CN201485202U - Wind power generation climbing hoisting crane - Google Patents

Wind power generation climbing hoisting crane Download PDF

Info

Publication number
CN201485202U
CN201485202U CN2009200154019U CN200920015401U CN201485202U CN 201485202 U CN201485202 U CN 201485202U CN 2009200154019 U CN2009200154019 U CN 2009200154019U CN 200920015401 U CN200920015401 U CN 200920015401U CN 201485202 U CN201485202 U CN 201485202U
Authority
CN
China
Prior art keywords
clamp
power generation
wind power
hoisting crane
jaw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009200154019U
Other languages
Chinese (zh)
Inventor
张世宇
闫鸣垒
代秀玲
朱东正
武玉科
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2009200154019U priority Critical patent/CN201485202U/en
Application granted granted Critical
Publication of CN201485202U publication Critical patent/CN201485202U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a wind power generation climbing hoisting crane, which belongs to hoisting machinery. The hoisting crane consists of a machine stem, an upper holding clamp, a lower holding clamp, a hydraulic boom and a pulley hook connected with a hinging rope, wherein the upper end and the lower end in a cavity of the machine stem are provided with chain wheels which are in engaged connection by using a ring chain. The clamp body of the lower holding clamp is fixed at the lower end of the machine stem, and the clamp body of the upper holding clamp is sleeved on the outer wall of the machine stem in movable fit and an inner seat of the clamp body is provided with a ratchet to engage the chain; and the upper holding clamp is provided with a jaw driven by a hydraulic tank, and the lower holding clamp is provided with a jaw driven by the hydraulic tank. The wind power generation climbing hoisting crane can be widely applied to large-sized wind generating sets such as the hoisting of the parts of a tower tube, an engine room, a wind wheel hub and the like, is applicable to hoisting operations of high altitude and super-altitude heavy equipment, is not limited by the maximum lifting height and fields, can perform hoisting operations on flat grounds, hillsides and sea surface, is electromechanically integrated with high automation degree, can be controlled on the ground, has light weight, is convenient for assembly and disassembly, transition and transportation, and has high operational efficiency.

Description

Wind power generation climbing hoisting crane
Technical field
The utility model relates to a kind of heavy-duty lifting machine, especially wind power generation climbing hoisting crane.
Background technology
Natural resourcess such as wind energy, solar power, tidal energy are natural regenerative resources, and are inexhaustible, nexhaustible.Along with the exhaustion day by day of fossil fuels such as coal, oil, natural fuels, development and use reproducible, eco-friendly power source have become the only way of whole world approval.Yet owing to wind power plant cost height, construction erected cost height, disposable having high input, formed cost electricity price is higher than conventional thermal electric generation and hydropower.Just comparatively complicated as existing hoisting process, and need utilize many heavy lifting facilities and corollary equipment to finish, be example so that the 1500KW aerogenerator to be installed:
WTG1500A wind power generating set lifting parameter is as follows:
(1) tower tube: 110 tons of gross weights (totally 4 joints are sewed tube, and are high 85 meters);
(2) cabin: 51 tons of gross weights;
(3) wind wheel: 32.9 tons of gross weights (containing three blades, a wheel hub).
Adopt the usual manner hanging device as follows:
(1) crawler crane: 1 on CC2800 type, 1000 tons of the biggest lifting capacities, 13 meters of maximum sling heights;
(2) rubber tired crane: 2 on QUY50 type, 1 on QUY100 type, 1 on QUY200 type;
(3) rolling cart: 2.
The unit lifting is divided into three workshop sections and carries out:
First workshop section: lifting first segment tower tube, use 1 QUY200 and the cooperation of 1 QUY50 rubber tired crane to finish;
Second workshop section: lift second and third joint tower tube, use 1 CC2800 crawler crane and the cooperation of 1 QUY50 rubber tired crane to finish;
The 3rd workshop section: lift the 4th joint tower tube, cabin, impeller (wheel hub and blade), use 1 CC2800 crawler crane and the cooperation of 1 QUY100 rubber tired crane to finish.A 50MW wind energy turbine set installation phase needs 18 months.How reducing equipment cost and cost of installation is to make the wind-power electricity generation industry move towards the place of the key in market.When this type of problem occurred, once the someone utilized bionic principle to design and manufacture fixedly tower crane lifting mechanism of double-deck jaw type, was the patent application of CN2306981 as publication number.But such design just improves at performance of hoisting crane own and structure, and the overall process of tower tube lifting is simplified, and still needs further improvement.
Summary of the invention
At existing tower tube hoisting process complicated operation, and problems such as big, the heavy dismounting delivery of the auxiliary use, the work capacity that need many heavy lifts and corollary equipment difficulty, the utility model provides a kind of wind power generation climbing hoisting crane, it can replace large-scale crawler belt lifting operation car, both saved time, saving of labor, province personnel, province's expense, low to environmental requirement, degree of automation height, energy-saving and environmental protection, safety, reliable, danger is little, the place operating environment is good; Be convenient to dismounting and transportation, be not subjected to the restriction of maximum sling height, operating efficiency is higher.
The technical scheme that its technical matters that solves the utility model adopts is: wind power generation climbing hoisting crane, be to constitute by the pulley suspension hook that machine is done, upper clamp, lower clamp, Hydraulic jip and hinge rope connect, upper/lower terminal has been installed sprocket wheel in the chamber that machine is done, and with the ring chain connection that is meshed.The caliper of lower clamp is fixed in machine does the lower end, and the caliper running-fit of upper clamp is set on the dried outer wall of machine and the interior seat of caliper has ratchet to be meshed with chain; Upper clamp has the jaw that is driven by hydraulic fluid tank, and lower clamp has the jaw that is driven by hydraulic fluid tank.Wind power generation climbing hoisting crane is to be support with the barrel mast that aerogenerator has installed, utilize and embrace the rising of pincers edge barrel mast, jaw by upper and lower armful of pincers is locked at the tapered drum outer surface of column, lifts next joint barrel mast or miscellaneous part by Hydraulic jip, finishes work such as lifting, lifting.Afterwards, be back to the special-purpose carrier loader in ground by embracing the pincers jaw.Maneuvering system of this equipment and propulsion source all are arranged on the special-purpose carrier loader, are connected with the hoisting crane that climbs by cable, connection terminal and winder, realize that power provides and controllable function.
As further improvement of the utility model, main each other, the follower of two chain wheel set up and down.
As further improvement of the utility model, the jaw closed form separately of upper clamp and lower clamp all is to clamp mutually tightly with barrel mast.
As further improvement of the utility model, upper clamp is provided with 1~3 jaw of upper and lower arrangement.
The beneficial effect that the utility model produces is: can be widely used in Large-scale Wind Turbines, as the lifting of parts such as tower tube, cabin, wind wheel wheel hub, and the operating mode similarly lifting of other equipment with it, be applicable to the lifting operation of high-altitude and superaltitude heavy wares; Not limited by maximum height of lift; Not limited by the place, can be on level land, hillside, sea lifting operation; But electromechanical, degree of automation height ground control, in light weight, easy accessibility, be convenient to the transition transportation; The operating efficiency height.
Description of drawings
Fig. 1 is a perspective view of the present utility model;
Fig. 2 moves to tower tube upper end scheme drawing for upper clamp of the present utility model;
Fig. 3 is the utility model crane operating status structural representation.
The specific embodiment
Wind power generation climbing hoisting crane is to be made of the pulley suspension hook 5 that machine does 1, upper clamp 2, lower clamp 3, Hydraulic jip 4 and hinge rope connect, and machine is done in 1 the chamber upper/lower terminal sprocket wheel 6,7 has been installed, and with ring chain 8 connection that is meshed; The caliper of lower clamp 3 is fixed in machine does 1 lower end, the caliper running-fit of upper clamp 2 machine that is set in do on 1 the outer wall and in the caliper seat have ratchet to be meshed with chain 8; Upper clamp 2 has the jaw 10 that is driven by hydraulic fluid tank 9, and lower clamp 3 has the jaw 12 that is driven by hydraulic fluid tank 11.
Sprocket wheel 6 and 7 is main each other, follower.
Jaw 10,12 closed form separately of upper clamp 2 and lower clamp 3 all is to clamp mutually tightly with barrel mast 13.
Upper clamp 2 is provided with 1~3 jaw 10 of upper and lower arrangement.
Adopt the wind power generation climbing hoisting crane hanging device as follows:
(1) wind power generation climbing hoisting crane: 1.
(2) rubber tired crane: 1 on QUY50 type.
(3) supporting special use is with going on foot car: 1.
The unit lifting is divided into three workshop sections and carries out:
First workshop section: lift first, second, third and fourth joint tower tube, uses 1 wind power generation climbing hoisting crane and 1 to finish with going on foot the car cooperation.
Second workshop section: lifting cabin, impeller, use 1 wind power generation climbing hoisting crane and the cooperation of 1 QUY50 rubber tired crane to finish.
A 50MW wind energy turbine set installation phase only needs 9 months.
The job order that wind power generation climbing hoisting crane plays tower crane tube uphill process is: the upper clamp jaw unclamps, and lifting mechanism rises, and rising stops when putting in place, the upper clamp jaw is held tightly, and the lower clamp jaw unclamps, and machine is done and risen, stop after rising puts in place, the lower clamp jaw is held tightly, carries out lifting operation.
The finish the work job order of decline process of wind power generation climbing hoisting crane is: the lower clamp jaw unclamps, and machine is done and descended, and descending stops when putting in place, and the lower clamp jaw is held tightly, and the upper clamp jaw unclamps, and upper clamp descends.So repeat several bouts until reducing to ground.

Claims (5)

1. wind power generation climbing hoisting crane, be to do pulley suspension hook (5) formation that (1), upper clamp (2), lower clamp (3), Hydraulic jip (4) and hinge rope connect by machine, it is characterized in that machine does in (1) chamber upper/lower terminal sprocket wheel (6), (7) have been installed, and with ring chain (8) connection that is meshed; The caliper of lower clamp (3) is fixed in the lower end that machine is done (1), and the caliper running-fit of upper clamp (2) machine that is set in is done on the outer wall of (1) and the interior seat of caliper has ratchet to be meshed with chain (8); Upper clamp (2) has the jaw (10) that is driven by hydraulic fluid tank (9), and lower clamp (3) has the jaw (12) that is driven by hydraulic fluid tank (11).
2. wind power generation climbing hoisting crane as claimed in claim 1 is characterized in that sprocket wheel (6) and (7) are main each other, follower.
3. wind power generation climbing hoisting crane as claimed in claim 1 or 2, jaw (10), (12) closed form separately that it is characterized in that upper clamp (2) and lower clamp (3) all are to clamp mutually tightly with barrel mast (13).
4. wind power generation climbing hoisting crane as claimed in claim 3 is characterized in that upper clamp (2) is provided with 1~3 jaw (10) of upper and lower arrangement.
5. wind power generation climbing hoisting crane as claimed in claim 1 or 2 is characterized in that upper clamp (2) is provided with 1~3 jaw (10) of upper and lower arrangement.
CN2009200154019U 2009-07-17 2009-07-17 Wind power generation climbing hoisting crane Expired - Fee Related CN201485202U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009200154019U CN201485202U (en) 2009-07-17 2009-07-17 Wind power generation climbing hoisting crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009200154019U CN201485202U (en) 2009-07-17 2009-07-17 Wind power generation climbing hoisting crane

Publications (1)

Publication Number Publication Date
CN201485202U true CN201485202U (en) 2010-05-26

Family

ID=42424092

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009200154019U Expired - Fee Related CN201485202U (en) 2009-07-17 2009-07-17 Wind power generation climbing hoisting crane

Country Status (1)

Country Link
CN (1) CN201485202U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102407004A (en) * 2011-10-21 2012-04-11 沈阳建筑大学 Multifunctional automatic climbing device
CN102515035A (en) * 2011-12-28 2012-06-27 中国重型机械研究院有限公司 Maintenance hoisting equipment for wind generation set
CN105836621A (en) * 2015-01-15 2016-08-10 三汽车起重机械有限公司 Climbing crane
CN108821133A (en) * 2018-09-04 2018-11-16 上海峙狄机械设备有限公司 Self-crawling type crane based on Wind turbines tower ontology
US10494235B2 (en) 2016-12-06 2019-12-03 General Electric Company Crane system and an associated method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102407004A (en) * 2011-10-21 2012-04-11 沈阳建筑大学 Multifunctional automatic climbing device
CN102515035A (en) * 2011-12-28 2012-06-27 中国重型机械研究院有限公司 Maintenance hoisting equipment for wind generation set
CN105836621A (en) * 2015-01-15 2016-08-10 三汽车起重机械有限公司 Climbing crane
US10494235B2 (en) 2016-12-06 2019-12-03 General Electric Company Crane system and an associated method thereof
CN108821133A (en) * 2018-09-04 2018-11-16 上海峙狄机械设备有限公司 Self-crawling type crane based on Wind turbines tower ontology

Similar Documents

Publication Publication Date Title
CN101590982A (en) Wind power generation climbing hoisting crane
CN201485202U (en) Wind power generation climbing hoisting crane
CN102407004A (en) Multifunctional automatic climbing device
CN105545612B (en) Large-scale Wind Turbines and its blade installation structure
CN203064069U (en) Dynamic climbing device of tower
CN105836594B (en) It is a kind of from climbing type large scale wind power machine general maintenance hanging apparatus and its application method
CN203128000U (en) Hoisting device for direct-driven wind power generator set
CN209676010U (en) A kind of gravity force energy storage system for relying on coal mine
CN103342296B (en) Adhering self-elevating-type tower crane for hoisting wind power equipment
CN108946509A (en) A kind of large-scale wind driven generator is from rising tower crane construction method
CN103601079A (en) Hoisting-type wind power maintenance lifting platform
CN103133218A (en) Double suspension lifting rotating mechanism for horizontal support arm for tide generating
CN203670094U (en) Horizontal-axis wind driven generator
CN203064997U (en) Wind driven generator and cabin assembly sling
CN101514677B (en) Vertical wind driven generator
CN103195660B (en) A kind of pylon of truss structure
CN101708812A (en) Self-lifting hoister and using method thereof
CN201907919U (en) Lifting appliance for foundation ring of wind power tower cylinder
CN201343379Y (en) Crane used for maintenance of large-size wind power equipment
CN113864124A (en) Wind power blade hoisting construction method under mountain land condition
CN101492143B (en) Wind power generation structure system combined hanging method and rotary suspension arm mechanism
CN208716716U (en) Wind-power electricity generation installs loop wheel machine
CN201178385Y (en) Height solar generating device
CN2926566Y (en) Gantry hydraulic generator
CN210620063U (en) Hoisting device for transporting goods from fan cabin

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100526

Termination date: 20110717