CN201458681U - Multifunctional operation trolley for metal storage tank - Google Patents

Multifunctional operation trolley for metal storage tank Download PDF

Info

Publication number
CN201458681U
CN201458681U CN2009201096858U CN200920109685U CN201458681U CN 201458681 U CN201458681 U CN 201458681U CN 2009201096858 U CN2009201096858 U CN 2009201096858U CN 200920109685 U CN200920109685 U CN 200920109685U CN 201458681 U CN201458681 U CN 201458681U
Authority
CN
China
Prior art keywords
lifting
storage tank
fighting
base
stop people
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2009201096858U
Other languages
Chinese (zh)
Inventor
李国锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
China Petroleum Pipeline Bureau Co Ltd
Original Assignee
China National Petroleum Corp
China Petroleum Pipeline Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Petroleum Corp, China Petroleum Pipeline Bureau Co Ltd filed Critical China National Petroleum Corp
Priority to CN2009201096858U priority Critical patent/CN201458681U/en
Application granted granted Critical
Publication of CN201458681U publication Critical patent/CN201458681U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model provides a multifunctional operation trolley for a metal storage tank capable of performing the all-position construction operation to a metal storage tank, and relates to the technical field of pipeline systems. The multifunctional operation trolley comprises a working base (4), a lifting vertical frame (2), a fixed pulling frame (1) and a lifting platform (3). The upper end of the lifting vertical frame (2) the lower end of which is fixedly connected with the working base (4) is connected and fixed with one end of the fixed pulling frame (1), the other end of the fixed pulling frame (1) is nested on an exhaust valve in the center of the storage tank in a rotatablely connected manner, and the lifting platform (3) is positioned on the lifting vertical frame (2) through two groups of encircled small wheels (6). The utility model can be moved randomly around the storage tank through the fixed pulling frame (1) and the working base (4), and the lifting platform (3) can move up and down freely on the lifting vertical frame (2), therefore, the lifting platform (3) is operated at any point of the storage tank. The operation trolley has the advantages of time conservation, labor conservation, safety and high efficiency during the construction operation.

Description

Metal tank multi-function operation dolly
Technical field
The utility model is a kind of metal tank multi-function operation dolly that metal tank is carried out full position construction operation.Relate to the plumbing system technical field.
Background technology
In the production and transportation of petroleum products, the storage of oil product is absolutely necessary.At present the storage tank that stores of oil product mainly is a metal tank, and is that the volume of storage tank is increasing, highly more and more higher.Like this in the storage tank manufacture process, to the sandblast of tank body, eliminate rust, spray paint, a series of construction operations such as high-altitude welding, not only quantities is big, and task difficulty is also quite big.Past all is to adopt the mode scaffold erecting or hang pocket up to now, takes a lot of work, time-consuming, expense material, and the cost height, efficient is low.Certainly, when the welded tank wallboard, to scaffold erecting usually, can utilize existing scaffold naturally sandblast, rust cleaning, the spray painting operation of tank body.So after the can body welding is finished, take scaffold again, the one, cause the waste of resource; The 2nd, scaffold also is an impediment to some follow-up operations.Condition just can be finished high-altitude welding, sandblast, eliminate rust, spray paint if any not scaffolding erecting etc. a series of construction operations wouldn't be better.
The utility model content
The purpose of this utility model is that design a kind ofly saves time, the metal tank multi-function operation dolly of laborsaving, safety, metal tank construction operation that efficient is high.
Structure of the present utility model as shown in Figure 1, it by walking basal seat 4, lifting stand 2, fixedly try to stop people from fighting each other 1, lifting table 3 four parts form.Be connected lifting stand 2 upper ends of walking basal seat 4, lower end are connected and fixed 1 the end of trying to stop people from fighting each other, and 1 other end of fixedly trying to stop people from fighting each other is enclosed within on the blow off valve at storage tank center and becomes to be rotationally connected, and lifting table 3 is encircled steamboat 6 by two groups and is positioned in the lifting stand 2.
Wherein:
The structure of lifting stand 2 as shown in Figure 1 and Figure 4, it is that upper end two vertical rods that " X " type fixed link is connected by adding between two cross-linings and the cross-lining again, the lower end is fixed on the walking basal seat 4 constitute; The below of cross-lining is fixed with pulley 9 under the top, and pulley 9 and winch, lifting table 3 constitute jacking system; Two of lifting stand 2 are fixed with safety hook every a segment distance above the vertical rod, hang staff's safety strap, or hang lifting table, thereby reach safer effect;
The structure of walking basal seat 4 as shown in Figure 7, it has base 12, base wheel 7, base wheel shaft 8, four root posts 13, at the two ends of arc-shaped base 12 a base wheel shaft 8 is installed respectively, 7, four base wheels 7 of base wheel and the base 12 common formations camber concentric with the storage tank arc are respectively installed in base wheel shaft 8 two ends; Base wheel shaft 8 drives by three phase asynchronous motor, realizes walking from the rotating ring storage tank; Base 12 middle positions are placed winch, are used for the lifting manned platform, realize the vertical operation to storage tank, and base respectively has a root post 13 to be used for supporting to reduce to the lifting table at the end for 12 4 jiaos, and there is guard bar the front and back of wheel, protect the wheel evil that is not wound;
The structure of lifting table 3 such as Fig. 5-shown in Figure 6, it comprises platform 11, encircles steamboat 6, encircles steamboat support 5 and fence 10; With hurdle 10 around the ring is arranged on the platform 11 of the concentric camber of storage tank arc, two holes that cover 2 two vertical rods of lifting stand are arranged on the platform 11, platform 11 upper and lowers in this two hole respectively have one group to encircle steamboat 6, one group is six, each three triangularity is embraced lifting column up and down, makes the steady lifting of lifting table; There is hook at the lifting table middle part, is used for hanging the steel rope of winch; Be fixed with control button on the platform fence, be used for controlling winch and movable motor, adjust height and position, the left and right sides up and down;
Fixedly try to stop people from fighting each other 1 structure as shown in Figures 2 and 3, and it has fixedly tries to stop people from fighting each other and walker two parts; The structure of fixedly trying to stop people from fighting each other is seen Fig. 2, and it is a spider, and its top is the round cutting ferrule that two semi arches constitute, and the bipod of spider is the crescent moon clamp; 1 the bipod of fixedly trying to stop people from fighting each other is fixed on the top of lifting column by the crescent moon clamp, and the round cutting ferrule at top is enclosed within on the blow off valve of storage tank central authorities, can be that axle rotates with the blow off valve; The structure of walker is seen Fig. 3, and it is " П " shape frame, and at bipod a rubber steamboat is installed respectively, and there are a plurality of holes the upper end of walker, is connected with fixedly trying to stop people from fighting each other with screw; Fixedly trying to stop people from fighting each other 1 is the center along the walking rotation of storage tank edge with storage tank central authorities, and it is faster that dolly is worked together.
The utility model with fixedly try to stop people from fighting each other 1 and walking basal seat 4 can move arbitrarily around storage tank, and lifting table 3 can freely move up and down in lifting stand 2, so the at a point that lifting table 3 just can arrive storage tank carries out operation.And this operating trolley saves time when construction operation, laborsaving, safety, efficient height.
Description of drawings
The overall pie graph of Fig. 1 metal tank multi-function operation dolly
Fig. 2 constructional drawing of fixedly trying to stop people from fighting each other
Fig. 3 walker constructional drawing of fixedly trying to stop people from fighting each other
Fig. 4 lifting stand constructional drawing
Fig. 5 lifting table front elevation
Fig. 6 lifting table birds-eye view
Fig. 7 walking basal seat birds-eye view
The wherein 1-2-lifting stand of fixedly trying to stop people from fighting each other
3-lifting table 4-walking basal seat
5-encircles steamboat support 6-and encircles steamboat
7-base wheel 8-base wheel shaft
9-pulley 10-fence
11-platform 12-base
The 13-column
The specific embodiment
Embodiment. this example is an experimental prototype, and it constitutes as shown in Figure 1.This example is the multi-function operation dolly of 5000 cubic meter storage tanks.It by walking basal seat 4, lifting stand 2, fixedly try to stop people from fighting each other 1, lifting table 3 four parts form.Be connected lifting stand 2 upper ends of walking basal seat 4, lower end are connected and fixed 1 the end of trying to stop people from fighting each other, and 1 other end of fixedly trying to stop people from fighting each other is enclosed within on the blow off valve at storage tank center and becomes to be rotationally connected, and lifting table 3 is encircled steamboat 6 by two groups and is positioned in the lifting stand 2.
The structure of lifting stand 2 as shown in Figure 1 and Figure 4, it is that upper end two vertical rods that " X " type fixed link is connected by adding between two cross-linings and the cross-lining again, the lower end is fixed on the walking basal seat 4 constitute; Two vertical rods are made of the steel pipe 10m of Φ 120mm, wall thickness 3mm is long, and " X " type fixed link welds with Φ 20mm steel pipe between two cross-linings of upper end and the cross-lining, and the width of lifting stand 2 is 1500mm; The below of cross-lining is fixed with pulley 9 under the top, and pulley 9 and winch, lifting table 3 constitute jacking system; Two of lifting stand 2 are fixed with safety hook every 300mm above the vertical rod;
The structure of walking basal seat 4 as shown in Figure 7, a base wheel shaft 8 is respectively installed at two ends at the arc-shaped base 12 of R15m, long 2m, wide 1m, 7, four base wheels 7 of Φ 200mm base wheel and the base 12 common formations camber concentric with the storage tank arc are respectively installed in base wheel shaft 8 two ends; Base wheel shaft 8 drives by Y112s-4 type three phase asynchronous motor; Base 12 middle positions are placed JM12 type winch, and walking basal seat respectively has Φ 80 * 1500mm column 13 for 4 four jiaos, and there is guard bar the front and back of wheel;
The structure of lifting table 3 such as Fig. 5-shown in Figure 6, with hurdle 10 around the ring that height 1.2m is arranged on the platform 11 of concentric R15m, the long 2m of storage tank arc, wide 1m camber, two Φ 130mm holes that cover 2 two vertical rods of lifting stand are arranged on the platform 11, platform upper and lower in this two hole respectively has one group of Φ 50mm to encircle steamboat 6, one group is six, and each three triangularity is embraced lifting column up and down; There is hook at lifting table 3 middle parts; Be fixed with the button of control winch and movable motor on the platform fence 10;
Fixedly try to stop people from fighting each other 1 structure as shown in Figures 2 and 3, and it has fixedly tries to stop people from fighting each other and walker two parts; The structure of fixedly trying to stop people from fighting each other is seen Fig. 2, and it is an isoceles triangle frame, the high 15m of isoceles triangle frame, and low wide 1500mm, its top is the Φ 250mm circle cutting ferrule that two semi arches constitute, the bipod of spider is a R120mm crescent moon clamp; The structure of walker is seen Fig. 3, and it is 800 * 1500mm " П " shape frame, and at bipod a Φ 80mm rubber steamboat is installed respectively, and there are a plurality of holes the upper end of walker, is connected with fixedly trying to stop people from fighting each other with screw.
This example is tested in the prolonged oil depot process of construction of Sichuan Province's Xichang City, this equipment is the sand blasting work through finishing five 5000 cubic meter storage tanks in 3 days under 3 workmans operation, and finish this need of work 20 people and just can finish in 10 days with the tradition sand blasting form of construction work that scaffolds erecting.By contrast, use this equipment to save 1528 man-hours, greatly reduce cost, improved operating efficiency.Avoid the dangerous hidden danger of artificial climbing scaffold aloft work, reduced working strength of workers.This equipment has been subjected to the consistent favorable comment of in-place test operating personal, and is time saving and energy saving easy and simple to handle safer, and it is more quick to construct.

Claims (5)

1. metal tank multi-function operation dolly is characterized in that it is made up of walking basal seat (4), lifting stand (2), fixedly try to stop people from fighting each other (1), lifting table (3) four parts; Be connected lifting stand (2) upper end of walking basal seat (4), lower end is connected and fixed the end of try to stop people from fighting each other (1), (1) other end of fixedly trying to stop people from fighting each other is enclosed within on the blow off valve at storage tank center and becomes to be rotationally connected, and lifting table (3) is encircled steamboat (6) by two groups and is positioned in the lifting stand (2).
2. metal tank multi-function operation dolly according to claim 1, the structure that it is characterized in that described lifting stand (2) are that the upper end is made of two vertical rods that add again between two cross-linings and the cross-lining on " X " type fixed link is connected, the lower end is fixed on walking basal seat (4); The below of cross-lining is fixed with pulley (9) under the top, and pulley (9) and winch, lifting table (3) constitute jacking system; Two of lifting stand (2) are fixed with the safety strap of hanging the staff or the safety hook of hanging lifting table every a segment distance above the vertical rod.
3. metal tank multi-function operation dolly according to claim 1, it is made up of base (12), base wheel (7), base wheel shaft (8), four root posts (13) to it is characterized in that described walking basal seat (4), one base wheel shaft (8) respectively is installed at the two ends of arc-shaped base (12), base wheel (7) is respectively installed at base wheel shaft (8) two ends, four base wheels (7) and the common formation of the base camber concentric with the storage tank arc; Base wheel shaft (8) is by the walking of three phase asynchronous motor driving ring storage tank; Base (12) middle position is placed the winch of lifting manned platform, and (4) four jiaos of walking basal seat respectively have a column (13) that is used for supporting the lifting table of reducing to the end, and there is guard bar the front and back of wheel.
4. metal tank multi-function operation dolly according to claim 1 is characterized in that described lifting table (3) comprises platform (11), encircles steamboat (6), encircles little wheel support (5) and fence (10); With hurdle around the ring is arranged on the platform (11) of the concentric camber of storage tank arc, two holes that cover (2) two vertical rods of lifting stand are arranged on the platform (11), platform (11) upper and lower in this two hole respectively has one group to encircle steamboat (6), and one group is six, and each three triangularity is embraced lifting column up and down; There is the hook of hanging the winch steel rope at the lifting table middle part; Be fixed with the control button of control winch and movable motor on the platform fence (10).
5. metal tank multi-function operation dolly according to claim 1 is characterized in that described fixedly try to stop people from fighting each other (1) has fixedly to try to stop people from fighting each other and walker two parts; The structure of fixedly trying to stop people from fighting each other is a spider, and its top is the round cutting ferrule that two semi arches constitute, and the bipod of spider is the crescent moon clamp; The bipod of (1) of fixedly trying to stop people from fighting each other is fixed on the top of lifting column by the crescent moon clamp, and the round cutting ferrule at top is enclosed within on the blow off valve of storage tank central authorities, is that axle rotates with the blow off valve; The structure of walker is " ∏ " shape frame, and at bipod a rubber steamboat is installed respectively, and there are a plurality of holes the upper end of walker, is connected with fixedly trying to stop people from fighting each other with screw; Fixedly try to stop people from fighting each other (1) be the center along the walking rotation of storage tank edge with storage tank central authorities.
CN2009201096858U 2009-07-01 2009-07-01 Multifunctional operation trolley for metal storage tank Expired - Lifetime CN201458681U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009201096858U CN201458681U (en) 2009-07-01 2009-07-01 Multifunctional operation trolley for metal storage tank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009201096858U CN201458681U (en) 2009-07-01 2009-07-01 Multifunctional operation trolley for metal storage tank

Publications (1)

Publication Number Publication Date
CN201458681U true CN201458681U (en) 2010-05-12

Family

ID=42386034

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009201096858U Expired - Lifetime CN201458681U (en) 2009-07-01 2009-07-01 Multifunctional operation trolley for metal storage tank

Country Status (1)

Country Link
CN (1) CN201458681U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102602858A (en) * 2012-03-23 2012-07-25 常熟市平冶机械有限公司 Climb operation device
CN106891342A (en) * 2017-02-17 2017-06-27 福建品派包装有限公司 A kind of intelligent robot for library book storage
CN110271998A (en) * 2019-08-07 2019-09-24 油特机械工具(大连)有限公司 Automation combined type jack up unit for the processing of plurality of specifications cylinder

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102602858A (en) * 2012-03-23 2012-07-25 常熟市平冶机械有限公司 Climb operation device
CN106891342A (en) * 2017-02-17 2017-06-27 福建品派包装有限公司 A kind of intelligent robot for library book storage
CN110271998A (en) * 2019-08-07 2019-09-24 油特机械工具(大连)有限公司 Automation combined type jack up unit for the processing of plurality of specifications cylinder
CN110271998B (en) * 2019-08-07 2024-03-12 油特机械工具(大连)有限公司 Automatic combined lifting device for processing cylinders with various specifications

Similar Documents

Publication Publication Date Title
CN201183719Y (en) Revolving type mini single arm crane
CN201458681U (en) Multifunctional operation trolley for metal storage tank
CN209384612U (en) A kind of construction site foldable scaffold
CN210505462U (en) Practical lift for civil engineering
CN111299036A (en) Stand paint spraying apparatus
CN203834373U (en) Lifting movement mold carriage trolley for box culvert side wall formwork
CN202299366U (en) Quick construction hanger for inner wall of large storage tank
CN102720386A (en) Inversing method of inner side clustering hoop of vertical storage tank
CN203639007U (en) Rotary lifting mast
CN207483215U (en) A kind of removable Architectural Equipment hanging apparatus that can be rotated
CN201292511Y (en) Vertical lifting table for repairing overpass high pier stud
CN206220460U (en) For the operating platform of tower
CN212561215U (en) Back cage platform channel device
CN204098493U (en) The dismantled and assembled input and output material movable platform of a kind of modular for building
CN207700655U (en) A kind of precast beam stretching construction lift work platform
CN102277957B (en) Overhaul platform of desulfurizing tower
CN113059524A (en) Auxiliary propeller dismounting tool, dismounting method and mounting method
CN209077374U (en) A kind of industry storing top tank structure processing loading device
CN216553728U (en) Portable removes work platform
CN206144128U (en) Safe laborsaving pole setting of fixing a position
CN205526991U (en) A device for liftable erects to be coiled
CN204802881U (en) Novel material hoist
CN205742959U (en) A kind of lowering or hoisting gear relying on hydraulic lifting scaffold
CN206014347U (en) A kind of penstock space curved segment is installed and uses Three-dimensional movable job platform
CN205023810U (en) Anticorrosive operation platform in jar

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20100512

CX01 Expiry of patent term