CN201420509Y - Pup joint device for feeding upper part of riser pipe under simulation spray method - Google Patents
Pup joint device for feeding upper part of riser pipe under simulation spray method Download PDFInfo
- Publication number
- CN201420509Y CN201420509Y CN2009201092503U CN200920109250U CN201420509Y CN 201420509 Y CN201420509 Y CN 201420509Y CN 2009201092503 U CN2009201092503 U CN 2009201092503U CN 200920109250 U CN200920109250 U CN 200920109250U CN 201420509 Y CN201420509 Y CN 201420509Y
- Authority
- CN
- China
- Prior art keywords
- riser pipe
- butterfly
- steel bar
- pipe
- pup joint
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model provides a pup joint device for feeding upper part of riser pipe under simulation spray method, which is characterized in that the device comprises a center bearing, a plurality of pieces of angle iron, a plurality of support steel bars, an upper rotary baffle and a lower rotary baffle. A pup joint and a drill string penetrate through the middle of the center bearing; the outer side of a vertical steel plate of each piece of angle iron is fixed on the inner side of the riser pipe; the inner side of the vertical steel plate is connected with one end of each support steel bar,and the other end of each support steel bar is connected with the outer lateral wall of the center bearing; the angle iron is distributed on the inner side of the riser pipe in a circumferential manner; and the upper rotary baffle is arranged at the lower part of the support steel bar, and is matched with the lower rotary baffle arranged on the pup joint. With the structure, the pup joint device can also play a role of a centering device at the top part during drilling and realizes the function of centering the upper part of the riser pipe, so that the riser pipe under the spray method can drill in successfully. Besides, the pup joint device can realize automatic assembly and disassembly, thereby avoiding manual operation; and not only the testing requirements are met, but also the operation procedure is simplified, thereby reducing the workload during working and saving the testing expenses to a great extent.
Description
Technical field
The utility model relates to a kind of simulation test device of offshore oil drilling, particularly about a kind of upper feed pipe nipple device of riser pipe under simulated injection method.
Background technology
In the offshore oil drilling exploitation engineering, riser pipe plays important effect, is mainly used in insulating sea water and drilling fluid passage etc. is provided.Because the expense of every mouthful of well of offshore oil exploitation is all very high, therefore in order to improve the success rate that is drilled to every mouthful of well, need in advance the situation on the stressed and stratum of sleeve pipe is analyzed, carry out the simulated test of riser pipe at greater coasting area.
In riser pipe simulated test based on gunite, in order in drilling process, to stablize riser pipe, and prevent the riser pipe lateral tilt and topple over, usually adopt crane to assist and creep into.This operation makes riser pipe not to be lowered to technology to gunite and to produce very big influence, and then to have influenced test effect with boring with down.
Summary of the invention
At the problems referred to above, the purpose of this utility model provides a kind of riser pipe that is used for solving based on gunite and is lowered to process of the test, and the upper feed pipe nipple device of riser pipe under simulated injection method of problem such as is set upright in riser pipe stability and top.
For achieving the above object, the utility model is taked following technical scheme: a kind of upper feed pipe nipple device of riser pipe under simulated injection method is characterized in that: it comprises centre bearing, a plurality of angle steel, a plurality of support steel bar, goes up butterfly and following butterfly; Short drill pipe and drill string pass from the centre of described centre bearing; Described centre bearing is positioned at the centre of upper part of riser pipe; The vertical steel plate outside of described angle steel is fixed on the riser pipe inboard, and inboard connection of vertical steel plate supported steel bar one end; Support the lateral wall that the steel bar other end connects described centre bearing; Described angle steel is circle distribution in described riser pipe inboard; Described upward butterfly is arranged on the bottom of described support steel bar, and is supporting with the following butterfly that is arranged on the described short drill pipe.
The thickness of described upward butterfly is consistent with described support steel bar.
The described length that goes up butterfly is 1/3 of described support steel bar.
The described vertical steel plate outside is fixed by screw thread with described riser pipe inboard.
The number of described upward butterfly and following butterfly is consistent with the number of described angle steel.
The utility model is owing to take above technical scheme, it has the following advantages: 1, top of the present utility model is sent into pipe nipple simulation test device and riser pipe and is buckled by anchoring filament and be connected in one, provide horizontal restraint forces by drill string, make the riser pipe can be in drilling process, thereby solved the problem of riser pipe stability owing to big deflection is not toppled over.2, the utility model also can play the effect of top centralizer by above structure in drilling process, realizes the function that upper part of riser pipe is set upright, and makes that riser pipe is crept into smoothly under the gunite.3, simulation test device of the present utility model bears against the generation moment of torsion mutually owing to the rotation by drill string makes the butterfly and the butterfly on the short drill pipe that support the steel bar bottom, can realize automatic installation and removal, avoided manually-operated, not only satisfy test requirements document but also simplified operation procedure, significantly reduce the workload in the work progress again, saved testing expenses to a great extent.
Description of drawings
Fig. 1 is a device front elevational schematic of the present utility model
Fig. 2 is a device schematic top plan view of the present utility model
Fig. 3 is a short drill pipe front elevational schematic of the present utility model
Fig. 4 is a short drill pipe schematic top plan view of the present utility model
The specific embodiment
Be described in detail of the present utility model below in conjunction with drawings and Examples.
The utility model is sent into the pipe nipple device by installing at upper part of riser pipe, and drill string passes a bearing and is lowered into riser pipe inside.Rotation by drill string afterwards bears against the butterfly of support steel bar bottom and the butterfly on the short drill pipe mutually, and then produces moment of torsion, and the pipe nipple device is sent in drive and drill string rotates synchronously.When rotation synchronously, send into the pipe nipple device and riser pipe fixedly becomes one, play and stablize the double action that riser pipe and top are set upright by fixing screw thread realization.
As shown in Figure 1 and Figure 2, upper part of riser pipe of the present utility model is sent into the pipe nipple device and is comprised: centre bearing 1, angle steel 2, support steel bar 3 and last butterfly 4.Wherein, centre bearing 1 is positioned at upper part of riser pipe and sends into pipe nipple device centre, short drill pipe 5 and drill string 6 pass from the centre of centre bearing 1, and centre bearing 1 does not rotate with the rotation of drill string 6, thereby riser pipe 7 does not rotate with the rotation of drill string 6 yet.Short drill pipe 5 and drill string 6 can move by easy on and off simultaneously, thereby guarantee normally creeping into of drill string 6, and the internal diameter size of centre bearing 1 needs the external diameter greater than short drill pipe 5 and drill string 6.
Angle steel 2 is made up of vertical steel plate 21 and horizontal steel plate 22, and vertical steel plate 21 and horizontal steel plate 22 are " 7 " font setting.The arranged outside of vertical steel plate 21 and the fixedly screw thread 23 that riser pipe 7 is complementary can be fixed with riser pipe 7.Laterally steel plate 22 can be placed on the plane, top of riser pipe 7, plays the effect of stablizing riser pipe 7.A plurality of angle steel 2 evenly distribute, and form a circumference in the upper inner of riser pipe 7.
Support the inboard that steel bar 3 one ends are welded on vertical steel plate 21, the other end is welded on the outer surface of centre bearing 1, is used for that centre bearing 1 is fixed on upper part of riser pipe and sends into pipe nipple device centre.Support steel bar 3 bottoms and install butterfly 4, with the following butterfly 8 supporting settings that are arranged on the short drill pipe 5.When the installation upper part of riser pipe was sent into the pipe nipple device, last butterfly 4 and following butterfly 8 bore against mutually, produced moment of torsion by drill string 5 forwards and reverse rotation, and the realization upper part of riser pipe is sent into the automatic installation and removal of pipe nipple device.
As shown in Figure 3, Figure 4, short drill pipe 5 of the present utility model comprises butterfly 8, female joint 9, main body 10 and male joint 11 down.Following butterfly 8 is arranged on the relevant position at main body 10 middle parts.
Among the embodiment of the present utility model, the number of angle steel 2 is 4, and in the inboard circular layout of riser pipe 7, angle is 90 ° between adjacent two angle steel 2.The number of last butterfly 4 and following butterfly 8 is consistent with the number of angle steel 2.The thickness of last butterfly 4 and the consistency of thickness that supports steel bar 3, length are about 1/3 of support steel bar 3.The length of short drill pipe 5 is about 50cm, the size of the following butterfly 8 on it and last butterfly 4 couplings.
Upper part of riser pipe of the present utility model is sent into the pipe nipple Unit Installation and demounting procedure comprises:
1, upper part of riser pipe is sent into the pipe nipple Unit Installation:
1) short drill pipe 5 is inserted in the drill string assembly.
2) upper part of riser pipe is sent into the pipe nipple device and be installed on the drill string assembly, make short drill pipe 5 pass centre bearing 1.
3) upper part of riser pipe is sent into pipe nipple device and drill string assembly and from up to down be inserted in riser pipe 7, butterfly 4 and following butterfly 8 are born against mutually.
4) start rig, drill string assembly is rotated in the forward, because the effect that bears against between last butterfly 4 and the following butterfly 8, can make upper part of riser pipe send into the pipe nipple device, and firmly link together with the fixedly screw thread 23 of riser pipe 7 by vertical steel plate 21 outsides along with short drill pipe 5 is rotated in the forward.
5) stop rig then and rotate, vertically be lowered to drill string assembly, butterfly 4 and following butterfly 8 are broken away from; Start rig once more, normally creep into, realized that upper part of riser pipe sends into the pipe nipple Unit Installation.
2, upper part of riser pipe is sent into the dismounting of pipe nipple device:
I) to send into the process that removes and installs of pipe nipple device similar for upper part of riser pipe, when riser pipe 7 is lowered into desired depth, finishes when creeping into, and the bottom drill string combination is vertically mentioned.
II) when mentioning short drill pipe 5 positions of containing following butterfly 8 in the drill string assembly, the position of butterfly 4 and following butterfly 8 bears against it mutually in the adjustment.
III) start rig, make the drill string assembly reverse rotation, and the drive upper part of riser pipe is sent into the reverse rotation thereupon of pipe nipple device.The fixedly screw thread 7 that vertical steel plate 21 and riser pipe are 7 is slowly untied, and has realized that upper part of riser pipe sends into the dismounting of pipe nipple device.
Claims (7)
1, a kind of upper feed pipe nipple device of riser pipe under simulated injection method is characterized in that: it comprises centre bearing, a plurality of angle steel, a plurality of support steel bar, goes up butterfly and following butterfly; Short drill pipe and drill string pass from the centre of described centre bearing; Described centre bearing is positioned at the centre of upper part of riser pipe; The vertical steel plate outside of described angle steel is fixed on the riser pipe inboard, and inboard connection of vertical steel plate supported steel bar one end; Support the lateral wall that the steel bar other end connects described centre bearing; Described angle steel is circle distribution in described riser pipe inboard; Described upward butterfly is arranged on the bottom of described support steel bar, and is supporting with the following butterfly that is arranged on the described short drill pipe.
2, a kind of upper feed pipe nipple device of riser pipe under simulated injection method as claimed in claim 1 is characterized in that: the thickness of described upward butterfly is consistent with described support steel bar.
3, a kind of upper feed pipe nipple device of riser pipe under simulated injection method as claimed in claim 1 is characterized in that: the described length that goes up butterfly is 1/3 of described support steel bar.
4, a kind of upper feed pipe nipple device of riser pipe under simulated injection method as claimed in claim 2 is characterized in that: the described length that goes up butterfly is 1/3 of described support steel bar.
5, as claim 1 or 2 or 3 or 4 described a kind of upper feed pipe nipple device of riser pipe under simulated injection method, it is characterized in that: the described vertical steel plate outside is fixed by screw thread with described riser pipe inboard.
6, as claim 1 or 2 or 3 or 4 described a kind of upper feed pipe nipple device of riser pipe under simulated injection method, it is characterized in that: the number of described upward butterfly and following butterfly is consistent with the number of described angle steel.
7, a kind of upper feed pipe nipple device of riser pipe under simulated injection method as claimed in claim 5 is characterized in that: the number of described upward butterfly and following butterfly is consistent with the number of described angle steel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009201092503U CN201420509Y (en) | 2009-06-19 | 2009-06-19 | Pup joint device for feeding upper part of riser pipe under simulation spray method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009201092503U CN201420509Y (en) | 2009-06-19 | 2009-06-19 | Pup joint device for feeding upper part of riser pipe under simulation spray method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201420509Y true CN201420509Y (en) | 2010-03-10 |
Family
ID=41807161
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009201092503U Expired - Lifetime CN201420509Y (en) | 2009-06-19 | 2009-06-19 | Pup joint device for feeding upper part of riser pipe under simulation spray method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201420509Y (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101942982A (en) * | 2010-09-01 | 2011-01-12 | 中国石油天然气集团公司 | Device for jetting conduit into directly-drilled surface layer of marine deep-water drilling well |
CN101581202B (en) * | 2009-06-19 | 2011-11-09 | 中国海洋石油总公司 | Upper feed pipe nipple device of riser pipe under simulated injection method |
CN109267944A (en) * | 2018-10-24 | 2019-01-25 | 中海石油(中国)有限公司 | A kind of deep water surface conductor pipe device |
CN110043212A (en) * | 2019-05-08 | 2019-07-23 | 中国石油大学(北京) | Assist riser pipe mud extraction device |
-
2009
- 2009-06-19 CN CN2009201092503U patent/CN201420509Y/en not_active Expired - Lifetime
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101581202B (en) * | 2009-06-19 | 2011-11-09 | 中国海洋石油总公司 | Upper feed pipe nipple device of riser pipe under simulated injection method |
CN101942982A (en) * | 2010-09-01 | 2011-01-12 | 中国石油天然气集团公司 | Device for jetting conduit into directly-drilled surface layer of marine deep-water drilling well |
CN109267944A (en) * | 2018-10-24 | 2019-01-25 | 中海石油(中国)有限公司 | A kind of deep water surface conductor pipe device |
CN110043212A (en) * | 2019-05-08 | 2019-07-23 | 中国石油大学(北京) | Assist riser pipe mud extraction device |
CN110043212B (en) * | 2019-05-08 | 2023-10-24 | 中国石油大学(北京) | Auxiliary water-stop conduit mud outlet device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA2802838C (en) | Device and method for stablization of a wellhead, and also use of a suction substructure for support of a wellhead | |
CN201420509Y (en) | Pup joint device for feeding upper part of riser pipe under simulation spray method | |
CN201547397U (en) | Underground natural gas pipeline supporting device | |
CN201705365U (en) | Duct piece structure of shield tunnel through mouth | |
CN106193118A (en) | Open trench tunnel agent structure tall and big side wall one side formwork erection and construction technology thereof | |
CN202117556U (en) | Auger driller for moulding concrete piles with different depth and shapes | |
CN101581202B (en) | Upper feed pipe nipple device of riser pipe under simulated injection method | |
CN208457334U (en) | A kind of concrete prefabricated pipe push pipe coaster | |
CN213358594U (en) | Constructional engineering pile | |
CN105697018A (en) | Shaft excavation construction technology | |
CN208594878U (en) | Oil-water well well head jacks erection device | |
CN102926654B (en) | Stake holes ring cutting system and stake holes ring cutting method | |
CN205805416U (en) | A kind of double belt drilling pile drills with high verticality | |
CN202073098U (en) | Anti-deflection pipe thread connector flow guiding device | |
CN201217796Y (en) | Split type liftable shaft mouth operating bench | |
CN202509486U (en) | Elevation control device for installing reinforcement cage of cast-in-situ bored pile | |
CN204511327U (en) | The anti-eccentric drill bit structure of tunnel anchoring boring | |
CN212612447U (en) | Double-barrelled slip casting stock structure | |
KR20120031405A (en) | Drill ship with auxiliary structure | |
CN208347749U (en) | A kind of wall casing propulsive mechanism | |
CN208184676U (en) | The enhanced guide-tube structure of axial stability | |
CN202937179U (en) | Pile hole circular cutting system | |
CN205908258U (en) | Pneumatic post drill | |
CN220869450U (en) | Mining combined anchor rod | |
CN105822230B (en) | The rotary digging auxiliary device and rotary drilling rig of rotary drilling rig |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20100310 Effective date of abandoning: 20090619 |