CN201433235Y - Emergency stopping device used for gas heating furnace - Google Patents

Emergency stopping device used for gas heating furnace Download PDF

Info

Publication number
CN201433235Y
CN201433235Y CN2009201613638U CN200920161363U CN201433235Y CN 201433235 Y CN201433235 Y CN 201433235Y CN 2009201613638 U CN2009201613638 U CN 2009201613638U CN 200920161363 U CN200920161363 U CN 200920161363U CN 201433235 Y CN201433235 Y CN 201433235Y
Authority
CN
China
Prior art keywords
gas
valve
stopping device
heating furnace
emergency stopping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009201613638U
Other languages
Chinese (zh)
Inventor
李雪龙
曹晓岭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinjiang Bayi Iron and Steel Co Ltd
Original Assignee
Xinjiang Bayi Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinjiang Bayi Iron and Steel Co Ltd filed Critical Xinjiang Bayi Iron and Steel Co Ltd
Priority to CN2009201613638U priority Critical patent/CN201433235Y/en
Application granted granted Critical
Publication of CN201433235Y publication Critical patent/CN201433235Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Feeding And Controlling Fuel (AREA)

Abstract

The utility model discloses an emergency stopping device used for a gas heating furnace, which comprises a gas delivery pipe, wherein the gas delivery pipe is provided with a rapid cut-off valve; therapid cut-off valve is connected with at least one gas delivery branch pipe; and the gas delivery branch pipes are respectively provided with a gas adjusting valve. The emergency stopping device is also provided with a gas storage tank; and the gas storage tank is connected with pipelines at the outlet ends of all gas adjusting valves respectively by low-pressure nitrogen purging pipes provided with solenoid valves. The emergency stopping device can rapidly realize emergency stop of the gas heating furnace so as to guarantee human safety.

Description

A kind of gas-fired furnace is with urgent blowing out device
Technical field
The utility model relates to a kind of gas-fired furnace with urgent blowing out device.
Background technology
The fuel that the plate of moderate thickness pusher-type furnace uses is mixed gas, in use run into power failure, cut off the water, need urgent blowing out under the blowing-out machine situation, need operator to reach the spot rapidly during blowing out and close burner, if above-mentioned situation occurs in night or operator react untimely sky, gaspipe line tempering, blast, the gas leak of just causing probably, can cause casualties when serious.
The utility model content
The purpose of this utility model is to provide a kind of gas-fired furnace with urgent blowing out device, can fast and effeciently realize the blowing out operation, guarantees personnel safety.
The purpose of this utility model is achieved in that a kind of gas-fired furnace is with urgent blowing out device, comprise gas conveying tube, repid cut-off valve is installed on gas conveying tube, and repid cut-off valve is connecting at least one coal gas and is carrying arm, and coal gas is carried on the arm gas regulator is installed respectively; This device also is provided with a gas-holder, and gas-holder links to each other with the pipeline of each gas regulator exit end by the low-pressure nitrogen scavenging duct that magnetic valve is housed respectively.
Repid cut-off valve is set on gas conveying tube, nitrogen purging interface (solenoid control) is set behind each branch road gas regulator, be lower than 3000pa when gas main pressure occurring, air pressure is lower than 4000pa, when instrument air pressure is lower than the wherein any situation of 0.3MPa, process furnace will carry out urgent blowing out: the repid cut-off valve on the gas conveying tube and the gas regulator of each branch road are closed simultaneously, meanwhile the magnetic valve behind the branch road gas regulator is opened automatically in gas line and is charged into low-pressure nitrogen, coal gas to the gaspipe line between the burner behind the branch road gas regulator is cemented out, burner extinguishes, and nitrogen purging will be closed in 10 minutes automatically.The utility model has been realized the blowing out operation of Long-distance Control fully, need not artificial scene and closes burner, guarantees personnel safety.
Description of drawings
The utility model is described in further detail below in conjunction with accompanying drawing.
Accompanying drawing is a syndeton synoptic diagram of the present utility model.
Embodiment
A kind of gas-fired furnace is with urgent blowing out device, as shown in drawings, comprise gas conveying tube 7, repid cut-off valve 8 is installed on gas conveying tube 7, repid cut-off valve 8 is connecting at least one coal gas and is carrying arm 9, and coal gas is carried on the arm 9 gas regulator 2 is installed respectively; This device also is provided with a gas-holder 1, and gas-holder 1 links to each other with the pipeline of each gas regulator 2 exit end by the low-pressure nitrogen scavenging duct 5 that magnetic valve 3 is housed respectively.Gas-holder 1 internal memory is placed with low-pressure nitrogen, when gas main pressure is lower than set(ting)value, repid cut-off valve 8 and gas regulator 2 are closed simultaneously, and at this moment, magnetic valve 3 is opened, low-pressure nitrogen in the gas-holder 1 is entered in the exit end pipeline at gas regulator 2 rear portions, wherein remaining coal gas is replaced, burner is extinguished, and need not manually to carry out site work, improve working efficiency and automatic control level greatly, eliminated the generation of human casualty accident.
Bypass is being provided with the arm 6 that stopcock 4 is housed respectively on the pipeline that magnetic valve 3 is installed.In order to when magnetic valve 3 breaks down, to use, guarantee system's works better as the backup pipeline.

Claims (2)

1, a kind of gas-fired furnace is with urgent blowing out device, comprise gas conveying tube, it is characterized in that: repid cut-off valve is installed on gas conveying tube, and repid cut-off valve is connecting at least one coal gas and is carrying arm, and coal gas is carried on the arm gas regulator is installed respectively; This device also is provided with a gas-holder, and gas-holder links to each other with the pipeline of each gas regulator exit end by the low-pressure nitrogen scavenging duct that magnetic valve is housed respectively.
2, gas-fired furnace according to claim 1 is characterized in that with urgent blowing out device: bypass is being provided with the arm that stopcock is housed being equipped with on the pipeline of magnetic valve respectively.
CN2009201613638U 2009-07-16 2009-07-16 Emergency stopping device used for gas heating furnace Expired - Fee Related CN201433235Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009201613638U CN201433235Y (en) 2009-07-16 2009-07-16 Emergency stopping device used for gas heating furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009201613638U CN201433235Y (en) 2009-07-16 2009-07-16 Emergency stopping device used for gas heating furnace

Publications (1)

Publication Number Publication Date
CN201433235Y true CN201433235Y (en) 2010-03-31

Family

ID=42052046

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009201613638U Expired - Fee Related CN201433235Y (en) 2009-07-16 2009-07-16 Emergency stopping device used for gas heating furnace

Country Status (1)

Country Link
CN (1) CN201433235Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103710524A (en) * 2014-01-06 2014-04-09 鞍钢股份有限公司 Ignition method of continuous annealing furnace

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103710524A (en) * 2014-01-06 2014-04-09 鞍钢股份有限公司 Ignition method of continuous annealing furnace

Similar Documents

Publication Publication Date Title
CN201433236Y (en) Emergency shut-down and automatic purging device for gas-fired furnace
CN112460635B (en) Air-entraining purging method for dual-fuel gas turbine
CN217382542U (en) Automatic purging and replacing system for hydrogen filling
CN113739581A (en) Vehicle-mounted hydrogen supply method and equipment for blast furnace or shaft furnace hydrogen-rich smelting
CN201433235Y (en) Emergency stopping device used for gas heating furnace
CN104854249B (en) It is blown into equipment and the method for operating blast furnace of oxygen from blast-furnace tuyere
CN102344980A (en) Air dispensation control system for blower system of blast furnace in metallurgical enterprise
CN115652001A (en) Blast furnace top pressure-equalizing gas recovery system and recovery method thereof
CN202297637U (en) Control device for realizing mutual air distribution during operation of air supply systems of different blast furnaces
RU2500926C2 (en) Control system of process gas losses of gas-dynamic seals
CN211344795U (en) Liquid ethane pipeline valve chamber relief system
CN205480999U (en) Dual -purpose combustor system of asphalt mixing station oil gas
CN211199258U (en) Blast furnace top charging bucket pressure-equalizing coal gas full-recovery system
CN210511034U (en) CNG gas storage well CNG recovery system
CN218443348U (en) High-pressure oxygen enrichment device for carbon emission reduction of lime kiln of steel plant
CN218158257U (en) Hydrogen supply system for fuel cell test
CN210624172U (en) Heating furnace gas pipe network system
CN220081516U (en) Dual-fuel gas turbine blowing system
CN111059471B (en) Liquid ethane pipeline valve chamber relief system and method
CN114893714B (en) Single-metering 35MPa and 70MPa double-gun hydrogen filling system and control method thereof
CN102344978A (en) System for realizing control of mutual air dispensation in operation process of air supply systems of different blast furnaces
CN102344979A (en) Air dispensation control system for blower system of blast furnace in metallurgical enterprise
CN202297647U (en) Air dispensation control device for supplying air to two-seat blast furnace
CN212319409U (en) Rich hydrogen conveying system of propane dehydrogenation device
CN220132259U (en) Steelmaking converter gas recovery device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100331

Termination date: 20120716