CN201458346U CN2009201089002U CN200920108900U CN201458346U CN 201458346 U CN201458346 U CN 201458346U CN 2009201089002 U CN2009201089002 U CN 2009201089002U CN 200920108900 U CN200920108900 U CN 200920108900U CN 201458346 U CN201458346 U CN 201458346U
Authority
CN
China
Prior art keywords
pipe
conveying pipeline
airduct
material blanking
blanking tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2009201089002U
Other languages
Chinese (zh)
Inventor
王乃继
纪任山
冀飞
周建明
何海军
范玮
肖翠微
张帆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Energy saving Technology Co., Ltd.
Original Assignee
China Coal Research Institute CCRI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Coal Research Institute CCRI filed Critical China Coal Research Institute CCRI
Priority to CN2009201089002U priority Critical patent/CN201458346U/en
Application granted granted Critical
Publication of CN201458346U publication Critical patent/CN201458346U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Air Transport Of Granular Materials (AREA)

Abstract

The utility model relates to a pulseless coal powder feeding device. The feeding device is characterized in that a conveying pipe and an air pipe arranged under the conveying pipe are included; two ends of the conveying pipe are sealed, a feeding hole is formed on the upper side adjacent to one end, and a discharge hole is formed on the lower side adjacent to the other end; the feeding hole is radially connected with a storage bin; the discharge hole is radially connected with a blanking tube; the upper half part of the blanking pipe is vertical, the lower half part thereof is inclined towards the outer side of the conveying pipe; a feeding screw is arranged in the conveying pipe; one end of the feeding screw adjacent to the discharge hole is connected with the output end of a motor; one end of the conveying pipe adjacent to the motor is radially connected with a voltage stabilizer; one end of the air pipe is radially connected with the blanking pipe, and the other end thereof is connected with a fan; the lower half part of the blanking pipe is aslant connected with the inner side of the air pipe to form an included angle with the air pipe; a venturi structure is formed in the position where the inner side of the air pipe is connected with the blanking pipe; and an adjusting valve is also arranged on the air pipe. The utility model effectively avoids accumulation, blockage and unsmooth conveying of coal power in a coal conveying pipeline, has the advantage of quick, uniform, pulseless continuous power conveying operation, and is applicable to miniature industrial coil power boiler systems.

Description

A kind of pulse-free coal powder supply device
Technical field
The utility model relates to a kind of feeding device, particularly about the pulse-free coal powder supply device in a kind of pulverized-coal fired boiler.
Background technology
At present, feeding device in the tradition pulverized-coal fired boiler, generally be below the discharging opening of coal dust warehouse, the coal supply screw of one single head is set, end at the coal supply screw, be provided with one vertically downward material blanking tube and be connected with airduct, thereby by the wind-force in the airduct coal dust in the material blanking tube is blown in the boiler.The shortcoming of this feeding device is: coal supply powder pitch time is long, coal supply speed is slow and inhomogeneous, simultaneously because material blanking tube is vertically disposed, the feasible coal dust of sending in the airduct has the phenomenon of accumulation, be unfavorable in boiler furnace, blowing coal dust, cause the uneven problem of burning to occur in the boiler furnace.
Summary of the invention
At the problems referred to above, the purpose of this utility model provides a kind of pulse-free coal powder supply device of boiler coal supply powder that can be quickly and evenly be.
For achieving the above object, the utility model is taked following technical scheme: a kind of pulse-free coal powder supply device is characterized in that: it comprises that a horizontally disposed conveying pipeline and is horizontally set on the airduct of described conveying pipeline below; The closed at both ends of described conveying pipeline, its upside near an end has an inlet point, and the downside of the close other end has a discharging opening; Described inlet point radially connects a storage bin, and described discharging opening radially connects a material blanking tube; The first half of described material blanking tube is vertical, and the latter half tilts towards the described conveying pipeline outside; Be provided with a feed spiral in the described conveying pipeline, an end of the close described discharging opening of described feed spiral connects the mouth of an electrical motor, and described electrical motor is fixed on the outside of described conveying pipeline; End near described electrical motor on the described conveying pipeline radially connects a stable-pressure device; One end of described airduct radially connects described material blanking tube, and the another port connects a blowing engine; The latter half of described material blanking tube is oblique to be connected in the described airduct, makes and forms an angle between the latter half of described material blanking tube and the described airduct; In described airduct, be provided with a Venturi tube structure with described material blanking tube junction; Also be provided with a control cock on the described airduct.
Angle between the latter half of described material blanking tube and the described airduct is arranged between 30 °~60 °.
Described control cock adopts Electric air valve.
The utility model is owing to take above technical scheme, it has the following advantages: 1, owing to the utility model material blanking tube is inclined to set, and and airduct between form an angle, therefore make whole coal chute road level and smooth, avoid the dead angle, prevented that effectively coal dust from piling up, stopping up and carry not smooth phenomenon in the coal chute road.2, because the utility model is provided with Venturi tube structure and stable-pressure device, in the pulverized coal conveying process, feed very fast evenly can be realized the purpose of continuous pulse free for powder, can not stop up.The utility model can be widely used in the small and medium-sized industrial coal powder boilers system or other storage powder-supply systems in.
Description of drawings
Fig. 1 is a structural representation of the present utility model
The specific embodiment
Below in conjunction with drawings and Examples the utility model is described in detail.
As shown in Figure 1, the utility model comprises that a horizontally disposed conveying pipeline 1 and is horizontally set on the airduct 2 of conveying pipeline 1 below.
The closed at both ends of conveying pipeline 1, its upside near an end has an inlet point 3, and the downside of the close other end has a discharging opening 4.Inlet point 3 radially connects the discharging opening of a coal dust warehouse 5, and discharging opening 4 radially connects a material blanking tube 6.The first half of material blanking tube 6 is vertical, and the latter half tilts towards conveying pipeline 1 outside.Be provided with a feed spiral 7 in the conveying pipeline 1, an end of feed spiral 7 close discharging openings 4 connects the mouth of an electrical motor 8, and electrical motor 8 is fixed on the outside of conveying pipeline 1.End near electrical motor 8 on the conveying pipeline 1 radially connects a stable-pressure device 9, and stable-pressure device 9 can make pressure and the external atmosphere pressure in the conveying pipeline 1 keep basically identical, thereby realizes stable material-supplying.
One end of airduct 2 radially connects material blanking tube 6, and the another port connects a blowing engine 10.The latter half of material blanking tube 6 is oblique to be connected in the airduct 2, makes to form an included angle A between the latter half of material blanking tube 6 and the airduct 2, and this included angle A is greater than the slope angle of repose of coal dust, and operated by rotary motion is between 30 °~60 °.Be provided with a Venturi tube structure 11 with material blanking tube 6 junctions in airduct 2, its effect is to make coal dust after passing through Venturi tube structure 11, and it is more even to produce coal.Also be provided with a control cock 12 on the airduct 2, its effect is the wind supply quantity of regulating as required in the airduct 2, and in the present embodiment, what control cock 12 adopted is Electric air valve.
The utility model radially connects the discharging opening of coal dust warehouse 4 with the inlet point 3 of conveying pipeline 1 in use, and the outlet of airduct 2 is connected the burning installation of boiler.In the utility model when operation,, under the drive of electrical motor 8, feed spiral 7 rotations in the conveying pipeline 1 will be advanced coal dust in the conveying pipeline 1 by 5 inputs of coal dust warehouse, constantly deliver to the end of conveying pipeline 1, and fall in the material blanking tube 6.At this moment, because blowing engine 10 is blown by airduct 2, the coal dust that therefore falls into material blanking tube 6 falls under deadweight on the one hand, the drainage that is subjected to blast simultaneously falls, and enter in the Venturi tube structure 11, in airduct 2, under the wind effect, be delivered in the burning installation of boiler then.
The utility model only describes with the foregoing description; the structure of each parts, the position is set and connects and all can change to some extent; on the basis of technical solutions of the utility model; all improvement and equivalents of individual component being carried out according to the utility model principle all should not got rid of outside protection domain of the present utility model.

Claims (3)

1. pulse-free coal powder supply device is characterized in that: it comprises that a horizontally disposed conveying pipeline and is horizontally set on the airduct of described conveying pipeline below;
The closed at both ends of described conveying pipeline, its upside near an end has an inlet point, and the downside of the close other end has a discharging opening; Described inlet point radially connects a storage bin, and described discharging opening radially connects a material blanking tube; The first half of described material blanking tube is vertical, and the latter half tilts towards the described conveying pipeline outside; Be provided with a feed spiral in the described conveying pipeline, an end of the close described discharging opening of described feed spiral connects the mouth of an electrical motor, and described electrical motor is fixed on the outside of described conveying pipeline; End near described electrical motor on the described conveying pipeline radially connects a stable-pressure device;
One end of described airduct radially connects described material blanking tube, and the another port connects a blowing engine; The latter half of described material blanking tube is oblique to be connected in the described airduct, makes and forms an angle between the latter half of described material blanking tube and the described airduct; In described airduct, be provided with a Venturi tube structure with described material blanking tube junction; Also be provided with a control cock on the described airduct.
2. a kind of pulse-free coal powder supply device as claimed in claim 1 is characterized in that: the angle between the latter half of described material blanking tube and the described airduct is arranged between 30 °~60 °.
3. a kind of pulse-free coal powder supply device as claimed in claim 1 or 2 is characterized in that: described control cock adopts Electric air valve.
CN2009201089002U 2009-06-10 2009-06-10 Pulseless coal powder feeding device Expired - Lifetime CN201458346U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009201089002U CN201458346U (en) 2009-06-10 2009-06-10 Pulseless coal powder feeding device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009201089002U CN201458346U (en) 2009-06-10 2009-06-10 Pulseless coal powder feeding device

Publications (1)

Publication Number Publication Date
CN201458346U true CN201458346U (en) 2010-05-12

Family

ID=42385700

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009201089002U Expired - Lifetime CN201458346U (en) 2009-06-10 2009-06-10 Pulseless coal powder feeding device

Country Status (1)

Country Link
CN (1) CN201458346U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103343975A (en) * 2013-07-25 2013-10-09 高伦 Feeding machine
CN103994452A (en) * 2014-05-30 2014-08-20 聊城华诚环保设备科技有限公司 Coal additive conveying and spraying unit
CN104064103A (en) * 2014-06-26 2014-09-24 中国石油大学(华东) Sand adding device for foam pipe flow and sand adding method thereof
CN104555437A (en) * 2013-10-20 2015-04-29 宁夏嘉翔自控技术有限公司 Pneumatic conveying system for soybeans
CN105066163A (en) * 2015-08-31 2015-11-18 衡阳市大成锅炉有限公司 Boiler feeding system
CN106144445A (en) * 2016-08-26 2016-11-23 成都巨龙生物科技股份有限公司 One spreads bent machine automatically
CN106196139A (en) * 2016-08-29 2016-12-07 江苏双良锅炉有限公司 A kind of coal dust feeding system with swinging conveying pipe
CN106185368A (en) * 2016-08-29 2016-12-07 江苏双良锅炉有限公司 A kind of coal dust feeding device
CN110844627A (en) * 2019-11-18 2020-02-28 淮南亿万达集团有限责任公司 Ceramsite roasting fuel storage and conveying system

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103343975A (en) * 2013-07-25 2013-10-09 高伦 Feeding machine
CN103343975B (en) * 2013-07-25 2016-08-10 高伦 Feeding machine
CN104555437A (en) * 2013-10-20 2015-04-29 宁夏嘉翔自控技术有限公司 Pneumatic conveying system for soybeans
CN103994452A (en) * 2014-05-30 2014-08-20 聊城华诚环保设备科技有限公司 Coal additive conveying and spraying unit
CN104064103A (en) * 2014-06-26 2014-09-24 中国石油大学(华东) Sand adding device for foam pipe flow and sand adding method thereof
CN104064103B (en) * 2014-06-26 2016-05-11 中国石油大学(华东) A kind of sanding device for foamed pipe stream and add sand method
CN105066163A (en) * 2015-08-31 2015-11-18 衡阳市大成锅炉有限公司 Boiler feeding system
CN106144445A (en) * 2016-08-26 2016-11-23 成都巨龙生物科技股份有限公司 One spreads bent machine automatically
CN106196139A (en) * 2016-08-29 2016-12-07 江苏双良锅炉有限公司 A kind of coal dust feeding system with swinging conveying pipe
CN106185368A (en) * 2016-08-29 2016-12-07 江苏双良锅炉有限公司 A kind of coal dust feeding device
CN106185368B (en) * 2016-08-29 2018-12-25 江苏双良锅炉有限公司 A kind of coal dust feeding device
CN110844627A (en) * 2019-11-18 2020-02-28 淮南亿万达集团有限责任公司 Ceramsite roasting fuel storage and conveying system

Similar Documents

Publication Publication Date Title
CN201458346U (en) Pulseless coal powder feeding device
CN101575053A (en) Pulse-free coal powder supply device
CN201458374U (en) Combined coal powder storage and supply system
CN201284147Y (en) Ashes negative pressure pneumatic conveying apparatus
CN205061006U (en) PVC for board powder store storehouse
CN2771668Y (en) Uniformly coal-ash feeding apparatus
CN106516753A (en) Storehouse pump ash conveying device
CN202532519U (en) Biomass material plugging feeding device
CN103438433B (en) Biomass particle burner of cylinder-type feeding system
CN206407636U (en) Blow tank conveying device
CN203431832U (en) Biomass pellet combustion machine of cylindrical type feeding system
CN201925944U (en) Feeding device using powdered fuel boiler
CN203512771U (en) Lean-phase positive-pressure conveying device
CN203333483U (en) Cement pulverized coal preparation system
CN207404530U (en) A kind of full eccentrice type turns round blanking airlock
CN207046491U (en) A kind of stone flour air transporting arrangement
CN202784856U (en) Power air trough conveyor
CN214494894U (en) Wind-force spiral conveying system
CN2616514Y (en) Powder material conveying apparatus
CN205187360U (en) Material sealing pump
CN202082939U (en) Fly ash conveying mechanism of boiler economizer
CN203784983U (en) Piston type automatic feeding mechanism for bio-mass fuels
CN203695244U (en) Novel coal ash sorting device
CN204665342U (en) A kind of novel automatic firing equipment
CN203512821U (en) Pneumatic bulk loading machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA COAL RESEARCH INSTITUTE CO., LTD.

Free format text: FORMER OWNER: COAL GENERAL ACADEMY

Effective date: 20140902

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20140902

Address after: 100013 Chaoyang District, Hepingli Youth Ditch Road, No. 5, No.

Patentee after: Co., Ltd of coal science and technology academy

Address before: 100013 Chaoyang District, Hepingli Youth Ditch Road, No. 5, No.

Patentee before: General Research Institute of Coal Science

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20170125

Address after: Beijing Caiyu Economic Development Zone 102606 Beijing city Daxing District Long Yu Caiyu Town Street No. 5

Patentee after: Energy saving Technology Co., Ltd.

Address before: 100013 Chaoyang District, Hepingli Youth Ditch Road, No. 5, No.

Patentee before: Co., Ltd of coal science and technology academy

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20100512