CN201494828U - Composite energy-saving asphalt tank - Google Patents

Composite energy-saving asphalt tank Download PDF

Info

Publication number
CN201494828U
CN201494828U CN2009200160607U CN200920016060U CN201494828U CN 201494828 U CN201494828 U CN 201494828U CN 2009200160607 U CN2009200160607 U CN 2009200160607U CN 200920016060 U CN200920016060 U CN 200920016060U CN 201494828 U CN201494828 U CN 201494828U
Authority
CN
China
Prior art keywords
tank
asphalt
storage tank
pitch
saving
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009200160607U
Other languages
Chinese (zh)
Inventor
李思
刘宝岩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Chulong Asphalt Equipment Co Ltd
Original Assignee
Shenyang Chulong Asphalt Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Chulong Asphalt Equipment Co Ltd filed Critical Shenyang Chulong Asphalt Equipment Co Ltd
Priority to CN2009200160607U priority Critical patent/CN201494828U/en
Application granted granted Critical
Publication of CN201494828U publication Critical patent/CN201494828U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Road Paving Machines (AREA)

Abstract

A composite energy-saving asphalt tank mainly resolves the technical difficulty that a traditional asphalt storage tank requires that whole tanked asphalts need to be heated when discharging asphalts, which wastes energy and affects project quality. The composite energy-saving asphalt tank comprises a storage tank, a guard rail is mounted on the outer wall of the storage tank, and a liquid level gauge is arranged inside the storage tank. A high temperature tank is arranged inside the storage tank, an inner heater is arranged at the bottom of the high temperature tank, and a storage tank heater is arranged at the bottom of the storage tank. The tank top of the high temperature tank is provided with an air vent, a breathing tube is mounted on the air vent, a floating oil pumping tube is arranged inside the high temperature tank, and the lower end of the floating oil pumping tube is communicated with an asphalt oil discharging tube. The periphery along the lower portion of the storage tank is provided with a small-quantity-asphalt sending tank, and a heater is mounted inside the small-quantity-asphalt sending tank. The composite energy-saving asphalt tank has the advantages of scientific and reasonable structure and high operation efficiency, is capable of saving energy by 20% to 30%, and is capable of saving energy about 50% during the period of highway testing section and other periods with low asphalt consumption, thereby realizing asphalt being heated on demand.

Description

The combined type energy-saving asphalt tank
Technical field
The utility model relates to a kind of energy-saving asphalt jar, particularly a kind of combined type energy-saving asphalt tank, technical field such as be mainly used in oil, chemical industry and build the road.
Background technology
Its heating arrangement of traditional asphalt storage is normally arranged heating coil and in the bottom oil pick-up tube is set in the bottom of asphalt storage.During use, need pitch all to be heated to the outside pitch of carrying of ability about 130C ° with whole jar.The only suitable a large amount of and continuous transmission pitch of the asphalt storage of this structure, but also should under the situation of once heating, complete jar of pitch transmission be finished.For example: the volume of asphalt tank is 5000 tons, and the pitch amount that needs to send is 500 tons, and so traditional asphalt tank must all be heated to 5000 tons of pitches serviceability temperature, can cause great energy dissipation like this.Because pitch heats repeatedly, cause the physicochemical property of pitch to be a greater impact, thereby influence the quality of asphalt coating, and operating efficiency is very low simultaneously.With 5000 tons of asphalt tanks is example, and it needs heating just can export pitch more than 5 days usually.
Summary of the invention
The purpose of this utility model is at above-mentioned the deficiencies in the prior art, and a kind of asphalt storage of novel combined structure is provided.This asphalt storage can heat pitch targetedly according to actual amount, needs how much pitch just to heat how much pitch, can save a large amount of energy.
For achieving the above object, the utility model adopts following technical proposals: the combined type energy-saving asphalt tank, comprise storage tank (6), and guardrail (7) is installed on the outer wall of storage tank (6), also be provided with liquidometer (9) in it.
Be provided with high-temperature tank (5) in the described storage tank (6), the bottom of high-temperature tank (5) is provided with internal heater (3), and the bottom of storage tank (6) is provided with storage tank heat device (10).
The tank deck of above-mentioned high-temperature tank (5) is shaped on air extractor vent, and breathing pipe (8) is installed on the air extractor vent, is provided with unsteady oil pick-up tube (4) in the high-temperature tank (5), and the lower end of the oil pick-up tube (4) of floating communicates with pitch oil outlet pipe (12); Above-mentioned storage tank (6) also is provided with a small amount of pitch transmission jar (11) along the periphery of bottom, and a small amount of pitch sends in jar (11) temperature booster (13) is housed.
The utility model has mainly solved the technical barrier that whole jar of pitch heating need be wasted energy and influence construction quality when the traditional asphalt storage tank goes out pitch.Realized how much pitch heating how much pitch with.Have scientific and reasonable for structure, the characteristics that operating efficiency is high.The 20%-30% energy can be saved,, the energy about 50% can be saved carrying out road test section and other asphalt content few period.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
The specific embodiment
Embodiment 1
With reference to Fig. 1, the combined type energy-saving asphalt tank comprises storage tank 6, and guardrail 7 is installed on the outer wall of storage tank 6, also is provided with liquidometer 9 in it.Be provided with high-temperature tank 5 in the described storage tank 6, the bottom of high-temperature tank 5 is provided with internal heater 3, and the bottom of storage tank 6 is provided with storage tank heat device 10.The tank deck of above-mentioned high-temperature tank 5 is shaped on air extractor vent, and breathing pipe 8 is installed on the air extractor vent, is provided with the oil pick-up tube 4 of floating in the high-temperature tank 5, and the lower end of the oil pick-up tube 4 of floating communicates with pitch oil outlet pipe 12; Above-mentioned storage tank 6 also is provided with a small amount of pitch transmission jar 11 along the periphery of bottom, and a small amount of pitch sends in the jar 11 temperature booster 13 is housed.
The utility model can be exported pitch as required:
1, exports pitch on a large scale
The mode of utilizing partial-block formula heating (jar in the combined type jar) to combine with the oil pick-up tube of floating solves the problem of extensive transmission pitch.If when needing large output pitch, the pitch of high temperature heating zone 2 in the high-temperature tank can be heated to the hair oil temperature, and the pitch in the low-temperature prewarming district 1 in the storage tank outside the high-temperature tank is heated to about 100C °, because the heating efficiency in the high-temperature tank is very strong, and the oil pick-up tube of floating can guarantee to export all the time the pitch of highest temperature in the asphalt tank, so during large output pitch, combine with the oil pick-up tube of floating by built-in high-temperature tank, can satisfy extensive output pitch, asphalt storage can save 1/3rd than the traditional asphalt jar preheating time simultaneously.
2, batch (-type) output pitch
During asphalt tank batch (-type) output pitch, built-in high-temperature tank can play the effect of insulation.Because built-in high-temperature tank leak tightness is fine, and the heat conductivity of pitch very poor (pitch mainly conducts heat by the mode of convection current), therefore built-in high-temperature tank can play good insulation effect, add the insulation of 5000 tons of jars itself, the combination of the two makes in intermittent delivery pitch process, asphalt temperature in jar still is in a relative high-temperature zone, be that the interior pitch of high-temperature tank still is the higher pitch of relative temperature, when carrying pitch for the second time, in the short period of time, the pitch of high-temperature tank will be heated to the temperature of hair oil.And traditional asphalt tank is after carrying pitch for the first time, and the pitch in whole big jar can be along with the increase of time, and the temperature of whole jar of pitch can evenly descend, and when carrying pitch for the second time, still needs whole jar of pitch is heated to the hair oil temperature.
3, export pitch on a small quantity
During at a small amount of output pitch, can utilize a small amount of pitch to send jar.Can avoid that like this this jar is only heated in whole asphalt tank heating gets final product.Not only can save a large amount of energy, and the efficient height of output pitch, required time of heat is short.

Claims (1)

1. combined type energy-saving asphalt tank, comprise storage tank (6), guardrail (7) is installed on the outer wall of storage tank (6), also be provided with liquidometer (9) in it, it is characterized in that: be provided with high-temperature tank (5) in the described storage tank (6), the bottom of high-temperature tank (5) is provided with internal heater (3), the bottom of storage tank (6) is provided with storage tank heat device (10), the tank deck of above-mentioned high-temperature tank (5) is shaped on air extractor vent, breathing pipe (8) is installed on the air extractor vent, be provided with unsteady oil pick-up tube (4) in the high-temperature tank (5), the lower end of the oil pick-up tube (4) of floating communicates with pitch oil outlet pipe (12); Above-mentioned storage tank (6) also is provided with a small amount of pitch transmission jar (11) along the periphery of bottom, and a small amount of pitch sends in jar (11) temperature booster (13) is housed.
CN2009200160607U 2009-07-31 2009-07-31 Composite energy-saving asphalt tank Expired - Fee Related CN201494828U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009200160607U CN201494828U (en) 2009-07-31 2009-07-31 Composite energy-saving asphalt tank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009200160607U CN201494828U (en) 2009-07-31 2009-07-31 Composite energy-saving asphalt tank

Publications (1)

Publication Number Publication Date
CN201494828U true CN201494828U (en) 2010-06-02

Family

ID=42438036

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009200160607U Expired - Fee Related CN201494828U (en) 2009-07-31 2009-07-31 Composite energy-saving asphalt tank

Country Status (1)

Country Link
CN (1) CN201494828U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102417079A (en) * 2011-11-22 2012-04-18 沈阳储隆沥青设备有限公司 Quick oil extractor for asphalt storage tank
CN102745436A (en) * 2012-07-04 2012-10-24 天津兆华物流有限公司 Quick blank pipe type layering discharge device and quickly discharging method thereof
CN106245491A (en) * 2016-08-29 2016-12-21 山东中宏路桥建设有限公司 Asphalt heater and utilize the Colophonium heating means of this device
CN106395726A (en) * 2016-12-14 2017-02-15 郝光源 Intelligent ring belt type pitch local high temperature fast oil extracting device
CN109098067A (en) * 2018-08-02 2018-12-28 三汽车制造有限公司 A kind of asphalt tank
CN106275912B (en) * 2016-08-29 2019-07-12 湖北国创高新材料股份有限公司 A kind of asphalt storage continuously takes oil heating unit

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102417079A (en) * 2011-11-22 2012-04-18 沈阳储隆沥青设备有限公司 Quick oil extractor for asphalt storage tank
CN102745436A (en) * 2012-07-04 2012-10-24 天津兆华物流有限公司 Quick blank pipe type layering discharge device and quickly discharging method thereof
CN102745436B (en) * 2012-07-04 2015-04-15 天津兆华物流有限公司 Quick blank pipe type layering discharge device and quickly discharging method thereof
CN106245491A (en) * 2016-08-29 2016-12-21 山东中宏路桥建设有限公司 Asphalt heater and utilize the Colophonium heating means of this device
CN106275912B (en) * 2016-08-29 2019-07-12 湖北国创高新材料股份有限公司 A kind of asphalt storage continuously takes oil heating unit
CN106395726A (en) * 2016-12-14 2017-02-15 郝光源 Intelligent ring belt type pitch local high temperature fast oil extracting device
CN109098067A (en) * 2018-08-02 2018-12-28 三汽车制造有限公司 A kind of asphalt tank

Similar Documents

Publication Publication Date Title
CN201494828U (en) Composite energy-saving asphalt tank
CN201921534U (en) Low-temperature evaporation concentration device
CN202169099U (en) Plate type and packing combined reactive distillation device with continuous external circulation
CN201539958U (en) Crude oil electric heating device
CN207610363U (en) A kind of retracting device of waste heat from tail gas
CN202853170U (en) Heat collector water storage tank
CN203753695U (en) Multifunctional vertical pitch storage tank
CN203274259U (en) Energy-saving device of reaction boiler
CN202581772U (en) High-temperature and high-voltage electric water heater
CN201930774U (en) Grease high-pressure hydrolysis self-circulation device
CN201495321U (en) Heating device of screw extruder
CN103990290A (en) Multi-energy energy-saving distillation kettle
CN204625546U (en) A kind of biomass Organic carbon preparation facilities
CN201292350Y (en) Novel biodiesel production apparatus
CN211814484U (en) Catalytic oxidation acid making device
CN202379943U (en) Tar dehydration apparatus
CN102963634A (en) Heating and preservation device for asphalt
CN204830425U (en) Electric -heating device
CN220299306U (en) Heat preservation emission reduction type asphalt tank
CN204051019U (en) Steam secondary cooling-down type liquid ammonia evaporator
CN202267383U (en) Water immersion type condenser
CN201925712U (en) Liquid ammonia storage tank with heating and thermal insulation type external semi-coil
CN203190393U (en) Heating boiler
CN201203247Y (en) Novel electric water heater
CN201921535U (en) Energy-saving purifying distiller

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Li Li

Inventor after: Liu Baoyan

Inventor before: Li Si

Inventor before: Liu Baoyan

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: LI SI LIU BAOYAN TO: LI LI LIU BAOYAN

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100602

Termination date: 20170731

CF01 Termination of patent right due to non-payment of annual fee