CN201485815U - Flood drainage device of ladder type mine waste reservoir - Google Patents
Flood drainage device of ladder type mine waste reservoir Download PDFInfo
- Publication number
- CN201485815U CN201485815U CN2009201890062U CN200920189006U CN201485815U CN 201485815 U CN201485815 U CN 201485815U CN 2009201890062 U CN2009201890062 U CN 2009201890062U CN 200920189006 U CN200920189006 U CN 200920189006U CN 201485815 U CN201485815 U CN 201485815U
- Authority
- CN
- China
- Prior art keywords
- floodwaters
- mine waste
- flood
- mine tailing
- storehouse
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A10/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
- Y02A10/11—Hard structures, e.g. dams, dykes or breakwaters
Landscapes
- Sewage (AREA)
Abstract
The utility model discloses a flood drainage device of a ladder type mine waste reservoir. The ladder type mine waste reservoir comprises three or more independent mine waste reservoirs which are sequentially distributed from high to low. The flood drainage device comprises the ladder type mine waste reservoir, a flood detention dam, a main flood drainage facility and branch flood drainage systems. The inlet of the main flood drainage facility is positioned near the flood detention dam and rounds the ladder type mine waste reservoir from one side to extend to the downstream. An upstream mine waste reservoir, a midstream mine waste reservoir and a downstream mine waste reservoir respectively adopt the branch flood drainage systems to discharge flood, and the branch flood drainage systems are respectively connected with the main flood drainage facility. The utility model has the advantages of greatly relieving the flood drainage pressure in the mine waste reservoirs, being beneficial to the safety and stability of the mine waste reservoirs, realizing the purpose of cleaning sewage and distributing flow, being beneficial to the environment protection, reducing the risk that the branch flood drainage systems are damaged by the great load pressure of the covered tailings and remarkably improving the safety and the reliability of the whole ladder type mine waste reservoir and the flood drainage system thereof.
Description
Technical field
The utility model belongs to the mine safety technical field, relates to a kind of staged mine tailing storehouse device that drains off floodwaters.
Background technology
The mine tailing storehouse is the association of the various structure of the mine tailing that produces behind the safe storage mine ore dressing.The security and stability in mine tailing storehouse depends primarily on two aspects: the firstth, and the security and stability of tailing dam; The secondth, the security and stability of the system of drainning off floodwaters.According to statistics, China's nonferrous metal mine causes 50% of the whole mine tailing storehouse accident that almost accounts for of disaster because of the system's accident of drainning off floodwaters.Therefore scientific and reliable is set drains off floodwaters that to get rid of the flood in mine tailing storehouse swimmingly most important for the security and stability in mine tailing storehouse for system, safety.
The main flow pattern in China mine tailing storehouse is mountain valley-type mine tailing storehouse, and if mine tailing storehouse can not satisfy the production length of service and require the time, general and tailing storehouse, the follow-up storehouse of taking over is not in lining, a mountain valley (or coombe).But factors such as the landform of being subjected to, geological conditions, production management, cost of production restrict, make several mine tailing storehouses in a mine understand stepped being distributed in same mountain valley or the coombe, such mine tailing storehouse is called " staged mine tailing storehouse ", the cascade development power station of some similar water electric system.The characteristics in staged mine tailing storehouse are to be distributed successively from high to low along landform by the independent mine tailing storehouse more than 3 and 3 to form, and advantage is to maximally utilise the natural storage capacity that mountain valley (or coombe) forms; Centralized arrangement is convenient to production management simultaneously.
Pipe laying under the dam that the many employings of the pattern of drainning off floodwaters in staged mine tailing storehouse are at present got in touch continuously, all there is the pipe that drains off floodwaters separately in every storehouse, the flood in storehouse, upstream flows into the storehouse, middle reaches by the pipe that drains off floodwaters, compile the drain off floodwaters pipe of back by the storehouse, middle reaches with the flood in storehouse, middle reaches and enter the storehouse, downstream, the flood in final upstream, middle reaches, three storehouses, downstream gathers the back and all is discharged into mountain valley, downstream (or coombe) by the pipe that drains off floodwaters in storehouse, downstream.
There is following drawback in this mode of drainning off floodwaters:
1, drain off floodwaters the load repeat the stack.The flood that its storehouse, upstream is discharged has all been born in storehouse, every downstream, past more downstream, and the pressure that drains off floodwaters is layering greatly more, has repeated to increase the load that drains off floodwaters in every mine tailing storehouse, makes the system engineering of drainning off floodwaters of staged mine tailing storehouse drop into strengthen.
2, drain off floodwaters and have a big risk.At present the system of drainning off floodwaters in staged mine tailing storehouse is contact continuously, if fault has appearred in the pipe that drains off floodwaters in wherein any storehouse, the safety that all can influence self storehouse, place and other storehouses is drained off floodwaters, and then staged mine tailing storehouse all can be absorbed in breakneck situation.
3, the big section pipe safety reliability that drains off floodwaters is lower.Loading because drain off floodwaters is layering, and makes past more downstream, and the flow that drains off floodwaters is big more, and the cross dimension of respective row water pipe is big more.Owing to covering reasons such as the mine tailing load is big, construction quality is not good enough on the pipe that drains off floodwaters, causing the big section pipe damage accident generation frequency of drainning off floodwaters is that the nonferrous metal mine mine tailing storehouse accident rate of drainning off floodwaters in the structure is the highest, and up to more than 60%, safety reliability is lower.
Summary of the invention
The purpose of this utility model is to provide a kind of staged mine tailing storehouse device that drains off floodwaters, and this device can overcome the defective of existing apparatus, and safety is drained the flood in staged mine tailing storehouse, thereby ensures the safety in mine tailing storehouse.
The technical solution of the utility model is: device drains off floodwaters in a kind of staged mine tailing storehouse, this staged mine tailing storehouse comprises the independent mine tailing storehouse more than 3 or 3, more than independent mine tailing storehouse distribute successively from high to low, this device comprises staged mine tailing storehouse, regulating dam, master drain off floodwaters facility, the system of drainning off floodwaters.The main facility inlet that drains off floodwaters is located at the regulating dam side and walks around staged mine tailing storehouse from a side, extends to the downstream.Trips three storehouses in upper, middle and lower are drained separately in the storehouse flood and are all adopted the system of drainning off floodwaters, the system of drainning off floodwaters respectively with lead the facility that drains off floodwaters and join.Described regulating dam is to be arranged in upstream, staged mine tailing storehouse.
The utility model has following advantage: 1, regulating dam and the main facility that drains off floodwaters play " cutting flood " effect jointly, the flood (generally accounting for more than the 60%-70% of the total catchment area in staged mine tailing storehouse) of the above catchment area of regulating dam was drained with regard to interception before entering the mine tailing storehouse, extenuate the pressure that drains off floodwaters in the mine tailing storehouse greatly, helped the safety and stability in mine tailing storehouse.2, this part flood of directly being drained by regulating dam and the main facility interception of drainning off floodwaters does not enter the mine tailing storehouse thereby not by tailings pollution, the shunting that realized removing contamination helps environmental protection.3, after the interception shunting, the flood discharge that enters in the mine tailing storehouse significantly reduces, thereby three mine tailing storehouses are drained the system's cross dimension of drainning off floodwaters of flood in the storehouse separately and can correspondingly be significantly reduced, reduced the system of drainning off floodwaters by on cover mine tailing load weight and the risk of damaging, improved the safety reliability in the system of drainning off floodwaters and mine tailing storehouse.4, flood in the storehouse is independently drained separately in three mine tailing storehouses, and the stack that repeats of the load of having avoided drainning off floodwaters makes storehouse, every downstream no longer bear the load that drains off floodwaters in its storehouse, upstream, has overcome to have " tandem " drain off floodwaters deficiency of device now; Simultaneously the system of drainning off floodwaters in every storehouse all is relatively independent, and its risk of drainning off floodwaters is no longer changeed and added to adjacent mine tailing storehouse, thereby has greatly improved the drain off floodwaters safety reliability of system of whole staged mine tailing storehouse.
Description of drawings
Fig. 1 vertically arranges schematic diagram for staged mine tailing storehouse;
Fig. 2 is a kind of staged mine tailing of the utility model storehouse device floor map of drainning off floodwaters.
The specific embodiment
Device drains off floodwaters in a kind of staged mine tailing storehouse, this staged mine tailing storehouse 1 comprises the independent mine tailing storehouse more than 3 or 3, more than independent mine tailing storehouse distribute successively from high to low, this device comprises staged mine tailing storehouse 1, regulating dam 2, master drain off floodwaters facility 3, the system 4 of drainning off floodwaters.Regulating dam 2 is to be arranged in 1 upstream, staged mine tailing storehouse.Main facility 3 inlets that drain off floodwaters are located at regulating dam 2 sides and walk around staged mine tailing storehouse 1 from a side, extend to the downstream.Trips three storehouses in upper, middle and lower are drained separately in the storehouse flood and are all adopted the system 4 of drainning off floodwaters, the system 4 of drainning off floodwaters respectively with lead the facility 3 that drains off floodwaters and join.
Claims (2)
1. device drains off floodwaters in a staged mine tailing storehouse, this staged mine tailing storehouse (1) comprises the independent mine tailing storehouse more than 3 or 3, more than independent mine tailing storehouse distribute successively from high to low, it is characterized in that: this device comprises staged mine tailing storehouse (1), regulating dam (2), master drain off floodwaters facility (3), the system (4) of drainning off floodwaters; Main facility (3) inlet that drains off floodwaters is located at regulating dam (2) side and walks around staged mine tailing storehouse (1) from a side, extends to the downstream; Trips three storehouses in upper, middle and lower are drained separately in the storehouse flood and are all adopted the system (4) of drainning off floodwaters, the system (4) of drainning off floodwaters respectively with lead the facility (3) that drains off floodwaters and join.
2. according to the described staged mine tailing of the claim 1 storehouse device that drains off floodwaters, it is characterized in that: described regulating dam (2) is to be arranged in upstream, staged mine tailing storehouse (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009201890062U CN201485815U (en) | 2009-09-09 | 2009-09-09 | Flood drainage device of ladder type mine waste reservoir |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009201890062U CN201485815U (en) | 2009-09-09 | 2009-09-09 | Flood drainage device of ladder type mine waste reservoir |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201485815U true CN201485815U (en) | 2010-05-26 |
Family
ID=42424701
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009201890062U Expired - Fee Related CN201485815U (en) | 2009-09-09 | 2009-09-09 | Flood drainage device of ladder type mine waste reservoir |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201485815U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103614986A (en) * | 2013-12-02 | 2014-03-05 | 化工部长沙设计研究院 | Free surface flow water inflow method suitable for draining off floodwaters of tailing pond |
CN105908823A (en) * | 2016-06-23 | 2016-08-31 | 陕西冶金设计研究院有限公司 | Flood drainage system for valley-type tailing pond |
CN105951968A (en) * | 2016-06-21 | 2016-09-21 | 中国恩菲工程技术有限公司 | Device and method for upstream flood interception and drainage of tailing pond |
-
2009
- 2009-09-09 CN CN2009201890062U patent/CN201485815U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103614986A (en) * | 2013-12-02 | 2014-03-05 | 化工部长沙设计研究院 | Free surface flow water inflow method suitable for draining off floodwaters of tailing pond |
CN105951968A (en) * | 2016-06-21 | 2016-09-21 | 中国恩菲工程技术有限公司 | Device and method for upstream flood interception and drainage of tailing pond |
CN105908823A (en) * | 2016-06-23 | 2016-08-31 | 陕西冶金设计研究院有限公司 | Flood drainage system for valley-type tailing pond |
CN105908823B (en) * | 2016-06-23 | 2018-10-02 | 陕西冶金设计研究院有限公司 | A kind of mountain valley-type Tailings Dam flood drainage system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101660301A (en) | Staircase mine waste reservoir drainage method | |
CN201485815U (en) | Flood drainage device of ladder type mine waste reservoir | |
CN108915028B (en) | Water power generation device for smart city landscape | |
CN203603171U (en) | Efficient vertical seepage drainage device for tailing pond | |
CN104532907B (en) | pump station structure | |
CN104120901B (en) | Hydropower plant of staggered layer type water turbine layer structure | |
CN209053123U (en) | A kind of underground pipe gallery transportation system | |
CN203050977U (en) | Rainwater centralized generating set on roof of high-rise building | |
CN106381830A (en) | Cascade reservoir combined sediment regulation method | |
CN203639240U (en) | Small town domestic sewage treatment system using composite biological constructed wetland | |
CN105908823B (en) | A kind of mountain valley-type Tailings Dam flood drainage system | |
CN205875344U (en) | Mountain valley type tailing storehouse flood draining facility | |
CN204573592U (en) | A kind of sledge dress crude oil exporting positive battery metering device | |
CN204728348U (en) | Mud-rock flow guard system | |
CN107642144B (en) | Drainage tunnel capable of simultaneously receiving sewage and rainwater | |
CN202124843U (en) | Flood discharge facility of slag blocking dam of tailing pond | |
CN201284652Y (en) | Tunnel structure shared by construction traffic and flood draining passage | |
CN203997613U (en) | The anti-storehouse drainage system of bursting | |
CN204919765U (en) | Transformer substation uses curb drainage system | |
CN204983092U (en) | A dirty current drive system of rain for steel mill | |
CN212271082U (en) | Building engineering rainwater collection and utilization device | |
CN202559491U (en) | Manufacturing shop cleaning system | |
CN106884472A (en) | A kind of pipeline circulating municipal sewage processing system | |
CN203999040U (en) | Sewage lifting device profit decker | |
CN203782787U (en) | Rainwater intercepting and collecting facility for roads in bridge zone of urban sunken overpass |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100526 Termination date: 20170909 |