CN201459755U - Bolt sleeve for construction of equipment foundation - Google Patents
Bolt sleeve for construction of equipment foundation Download PDFInfo
- Publication number
- CN201459755U CN201459755U CN 200920110722 CN200920110722U CN201459755U CN 201459755 U CN201459755 U CN 201459755U CN 200920110722 CN200920110722 CN 200920110722 CN 200920110722 U CN200920110722 U CN 200920110722U CN 201459755 U CN201459755 U CN 201459755U
- Authority
- CN
- China
- Prior art keywords
- sleeve
- bolt
- construction
- welded
- anchor slab
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
A bolt sleeve for the construction of an equipment foundation belongs to the technical field of building construction. The bolt sleeve comprises a bolt box, a sleeve and a fixed frame, and is characterized in that the bolt box comprises an anchor plate (1), a baffle (3), and a bottom box (2) on the lower surface of the anchor plate; after being perforated and polished, the anchor plate (1) is welded with the baffle (3), and then steel plates around the bottom surface of the anchor plate are welded; the baffle (3) is welded with the anchor plate (1); the bottom box (2) is in welding connection with the anchor plate (1); a cover plate is welded at the top part of the sleeve; and the height of welding seams is no less than 5 mm. The utility model has the advantage that the bolt sleeve can be processed and manufactured at the construction site, thereby meeting the urgent need for the construction, shortening the construction period and reducing the construction cost.
Description
Technical field
The utility model belongs to technical field of building construction, the working bolt sleeve of particularly a kind of Equipment Foundations.
Background technology
In the construction of industrial construction Equipment Foundations,, often adopt the sleeve mounting means because bolt quantity is many, installation accuracy requires height.Sleeve processing request precision is higher, and normally consigned processing brand-name computer tool processing because of reasons such as processing charges height, now changes processing at the construction field (site) into, and from the bolt sleeve that processes, each side can both meet design requirement.Field machining is promptly convenient, fast, work hard in glove with conveniently, saves fund again.
Summary of the invention
The purpose of this utility model is, provides a kind of Equipment Foundations working bolt sleeve, overcomes the high deficiency of existing mechanical processing factory processing charges, realizes the bolt sleeve of field machining, not only can satisfy quality requirement, and can save processing charges.
The utility model comprises bolt box, sleeve, fixed mount: the bottom box of bolt box below anchor slab, baffle plate and anchor slab formed; Anchor slab perforate polishing back and baffle plate welding are welded the steel plate on every side of anchor slab bottom surface then; Being connected between baffle plate and the anchor slab is welding, is welded to connect between bottom box and the anchor slab; Weld bead height is not less than 5mm.It is welded by steel plate, after the center line of bolt box and sleeve and verticality all meet the requirements, will overlap tube bottom and the bottom box carries out weld all around, and bridge welding is connected on the sleeve top.Weld bead height is not less than 5mm.
Fixed mount described in the utility model is made up of column, diagonal brace, girt; Fixed mount adopts channel-section steel and angle steel to be welded, and wherein, column (6) adopts No. 10 channel-section steels, and the diagonal brace (7) between the column (6) is connected with 40 * 4 angle steel with girt (8), and connected mode all adopts welding.
The utility model can be processed according to field demand; Can adjust processing progress at any time according to on-the-spot needs; Can in time correct solution to the problem of finding; Reduce the milling machine operation, shorten the process-cycle; Also reduce transportation, processing cost simultaneously.Deviation in the construction strengthens, and has improved the installation accuracy of bolt sleeve.
The beneficial effects of the utility model are after bolt sleeve adopts field machining, and convenient construction is saved the project expense.
Description of drawings
Below in conjunction with accompanying drawing and embodiment the utility model is described further.
Fig. 1 is the sectional drawing of the utility model T type bolt sleeve chief component.Wherein, anchor slab 1, bottom box 2, baffle plate 3, sleeve 4, cover plate 5.
Fig. 2 is the plan view of the utility model T type bolt sleeve chief component.Wherein, anchor slab 1, bottom box 2, baffle plate 3.
Fig. 3 is the fixed mount of the utility model T type bolt sleeve.Wherein, sleeve 4, column 6, diagonal brace 7, girt 8.
The specific embodiment
Fig. 1~Fig. 2 is a kind of specific embodiment of the present utility model.
In Fig. 1, being connected between baffle plate 3 and the anchor slab 1 is welding, and being connected between bolt box 2 and the anchor slab 1 is to weld.
In Fig. 2, being connected between sleeve 4 and the anchor slab 1 is welding, and being connected between sleeve 4 and the cover plate 5 is to weld.
In Fig. 3, being connected between the column 6 of fixed mount and the diagonal brace 7 is welding, and being connected between the column 6 of fixed mount and the girt 8 is to weld.
The key of bolt sleeve field machining is the processing of bolt box and the location of sleeve.Before the anchor slab perforate on the bolt box, on anchor slab, eject centre of location line earlier, carry out perforate with milling machine again, with grinding machine the anchor slab bottom is polished flat after the perforate, and use the steel nail dotting punch, carry out nonvolatil mark.Welding T type bolt baffle plate must guarantee that the baffle plate direction is accurate during the baffle plate welding after the anchor slab moulding.Carry out sleeve location unwrapping wire after the bolt box machines, and welding positioning steel tube ring, the position that guarantees sleeve accurately and verticality meet the demands.
Claims (2)
1. the working bolt sleeve of Equipment Foundations comprises bolt box, sleeve, fixed mount, it is characterized in that: the bottom box (2) of bolt box below anchor slab (1), baffle plate (3) and anchor slab formed; Anchor slab (1) perforate polishing back and baffle plate (3) welding are welded the steel plate on every side of anchor slab bottom surface then; Being connected between baffle plate (3) and the anchor slab (1) is welding, is welded to connect between bottom box (2) and the anchor slab (1); Bridge welding is connected on the sleeve top; Weld bead height is not less than 5mm.
2. bolt sleeve according to claim 1 is characterized in that: described fixed mount is made up of column, diagonal brace, girt; Fixed mount adopts channel-section steel and angle steel to be welded, and column (6) adopts No. 10 channel-section steels, and the diagonal brace (7) between the column (6) is connected with 40 * 4 angle steel with girt (8), and connected mode all adopts welding.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200920110722 CN201459755U (en) | 2009-08-07 | 2009-08-07 | Bolt sleeve for construction of equipment foundation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200920110722 CN201459755U (en) | 2009-08-07 | 2009-08-07 | Bolt sleeve for construction of equipment foundation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201459755U true CN201459755U (en) | 2010-05-12 |
Family
ID=42387108
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200920110722 Expired - Lifetime CN201459755U (en) | 2009-08-07 | 2009-08-07 | Bolt sleeve for construction of equipment foundation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201459755U (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102080417A (en) * | 2010-12-15 | 2011-06-01 | 中国二十二冶集团有限公司 | Construction method for split burying of large T-shaped sleeve bolt |
CN103321239A (en) * | 2013-06-26 | 2013-09-25 | 中煤邯郸特殊凿井有限公司 | Drilling machine foundation |
CN103790177A (en) * | 2014-01-15 | 2014-05-14 | 中色十二冶金建设有限公司 | Formwork construction method for small type circular device foundation |
CN104831745A (en) * | 2015-04-15 | 2015-08-12 | 广东省建筑工程集团有限公司 | High-precision mounting method of target center substrate and sealing cylinder pedestal |
CN104863174A (en) * | 2015-05-29 | 2015-08-26 | 山西宏厦建筑工程有限公司 | Equipment foundation dismounting-free bolt box construction method |
CN106351246A (en) * | 2015-07-15 | 2017-01-25 | 五冶集团上海有限公司 | Installing method of the integral sleeve of a kind of T -bolt (diameter <= 48mm) |
CN106801434A (en) * | 2017-03-31 | 2017-06-06 | 天津天建设集团有限公司 | Packing hole hydraulic pressure sleeve pipe construction method of installation |
CN107542103A (en) * | 2016-06-23 | 2018-01-05 | 中国二十冶集团有限公司 | The inflated rubber bolt collar and installation method that can be used in turn |
CN108118724A (en) * | 2016-11-29 | 2018-06-05 | 中国二十冶集团有限公司 | T-bolt anchor box leak blocking method |
-
2009
- 2009-08-07 CN CN 200920110722 patent/CN201459755U/en not_active Expired - Lifetime
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102080417A (en) * | 2010-12-15 | 2011-06-01 | 中国二十二冶集团有限公司 | Construction method for split burying of large T-shaped sleeve bolt |
CN103321239A (en) * | 2013-06-26 | 2013-09-25 | 中煤邯郸特殊凿井有限公司 | Drilling machine foundation |
CN103321239B (en) * | 2013-06-26 | 2015-09-30 | 中煤邯郸特殊凿井有限公司 | A kind of rig basis |
CN103790177A (en) * | 2014-01-15 | 2014-05-14 | 中色十二冶金建设有限公司 | Formwork construction method for small type circular device foundation |
CN104831745A (en) * | 2015-04-15 | 2015-08-12 | 广东省建筑工程集团有限公司 | High-precision mounting method of target center substrate and sealing cylinder pedestal |
CN104863174A (en) * | 2015-05-29 | 2015-08-26 | 山西宏厦建筑工程有限公司 | Equipment foundation dismounting-free bolt box construction method |
CN106351246A (en) * | 2015-07-15 | 2017-01-25 | 五冶集团上海有限公司 | Installing method of the integral sleeve of a kind of T -bolt (diameter <= 48mm) |
CN106351246B (en) * | 2015-07-15 | 2018-09-14 | 五冶集团上海有限公司 | The integral sleeve installation method of T-bolt diameter≤48mm |
CN107542103A (en) * | 2016-06-23 | 2018-01-05 | 中国二十冶集团有限公司 | The inflated rubber bolt collar and installation method that can be used in turn |
CN108118724A (en) * | 2016-11-29 | 2018-06-05 | 中国二十冶集团有限公司 | T-bolt anchor box leak blocking method |
CN106801434A (en) * | 2017-03-31 | 2017-06-06 | 天津天建设集团有限公司 | Packing hole hydraulic pressure sleeve pipe construction method of installation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201459755U (en) | Bolt sleeve for construction of equipment foundation | |
CN101831917B (en) | Mounting construction method of liner plates during mounting large-scale precision equipment | |
CN102764956B (en) | Production process of steel moulding plate | |
CN203891058U (en) | Built-in foundation bolt positioning tool for fixed type tower crane foundation | |
CN103485539B (en) | The construction control method of large-scale direct burial steel anchor fluke built-in fitting | |
CN101972920A (en) | Processing method of gear reducer | |
CN204381672U (en) | A kind of Splicing welding machine centralising device | |
CN102433996A (en) | Method for constructing wafer board with SMC (Sheet Molding Compound) hole forming mould | |
CN103835308A (en) | Method for installing embedded base plate of machine tool | |
CN102135223A (en) | Method for adjusting base plates for high-accuracy machinery installation | |
CN110005073A (en) | A kind of fixed built-in fitting of non-solder plate and its fixing means | |
CN202170645U (en) | Aligning positioner for cup-rim steel column | |
CN201891171U (en) | Integral bolt assembling frame | |
CN201377173Y (en) | Foundation bolt positioning template of steel-structure building | |
CN203254324U (en) | Tool for manufacturing lower support of tower crane | |
CN205591250U (en) | Fixed portable location frock with rag bolt of tower machine | |
CN205703095U (en) | L-type positioner | |
CN214574096U (en) | Cup type basis steel column quick mounting structure | |
CN205817293U (en) | A kind of laser cutting machine bed | |
CN204199323U (en) | For the positioning screw hole mould of pre-embedded bolt quick position | |
CN204661242U (en) | Equipment installs the jacking apparatus of leveling centering | |
CN210067466U (en) | Vertical storage tank flip-chip method roof construction location and support mould | |
CN206667286U (en) | A kind of high precision large-sized bolt sleeve bottom positioner | |
CN203636260U (en) | Novel quick positioning tool for puller | |
CN203738284U (en) | Welding clamp |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20100512 |