CN201425876Y - Anti-interference intermediate transformer for partial discharge test of dry power transformer - Google Patents

Anti-interference intermediate transformer for partial discharge test of dry power transformer Download PDF

Info

Publication number
CN201425876Y
CN201425876Y CN2009200711084U CN200920071108U CN201425876Y CN 201425876 Y CN201425876 Y CN 201425876Y CN 2009200711084 U CN2009200711084 U CN 2009200711084U CN 200920071108 U CN200920071108 U CN 200920071108U CN 201425876 Y CN201425876 Y CN 201425876Y
Authority
CN
China
Prior art keywords
transformer
winding
discharge test
interference
dry
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009200711084U
Other languages
Chinese (zh)
Inventor
邱永椿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Jiulong electric equipment experiment Co., Ltd.
Shanghai Jiulong Electric Power Group Co Ltd
Original Assignee
SHANGHAI JIULONG ELECTRIC EQUIPMENT EXPERIMENT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI JIULONG ELECTRIC EQUIPMENT EXPERIMENT CO Ltd filed Critical SHANGHAI JIULONG ELECTRIC EQUIPMENT EXPERIMENT CO Ltd
Priority to CN2009200711084U priority Critical patent/CN201425876Y/en
Application granted granted Critical
Publication of CN201425876Y publication Critical patent/CN201425876Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Testing Relating To Insulation (AREA)

Abstract

The utility model relates to an anti-interference intermediate transformer for the partial discharge test of a dry power transformer, comprising a first winding, a second winding and a separating layer. The separating layer is arranged between the first winding and the second winding. Compared with the prior art, the utility model has simple structure and easy use, and can decrease the test interference to an allowable range.

Description

The anti-interference intermediate transformer of dry-type power transformer partial portion discharge test
Technical field
The utility model relates to intermediate transformer, particularly relates to the anti-interference intermediate transformer of a kind of dry-type power transformer partial portion's discharge test.
Background technology
In recent years, dry-type power transformer is widely adopted in electric power system and customer substation as novel electric power equipment.
The dry-type power transformer of solid insulation has advantages such as compact conformation, no greasy dirt, favourable fire prevention, but the often easier technological local defect of hiding of solid cast-type insulation, as pore and impurity is example etc., the partial discharge of these weak links may cause perfoliate dielectric breakdown and damage equipment produces fatal harm.
The partial discharge test is effective detection means of insulation local defect.Therefore, to solid insulation instrument transformer of 35kV etc., partial discharge test is already as the gainer in the field test.Yet the solid insulation power transformer then because of considering the restriction of experimental condition, is not carried out the field test of partial discharge in the past, judge transformer insulated local defect situation, be unfavorable in time finding and removing a hidden danger thereby can not detect fully and effectively.Must do when for this reason, Shanghai Power Company join to the 35kV dry-type transformer in the Q/SDJ1011-2004 of new promulgation " power equipment handing-over and preventive trial rules " local discharge to have done clearly stipulate (the 6.1st 17 sections).
But, present dry-type power transformer carries out partial discharge test at the scene and does not also satisfy the requirements, reason: 1) transformer in many transformer stations is installed in floor or subterranean layer, and existing local discharge test device and power supply equipment are very huge, can't reach the testing ground; 2) site environment is poor, interference is big.
Because field condition is limit, be the three-phase intermediate frequency generator that the operating weight volume is not bigger, use on-the-spot construction power supply test can only adopt single-phase pressurization, through intermediate transformer test specimen is applied test voltage by supply unit, but present intermediate transformer can not effective isolation be constructed power supply for the interference of testing.
Summary of the invention
Technical problem to be solved in the utility model is exactly to provide a kind of dry-type power transformer partial portion's discharge test anti-interference intermediate transformer for the defective that overcomes above-mentioned prior art existence.
The purpose of this utility model can be achieved through the following technical solutions: the anti-interference intermediate transformer of dry-type power transformer partial portion discharge test, comprise first winding and second winding, it is characterized in that, also comprise separator, described separator is located between first winding and second winding.
Described separator is a copper foil, an end ground connection of this copper foil.
The utility model also comprises a filter reactance, and this reactance links to each other with the input of first winding.
Compared with prior art, the utility model is simple in structure, easy to use, and the test interference can be reduced in the scope of permission.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
As shown in Figure 1,
The anti-interference intermediate transformer of dry-type power transformer partial portion discharge test comprises the first winding I and the second winding II, it is characterized in that, also comprises separator III, and described separator III is located between the first winding I and the second winding II.
Described separator III is a copper foil, an end ground connection of this copper foil; The utility model also comprises a filter reactance R, and this reactance R links to each other with the input of the first winding I.
For effectively isolating the interference of construction power supply for test, the utility model increases screen between the high and low pressure coil of intermediate transformer (usefulness of boosting), can suppress to conduct to the high-pressure side from the interference of variable frequency power supply.
Insert a reactance at the intermediate transformer high-voltage output end, high-frequency interferencing signal is played inhibitory action,, variable frequency power supply is shielded if the high-pressure side flashover takes place or puncture to produce the high-frequency sasser invasion in process of the test.

Claims (3)

1. the anti-interference intermediate transformer of dry-type power transformer partial portion discharge test comprises first winding and second winding, it is characterized in that, also comprises separator, and described separator is located between first winding and second winding.
2. the anti-interference intermediate transformer of dry-type power transformer partial portion's discharge test according to claim 1 is characterized in that described separator is a copper foil, an end ground connection of this copper foil.
3. the anti-interference intermediate transformer of dry-type power transformer partial portion's discharge test according to claim 1 and 2 is characterized in that also comprise a filter reactance, this reactance links to each other with the input of first winding.
CN2009200711084U 2009-04-24 2009-04-24 Anti-interference intermediate transformer for partial discharge test of dry power transformer Expired - Fee Related CN201425876Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009200711084U CN201425876Y (en) 2009-04-24 2009-04-24 Anti-interference intermediate transformer for partial discharge test of dry power transformer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009200711084U CN201425876Y (en) 2009-04-24 2009-04-24 Anti-interference intermediate transformer for partial discharge test of dry power transformer

Publications (1)

Publication Number Publication Date
CN201425876Y true CN201425876Y (en) 2010-03-17

Family

ID=42025331

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009200711084U Expired - Fee Related CN201425876Y (en) 2009-04-24 2009-04-24 Anti-interference intermediate transformer for partial discharge test of dry power transformer

Country Status (1)

Country Link
CN (1) CN201425876Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111505470A (en) * 2020-06-19 2020-08-07 国网北京市电力公司 High-power supply filter in partial discharge test

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111505470A (en) * 2020-06-19 2020-08-07 国网北京市电力公司 High-power supply filter in partial discharge test
CN111505470B (en) * 2020-06-19 2022-03-01 国网北京市电力公司 High-power supply filter in partial discharge test

Similar Documents

Publication Publication Date Title
CN102565647B (en) GIS (Global Information System) withstand voltage testing system
CN105445629A (en) AC voltage withstand test method for 500kV GIS
CN106443431A (en) Test loop and method for super/extra-high voltage circuit breaker opening and closing paralleling reactor load
CN104062526A (en) Oil-oil bushing cable outlet transformer test method without head removing
Jacob et al. On-line monitoring of partial discharges in a HVDC station environment
CN205404682U (en) Wireless phase synchronization device
CN112485596B (en) Power distribution network ground fault detection device and method
CN110824346B (en) Power distribution network circuit breaker series resonance voltage withstand device for electric automobile power supply
CN101034125B (en) Resonant experimental device of dry-type power transformer partial discharge detection
CN201402305Y (en) Wiring structure for partial discharge tests of dry-type transformer
CN103513171A (en) Power-frequency voltage-withstand testing equipment and method for composite post insulator
JP2012247309A (en) Partial discharge detection device and partial discharge inspection method for power receiving facility
CN202649391U (en) Cable defect simulation test system
CN201425876Y (en) Anti-interference intermediate transformer for partial discharge test of dry power transformer
CN106771813B (en) A kind of Tesla transformer secondary coil on-off measurement method
CN203551730U (en) A composite post insulator power-frequency voltage-withstand testing device
CN206235706U (en) A kind of high voltage reactor scene partial discharge and overpressure resistance detecting device
CN212622935U (en) Power distribution network circuit breaker series resonance voltage withstand device for power supply of electric automobile
CN201464604U (en) Partial discharge test device for potable dry power transformer
CN104297636B (en) Pole-mounted distribution substation traveling wave detection method
CN206920546U (en) A kind of wiring construction of low-pressure side two-winding transformer partial discharge test
CN205141683U (en) Shunt capacitance organizes integrated equipment
CN206892261U (en) Alternating current withstand voltage test device for overhead line
CN104158163A (en) VFTO protection device and method for transformer in GIS substation
CN109406974A (en) A kind of authentic partial discharge monitoring device of switchgear

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: SHANGHAI JIULONG ELECTRIC POWER (GROUP) CO., LTD.

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20110526

Address after: 407 No. 200040, Lane 1394, Zhongxing Road, Shanghai, room 3

Co-patentee after: Shanghai Jiulong Electric Power (Group) Co., Ltd.

Patentee after: Shanghai Jiulong electric equipment experiment Co., Ltd.

Address before: 407 No. 200040, Lane 1394, Zhongxing Road, Shanghai, room 3

Patentee before: Shanghai Jiulong electric equipment experiment Co., Ltd.

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100317

Termination date: 20140424