixing, antitheft effect.For the montant of the assembly type guardrail that plays this structure of fixation must prolong downwards, forming unnecessary cost increases, and must the employing square tube, and opens rectangular opening in the certain up and down position of square tube; Because of rectangular opening is opened the comparison difficulty, main equipment that need be special, and necessary whole processing cause its investment and cost is higher, yield rate is lower.
The utility model content
The technical problems to be solved in the utility model provides a kind of easy to process, investment is low, yield rate is high assembly type guardrail.
For solving the problems of the technologies described above, the utility model comprises column and the cross bar that joins with column, spacing has through hole on cross bar, montant is plugged in the through hole, be provided with fixture between through hole and the montant, described fixture is the buckle that can be connected on the through hole of cross bar, has on the buckle to hold the perforation that montant passes; Be provided with inside projection in the lower end of buckle, montant is provided with the shrinkage pool that matches with projection.
Adopt the beneficial effect that technique scheme produced to be: the utility model by with the buckle of cross bar clamping on the projection that is provided with match with shrinkage pool on the montant, montant is fixed on the cross bar, prevent that montant from extracting out from cross bar, reach fixing, antitheft purpose.The utility model need not use large-scale special equipment to open rectangular opening on cross bar and montant, the shrinkage pool that only need offer circle or other shape gets final product, do not need special equipment, and saved a large amount of labour costs, only need common bench drill or Electric portable drill get final product, so have small investment, characteristics easy to process.Because of not needing to use special equipment, need not prolong blanking and whole processing to the montant bottom, so the cost of product is lower, yield rate is higher.
Description of drawings
Below in conjunction with the drawings and specific embodiments the utility model is described in further detail.
Fig. 1 is a cross-sectional view of the present utility model;
Fig. 2 is the partial enlarged drawing of A part among Fig. 1.
Fig. 3 is the structural representation of buckle of the present utility model.
The specific embodiment
Shown in Figure 1, this assembly type guardrail, it comprises column and the cross bar 2 that joins with column, and spacing has through hole 7 on cross bar 2, and montant 3 is plugged in the through hole 7, is provided with fixture between through hole 7 and the montant 3.
Shown in Fig. 1,2,3, the described fixture of this assembly type guardrail is the buckle 5 that can be connected on the through hole 7 of cross bar 2, has on the buckle 5 to hold the perforation 9 that montant passes.The horizontal cross sectional geometry of buckle 5 can support square or shape such as circle as required, and the perforation 9 of buckle 5 matches with the shape of montant 3, can be square, also can be circular.Shown in Figure 3, the vertical section of buckle 5 is a ∏ shape, is provided with the groove 6 around buckle 5 peripheries at an upper portion thereof, and the depth of groove 6 matches with through hole 7.Be provided with symmetrical two inside projections 4 in the lower end of buckle 5, be provided with the shrinkage pool 8 that adapts with projection in montant 3 corresponding positions.
This assembly type guardrail is fixed on cross bar 2 between the column earlier when assembling; Buckle 5 is buckled on the through hole 7 of cross bar,, buckle 5 is connected on the through hole 7 by the cooperation of groove 6 and through hole 7; Montant 3 is passed from the perforation 9 of buckle, and when montant 3 reached pairing position, the projection 4 of buckle inwardly pierced in the shrinkage pool 8, thereby realized fixing between cross bar 2, buckle 5 and the montant 3.

Claims (3)

1. assembly type guardrail, it comprises column and the cross bar that joins with column, spacing has through hole on cross bar, montant is plugged in the through hole, be provided with fixture between through hole and the montant, it is characterized in that: described fixture is the buckle that can be connected on the through hole of cross bar, has on the buckle to hold the perforation that montant passes; Be provided with inside projection in the lower end of buckle, montant is provided with the shrinkage pool that matches with projection.
2. assembly type guardrail according to claim 1, the vertical section that it is characterized in that described buckle is a ∏ shape, is provided with the groove that cooperates with through hole around the buckle periphery on the top of buckle.
3. assembly type guardrail according to claim 1 and 2 is characterized in that being provided with in the lower end of buckle symmetrical two projections.
CN2009201042383U 2009-08-11 2009-08-11 Assembled guard rail Expired - Fee Related CN201502216U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009201042383U CN201502216U (en) 2009-08-11 2009-08-11 Assembled guard rail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009201042383U CN201502216U (en) 2009-08-11 2009-08-11 Assembled guard rail

Publications (1)

Publication Number Publication Date
CN201502216U true CN201502216U (en) 2010-06-09

Family

ID=42453152

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009201042383U Expired - Fee Related CN201502216U (en) 2009-08-11 2009-08-11 Assembled guard rail

Country Status (1)

Country Link
CN (1) CN201502216U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102493340A (en) * 2011-12-19 2012-06-13 中国一冶集团有限公司 External mounting type anti-collision guardrails for landscape bridge
CN103711360A (en) * 2013-12-30 2014-04-09 无锡帝安福科技有限公司 Assembled type fence
CN103711359A (en) * 2013-12-30 2014-04-09 无锡帝安福科技有限公司 Elastic non-metal clamping ring used for fence assembling
CN104032694A (en) * 2014-05-23 2014-09-10 江苏爱可青实业有限公司 Connecting structure for road guardrail
CN104762900A (en) * 2015-04-13 2015-07-08 张家港固耐特围栏系统有限公司 Railing fixing block for metal fence
CN105839567A (en) * 2016-03-18 2016-08-10 夏士桀 Metal guardrail convenient to dismount and mount
CN108266043A (en) * 2018-01-12 2018-07-10 江阴市联众安全设施有限公司 A kind of guardrail of fast demountable
CN108278038A (en) * 2017-12-19 2018-07-13 合肥草木蕃景生态科技有限公司 A kind of garden landscape plant guardrail and its installation method
CN108867473A (en) * 2018-06-06 2018-11-23 滁州博昊门业制造有限公司 A kind of dismountable novel guardrail

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102493340A (en) * 2011-12-19 2012-06-13 中国一冶集团有限公司 External mounting type anti-collision guardrails for landscape bridge
CN103711360A (en) * 2013-12-30 2014-04-09 无锡帝安福科技有限公司 Assembled type fence
CN103711359A (en) * 2013-12-30 2014-04-09 无锡帝安福科技有限公司 Elastic non-metal clamping ring used for fence assembling
CN103711360B (en) * 2013-12-30 2016-01-27 无锡帝安福科技有限公司 Assembled fense
CN103711359B (en) * 2013-12-30 2016-05-18 无锡帝安福科技有限公司 Fence is the nonmetal clamping circle of elasticity for assembling
JP2017501323A (en) * 2013-12-30 2017-01-12 无錫帝安福科技有限公司Wuxi Dif Technology Co., Ltd Assembled fence
CN104032694A (en) * 2014-05-23 2014-09-10 江苏爱可青实业有限公司 Connecting structure for road guardrail
CN104762900A (en) * 2015-04-13 2015-07-08 张家港固耐特围栏系统有限公司 Railing fixing block for metal fence
CN105839567A (en) * 2016-03-18 2016-08-10 夏士桀 Metal guardrail convenient to dismount and mount
CN108278038A (en) * 2017-12-19 2018-07-13 合肥草木蕃景生态科技有限公司 A kind of garden landscape plant guardrail and its installation method
CN108266043A (en) * 2018-01-12 2018-07-10 江阴市联众安全设施有限公司 A kind of guardrail of fast demountable
CN108867473A (en) * 2018-06-06 2018-11-23 滁州博昊门业制造有限公司 A kind of dismountable novel guardrail

Similar Documents

Publication Publication Date Title
CN201502216U (en) Assembled guard rail
PT1306502E (en) Fence
CN202850395U (en) Novel combined handrail
CN203654880U (en) Safety fence
CN201306043Y (en) Fence structure
CN205502426U (en) Wood system railing convenient to installation
CN211258040U (en) Guardrail is used in gardens convenient to fast assembly
JP2015010375A (en) Fence
CN204139725U (en) A kind of structure improved fence
CN209261345U (en) A kind of detachable isolation guardrail
CN202850394U (en) Novel combined guardrail
CN205875561U (en) Welding type rail guard
CN210195454U (en) Novel fender system is enclosed in assembled fast-assembling
CN201024727Y (en) Partition bar
CN205422160U (en) Stand and penetrating formula enclosure of penetrating formula enclosure
CN211007735U (en) Safety protection net for construction
CN210370163U (en) Fast assembly type building enclosure
CN215595199U (en) Aluminum alloy fence railing convenient to equipment
CN205476829U (en) Welding formula paper -cut for window decoration guardrail
CN204826873U (en) Novel construction of engineering height -adjustable is with enclosing baffle
CN218027392U (en) Adjustable protective guard for road isolation
CN201485860U (en) Steel structural house foundation framework
CN204199853U (en) A kind of column is with the guardrail of clamp module
CN219241139U (en) Be used for building engineering fast assembly formula railing
CN201671405U (en) Protective guardrail with fixing pieces

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100609

Termination date: 20130811