CN201463915U - Multi-channel lift observation recorder - Google Patents

Multi-channel lift observation recorder Download PDF

Info

Publication number
CN201463915U
CN201463915U CN2009200831419U CN200920083141U CN201463915U CN 201463915 U CN201463915 U CN 201463915U CN 2009200831419 U CN2009200831419 U CN 2009200831419U CN 200920083141 U CN200920083141 U CN 200920083141U CN 201463915 U CN201463915 U CN 201463915U
Authority
CN
China
Prior art keywords
observation
lifts
lift
recorder
record instrument
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009200831419U
Other languages
Chinese (zh)
Inventor
蒋小春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2009200831419U priority Critical patent/CN201463915U/en
Application granted granted Critical
Publication of CN201463915U publication Critical patent/CN201463915U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Testing Or Calibration Of Command Recording Devices (AREA)

Abstract

The utility model discloses a multi-channel lift observation recorder, belonging to a grouting construction recorder and solving the problem of difficult record of information in the prior art. The multi-channel lift observation recorder comprises a lift observation recorder host, a lift observation sensor, a printer and an alarm, wherein the lift observation sensor, the printer and the alarm are respectively connected with the lift observation recorder; the lift observation recorder host comprises a data acquisition module, a central processing unit, a keyboard, a display and an electronic hard disk; and the data acquisition module, the keyboard, the electronic hard disk and the display are respectively connected with the central processing unit. The recorder of the utility model replaces the current manual observation mode, realizes the purpose of automatically observing a plurality of lifts at the same time, has the characteristics of all-weather observation and automatic alarm, and has high practical value.

Description

A kind of hyperchannel lifts the observational record instrument
Technical field
The utility model relates to a kind of grouting construction information recorder device, specifically, relates to a kind of hyperchannel and lifts the observational record instrument.
Background technology
Grouting works is the foundation treatment engineering of a key in fields such as water conservancy and hydropower, construction work, requires the observation face of land to lift in the filling process, need handle when lifting on the face of land, prevents to lift to cause the accident.Traditional observation instrument is a kind of mechanical type displacement measuring instrument a---clock gauge, when using clock gauge to measure the face of land to lift, the people must keep the reading of observing clock gauge on the next door of clock gauge, and carry out hand-kept at certain time intervals, find to notify the related personnel to handle when the value of lifting surpasses setting value.The defective that above method exists is as follows: 1, the people can't guarantee that all the time (go to toilet, absent-minded) all stares at clock gauge, test leakage may occur, thereby cause the generation of security incident in observation process; 2, a people can't observe for a long time, and each lifts observation station needs to arrange day shift, night shift 2 personal responsibilities at least, and the labour cost of observation is very high; 3, artificial read untrue; 4, the data of artificial record does not have consolidation form, is inconvenient to put in order, preserve, and is not easy to check in the future.How more effective, more timely, observe more accurately and the record value of lifting is the grouting works problem demanding prompt solution.
The utility model content
The purpose of this utility model is to provide a kind of hyperchannel to lift the observational record instrument, and the way of the artificial observation value of lifting that substitute to fall behind is lifted lifting of observation station and carries out auto-measuring, demonstration, record, warning and report printing simultaneously a plurality of by registering instrument.
To achieve these goals, the technical solution adopted in the utility model is as follows:
A kind of hyperchannel lifts the observational record instrument, it is characterized in that, comprises lifting observational record instrument main frame, lifting observation sensor, printer and alarm, described lift observation sensor, printer and alarm respectively with lift the observational record instrument and link to each other.
The described observational record instrument main frame that lifts is made up of data acquisition module, central processing unit, keyboard, display and electronic hard disc, and described data acquisition module, keyboard, display and electronic hard disc are connected with central processing unit respectively.
The described observation sensor that lifts is for changing displacement into the displacement transducer of electric signal.According to actual needs, and lift the quantity that lifts observation sensor that observational record instrument main frame links to each other and to change, but should have one at least.
Cooperate design of software corresponding, the utility model can be realized following function:
1. observe simultaneously and show a plurality of passage values of lifting;
2. when the value of lifting surpasses setting value, produce a record automatically; Produce a record every setting-up time when not lifting;
3. when any one passage lifts above predefined alarming value (for example: during 200um), carry out sound and light alarm;
4. can will write down the result by standard A 4 paper and print, record standard, format standard, check, put in order, all very convenient when preserving;
5. lift the detection distance, lift observation station and can reach 500 meters, can change the memory capacity of registering instrument by the capacity that changes electronic hard disc from the registering instrument maximum distance, very convenient.
Compared with prior art, the utility model has been realized that automatic observation is a plurality of and has been lifted, and has saved human resources greatly, has saved the manpower cost, having more round-the-clock uninterrupted observation, observed result advantage accurately, is a kind of grouting construction information recorder with very high practical value and promotional value.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
Embodiment
As shown in Figure 1, a kind of hyperchannel lifts the observational record instrument, comprise and lift observational record instrument main frame, lift observation sensor, printer and alarm, wherein, lifting observational record instrument main frame is made up of data acquisition module, central processing unit, keyboard, display and electronic hard disc, described data acquisition module, keyboard and display are connected with central processing unit is unidirectional respectively, and electronic hard disc is connected with central processing unit is two-way.
Described display is a LCDs.
The described quantity that lifts observation sensor is four.
Lifting observation sensor is input media, links to each other with the data acquisition module that lifts observational record instrument main frame inside by cable; Lifting observational record instrument main frame inside, data acquisition module will be handled to central processing unit from the data transmission that lifts the observation sensor acquisition, operating personnel can be by keyboard to the central processing unit input instruction, data are delivered on the display show, electronic hard disc is carried out reading and storing of data.
Printer and alarm are output unit, link to each other with the central processing unit that lifts observational record instrument main frame inside by cable respectively, and according to the setting value of central processing unit inside, alarm can be realized in good time warning, remind the staff to carry out respective handling.

Claims (4)

1. a hyperchannel lifts the observational record instrument, it is characterized in that, comprises lifting observational record instrument main frame, lifting observation sensor, printer and alarm, described lift observation sensor, printer and alarm respectively with lift the observational record instrument and link to each other.
2. hyperchannel according to claim 1 lifts the observational record instrument, it is characterized in that, the described observational record instrument main frame that lifts is made up of data acquisition module, central processing unit, keyboard, display and electronic hard disc, and described data acquisition module, keyboard, display and electronic hard disc are connected with central processing unit respectively.
3. hyperchannel according to claim 1 lifts the observational record instrument, it is characterized in that, the described quantity that lifts observation sensor is at least one.
4. hyperchannel according to claim 1 lifts the observational record instrument, it is characterized in that, the described observation sensor that lifts is a displacement transducer.
CN2009200831419U 2009-08-05 2009-08-05 Multi-channel lift observation recorder Expired - Fee Related CN201463915U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009200831419U CN201463915U (en) 2009-08-05 2009-08-05 Multi-channel lift observation recorder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009200831419U CN201463915U (en) 2009-08-05 2009-08-05 Multi-channel lift observation recorder

Publications (1)

Publication Number Publication Date
CN201463915U true CN201463915U (en) 2010-05-12

Family

ID=42391266

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009200831419U Expired - Fee Related CN201463915U (en) 2009-08-05 2009-08-05 Multi-channel lift observation recorder

Country Status (1)

Country Link
CN (1) CN201463915U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101871213A (en) * 2010-06-09 2010-10-27 成都中大华瑞科技有限公司 Anti-cheating method for grouting automatic recording instrument
CN102182190A (en) * 2011-03-31 2011-09-14 成都山江岩土科技有限责任公司 Automatic grouting monitoring equipment and method
CN103575481A (en) * 2012-07-30 2014-02-12 中航鼎衡造船有限公司 Pressure recording and monitoring station for liquefied gas carrier piping system strength and tightness test

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101871213A (en) * 2010-06-09 2010-10-27 成都中大华瑞科技有限公司 Anti-cheating method for grouting automatic recording instrument
CN102182190A (en) * 2011-03-31 2011-09-14 成都山江岩土科技有限责任公司 Automatic grouting monitoring equipment and method
CN102182190B (en) * 2011-03-31 2012-12-05 成都山江岩土科技有限责任公司 Automatic grouting monitoring equipment and method
CN103575481A (en) * 2012-07-30 2014-02-12 中航鼎衡造船有限公司 Pressure recording and monitoring station for liquefied gas carrier piping system strength and tightness test

Similar Documents

Publication Publication Date Title
CN106500928A (en) A kind of reservoir dam Seepage Safety online auto monitoring system
CN201463915U (en) Multi-channel lift observation recorder
WO2012058853A1 (en) Material property testing apparatus
CN104990492A (en) Equipment for submarine landslide monitoring
CN203758958U (en) Weak magnetic online monitoring system for defects of mining steel rope
CN103399364B (en) A kind of anemometer tower system comprising two cover wind measuring devices
CN102174807A (en) Ropeless static penetrometer and method for acquiring and processing data
CN201488746U (en) four-parameter grouting recorder
CN104089734B (en) Variable element formula deep water mesh cage mooring force Acquisition Instrument
CN202430751U (en) Displacement observation recorder capable of connecting with digital dam
CN103105265B (en) On-line monitor for strain gauge load cell
CN201990996U (en) Cable-less type static-sounding instrument
CN201732175U (en) Data acquisition system of nuclear power plant meteorological station
CN104359396A (en) Landslide deep inclination monitoring device and method
CN202658592U (en) Grid-capacitance dam grouting lift deformation monitoring system
CN111308501A (en) Laser radar wind measurement buoy offshore contrast verification test field and test method thereof
CN204788240U (en) A equipment for submarine landslide monitoring
CN2807234Y (en) Tightness detector for pipe and pressure container
CN103337154A (en) Intelligent wireless digital-readout displacement detection/monitoring system
CN203455052U (en) Ultrasonic liquid-level recorder based on automatic file management system and GSM module
CN106595814A (en) Water level remote monitoring method and water level remote monitoring system
CN211317370U (en) Power plant thermal instrument detection and use cycle management system
CN215974636U (en) Displacement detection device for automatic sequencing of tower cranes
CN221124900U (en) Edge side wind power plant meteorological information detection device
CN203163929U (en) Pressure measuring remembering apparatus

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100512

Termination date: 20100805