CN201494867U - Loading machine pneumatically elevated - Google Patents

Loading machine pneumatically elevated Download PDF

Info

Publication number
CN201494867U
CN201494867U CN200920306224XU CN200920306224U CN201494867U CN 201494867 U CN201494867 U CN 201494867U CN 200920306224X U CN200920306224X U CN 200920306224XU CN 200920306224 U CN200920306224 U CN 200920306224U CN 201494867 U CN201494867 U CN 201494867U
Authority
CN
China
Prior art keywords
support frame
wheel carrier
pneumatic
loader according
pneumatic elevation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN200920306224XU
Other languages
Chinese (zh)
Inventor
朱新文
李书福
杨健
潘巨林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Geely Holding Group Co Ltd
Zhejiang Haoqing Automobile Manufacturing Co Ltd
Original Assignee
Zhejiang Geely Holding Group Co Ltd
Zhejiang Haoqing Automobile Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Geely Holding Group Co Ltd, Zhejiang Haoqing Automobile Manufacturing Co Ltd filed Critical Zhejiang Geely Holding Group Co Ltd
Priority to CN200920306224XU priority Critical patent/CN201494867U/en
Application granted granted Critical
Publication of CN201494867U publication Critical patent/CN201494867U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a loading device, particularly to a loading device pneumatically elevated. The loading device comprises a support framework. A wheel frame is arranged on the lower part of the support framework, a plurality of pulleys are arranged on the wheel frame, and an elevating bracket and a pneumatic jack are arranged below the wheel frame. The utility model effectively solves the scratching problem of plate materials, facilitates material loading, largely reduces the labour intensity of operators, and improves production efficiency.

Description

The Pneumatic elevation loader
Technical field
The utility model relates to a kind of loader, especially relates to a kind of Pneumatic elevation loader.
Background technology
During the slab material loading, normally on support frame, put two rectangular angle steel in the past, and slab was placed on the angle steel, and shifts the support frame position onto along angle steel, and then slab one end was lifted, angle steel is detached, slab promptly places on the support frame.When adopting this support frame and angle steel material loading, cause the scuffing of slab easily, and labour intensity is big concerning the operator, causes production efficiency low.
Summary of the invention
The utility model mainly is technical matterss such as slab easily scratches when solving existing in prior technology slab material loading, labour intensity is big, production efficiency is low, a kind of Pneumatic elevation loader is provided, solved slab the scuffing problem, make things convenient for material loading, greatly reduce operator's labour intensity, improved production efficiency.
Above-mentioned technical matters of the present utility model is mainly solved by following technical proposals: the utility model comprises support frame, described support frame has wheel carrier, described wheel carrier is provided with some pulleys, and described wheel carrier below is connected with lifting support and pneumatic jack.By controlling the rising of pneumatic jack, with wheel carrier jack-up, make slab when material loading, can rely on the pulley on the wheel carrier, shift default position onto, after putting in place, the decline of control jack, this moment, wheel carrier descended, and made slab be shelved on the support frame.
As preferably, described support frame end face is provided with some hollow panes.
As preferably, described pulley is matrix form and is arranged on the wheel carrier, and corresponding to the hollow position of the hollow pane on the described support frame, described pulley is contour arrangement on wheel carrier to described pulley in the position on the wheel carrier.When wheel carrier rose, pulley stretched out support frame by hollow position, and the material of hollow position has also saved simultaneously.
Processing is not damaged in order to prevent support frame during slab on support frame, and as preferably, described support frame upper surface is provided with some contour lobes.
As preferably, described support frame edge is provided with limiting stopper.Limiting stopper can prop up slab.
As preferably, described lifting support comprises two parallel crotch, and each crotch comprises two struts that the middle part links to each other with little axle, and described two strut bottoms are provided with the steamboat of slip, a strut top links to each other with pneumatic jack, and another strut top is connected the wheel carrier bottom surface.
As preferably, a strut top in described each crotch extend horizontally away a force block, and described pneumatic jacking header withstands on the force block.
As preferably, described pneumatic jack is by being arranged on the pneumatic switch control of support frame upper side.
The beneficial effect that the utility model brings is, by controlling the lifting of pneumatic jack, drive rising, the decline of wheel carrier, thereby the work of control pulley, realize the material loading of slab, make the scuffing problem of slab be able to effective solution, make things convenient for material loading, reduced operator's labour intensity, improved production efficiency.
Description of drawings
Accompanying drawing 1 is a kind of structural representation of the present utility model;
Accompanying drawing 2 is the structural representations of looking up of Fig. 1;
Accompanying drawing 3 is a kind of structural representations of support frame of the present utility model;
Accompanying drawing 4 is right TV structure scheme drawings of Fig. 3;
Accompanying drawing 5 is a kind of structural representations of wheel carrier of the present utility model and pulley;
Accompanying drawing 6 is right TV structure scheme drawings of Fig. 5;
Accompanying drawing 7 is a kind of connection structure scheme drawings of lifting support of the present utility model, pneumatic jack and pneumatic switch.
The specific embodiment
Below by embodiment, and in conjunction with the accompanying drawings, the technical solution of the utility model is described in further detail.
Embodiment: the Pneumatic elevation loader of present embodiment is by Fig. 1,2,3,4,5,6, shown in 7, comprise support frame 1, support frame 1 is built by steel bar, form five hollow panes 10 at support frame 1 end face, support frame 1 edge is connected with limiting stopper, be connected with the contour lobe 8 that a plurality of matrix forms are arranged on the hollow pane 10, support frame is connected with wheel carrier 21 time, wheel carrier 2 links to each other with lifting support 5 under the wheel carrier 2, be connected with pneumatic jack 6 in the support frame 1, wheel carrier 2 upper surfaces are connected with a plurality of pulleys 7, pulley 7 is matrix form and arranges, pulley 7 is contour arrangement on wheel carrier 2, pulley 7 in the position on the wheel carrier 2 corresponding to the hollow position of the hollow pane 10 on the support frame 1, lifting support 5 is made of two parallel crotch 3, crotch 3 is made up of with little axle 11 series connected two struts 4 middle part, there is steamboat 9 strut 4 bottoms, steamboat 9 slides on support frame 1, strut 4 tops are connected wheel carrier 2 bottom surfaces, strut 4 tops of each crotch 3 extend horizontally away a strip force block 13, pneumatic jack 6 withstands on the force block 13, pneumatic switch 12 controls of pneumatic jack 6 by being connected in support frame 1 side.
Slab slides on the pulley on the wheel carrier 27 earlier, and after placing, control pneumatic switch 12 is fallen wheel carrier 2, slab is shelved on the lobe 8, produces then, behind to be produced the finishing, the operation air valve, rise wheel carrier 2, make it the jack-up slab, at last slab is relied on pulley 7 and release.

Claims (9)

1. a Pneumatic elevation loader comprises support frame (1), it is characterized in that, described support frame (1) has wheel carrier (2), and described wheel carrier (2) is provided with some pulleys (7), and described wheel carrier (2) below is connected with lifting support (5) and pneumatic jack (6).
2. Pneumatic elevation loader according to claim 1 is characterized in that, described support frame (1) end face is provided with some hollow panes (10).
3. Pneumatic elevation loader according to claim 1, it is characterized in that, described pulley (7) is matrix form and is arranged on the wheel carrier (2), corresponding to the hollow position of the hollow pane (10) on the described support frame (1), described pulley (7) is contour arrangement on wheel carrier (2) to described pulley (7) in the position on the wheel carrier (2).
4. Pneumatic elevation loader according to claim 1 and 2 is characterized in that, described support frame (1) upper surface is provided with some contour lobes (8).
5. Pneumatic elevation loader according to claim 1 and 2 is characterized in that, described support frame (1) edge is provided with limiting stopper.
6. Pneumatic elevation loader according to claim 4 is characterized in that, described support frame (1) edge is provided with limiting stopper.
7. Pneumatic elevation loader according to claim 1, it is characterized in that, described lifting support (5) comprises two parallel crotch (3), each crotch (3) comprises two struts (4) that the middle part links to each other with little axle (11), described two struts (4) bottom is provided with the steamboat (9) of slip, a strut (4) top links to each other with pneumatic jack (6), and another strut (4) top is connected wheel carrier (2) bottom surface.
8. Pneumatic elevation loader according to claim 7 is characterized in that, a strut (4) top in described each crotch (3) extend horizontally away a force block (13), and described pneumatic jack (6) withstands on the force block (13).
9. according to claim 1 or 7 or 8 described Pneumatic elevation loaders, it is characterized in that described pneumatic jack (6) is by being arranged on pneumatic switch (12) control of support frame (1) upper side.
CN200920306224XU 2009-07-15 2009-07-15 Loading machine pneumatically elevated Expired - Fee Related CN201494867U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200920306224XU CN201494867U (en) 2009-07-15 2009-07-15 Loading machine pneumatically elevated

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200920306224XU CN201494867U (en) 2009-07-15 2009-07-15 Loading machine pneumatically elevated

Publications (1)

Publication Number Publication Date
CN201494867U true CN201494867U (en) 2010-06-02

Family

ID=42438075

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200920306224XU Expired - Fee Related CN201494867U (en) 2009-07-15 2009-07-15 Loading machine pneumatically elevated

Country Status (1)

Country Link
CN (1) CN201494867U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102642702A (en) * 2012-04-27 2012-08-22 珠海格力电器股份有限公司 Air conditioner outer unit transport system
CN103132859A (en) * 2013-03-04 2013-06-05 上海志易工程设备有限公司 Automatic strip-inserting process of heat-insulting bridge cut-off aluminum window and door profiles

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102642702A (en) * 2012-04-27 2012-08-22 珠海格力电器股份有限公司 Air conditioner outer unit transport system
CN103132859A (en) * 2013-03-04 2013-06-05 上海志易工程设备有限公司 Automatic strip-inserting process of heat-insulting bridge cut-off aluminum window and door profiles

Similar Documents

Publication Publication Date Title
CN105499421B (en) Unilateral automatic loading and unloading device
CN101397089A (en) Ceramic tile palletizing apparatus
CN102407558A (en) Mould dismounting device for bamboo square material mould
CN201494867U (en) Loading machine pneumatically elevated
CN102633152B (en) Sheet material unloading device
CN101712850A (en) Automatic adhesive tape and accessory device of vehicle front wind shield
CN207030449U (en) A kind of stacked box brick device applied on ceramic tile packaging line
CN102744599A (en) Pipe pushing mechanism of automatic pipe perforating machine
CN201713269U (en) Special forklift
CN205312584U (en) Door and window glass side frame assembles automatic transportation line
CN202304383U (en) Hydraulic automatic tray lifting device
CN205222105U (en) Automatic setting machine
CN204549427U (en) A kind of mobile phone display screen pneumatic machine mobile device
CN208843303U (en) A kind of lifting alignment means
CN208528760U (en) The natural gas line rust remover of self-emptying
CN207465576U (en) Automatic sticky stick assembly line
CN203668238U (en) Plate glass turning device for glass toughening unit
CN201979363U (en) Novel stone edge polisher
CN205703963U (en) A kind of plane viscose glue article remove mechanism
CN205588037U (en) Transport unloader of disk type work
CN206200408U (en) A kind of running wheel pusher
CN205739456U (en) A kind of absorbing and hoisting machine
CN205441915U (en) Waste cleaning device
CN205021726U (en) Plywood hot press
CN202492459U (en) Multifunctional sheet glass turning machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100602