CN201416950Y - Electric heating equipment - Google Patents

Electric heating equipment Download PDF

Info

Publication number
CN201416950Y
CN201416950Y CN2009201004555U CN200920100455U CN201416950Y CN 201416950 Y CN201416950 Y CN 201416950Y CN 2009201004555 U CN2009201004555 U CN 2009201004555U CN 200920100455 U CN200920100455 U CN 200920100455U CN 201416950 Y CN201416950 Y CN 201416950Y
Authority
CN
China
Prior art keywords
control panel
heating
electric heating
equipment body
equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009201004555U
Other languages
Chinese (zh)
Inventor
张志华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2009201004555U priority Critical patent/CN201416950Y/en
Application granted granted Critical
Publication of CN201416950Y publication Critical patent/CN201416950Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Steam Or Hot-Water Central Heating Systems (AREA)

Abstract

An electric heating equipment adopts the following structure: a control panel (1) is arranged on the surface of an equipment main body (2), a power switch (12) is arranged on the control panel (1), acontrol system (3) is arranged inside the equipment main body (2), the control panel (1) is connected with the control system (3), a heating water outlet (4) is arranged at the upper end of the rightside surface of the equipment main body (2), and a heating water return port (5) is arranged at the lower end of the right side surface of the equipment main body (2). The electric heating equipment takes soil as the cold and heat source for reradiating heat or absorbing heat, thereby consuming no water resources and causing no contamination; moreover, the construction space is saved, the appearance of buildings is beautified, the operation is safe and stable, and the reliability is high.

Description

Electric heating equipment
Technical field:
The utility model relates to a kind of energy-efficient system that not only can heat but also can freeze that utilizes underground shallow-layer ground resource, is specifically related to a kind of electric heating equipment.
Background technology:
" green ", " ecology " have become social tag line in recent years, and the green living theory has obtained more and more common people's approval, and people begin to yearn for the life of relaxation and happiness ground, work in green building.Green building is closely bound up with " saving energy and reduce the cost " in fact, promote to stipulate in the center " green building assessment sign detailed rules for the implementation " that green building is to save land and outdoor environment, energy-conservation and using energy source, water saving and water resource utilization, material-saving and aspect resultant effects such as material resources utilization, indoor environmental quality and operation management are significantly built in Ministry of Construction development in science and technology.
According to statistics, the in use maximum energy consumption of China's building is heating.Along with the benefit raising on ordinary days of Chinese people people's livelihood running water, environmental consciousness is also strengthened to some extent, when selecting dwelling house energy conservation and environment protection is also being improved gradually.
It is 1 coal, 2 electricity, 3 gas, 4 oil that the energy sorts from low to high by the market price.The coal price lattice are minimum but heating cost that common people handed over is not low, this heat energy utilization rate mainly due to coal is lower, the pipeline thermal losses is bigger, adds boiler, pipeline operation and maintenance cost, labour cost, the electricity charge etc., spread out at last common people on one's body every square metre expense just feel higher.Coal heats to bring to the city and also causes very big pollution warm the time in addition, produces large quantity of exhaust gas, waste water, waste residue, has taken a large amount of valuable soils.Break the prohibition against taking life to the arcola below 10 tons one after another and do central heating in now a lot of cities.The energy resource structure of heating also turns to clean energy resourcies such as electric energy, wind energy, solar energy, natural gas from coal.
The utility model content:
The purpose of this utility model provides a kind of electric heating equipment, and it can be Cooling and Heat Source with soil, emits heat or absorbs heat to it, and consume water resources can not pollute it; Saved facilities such as boiler room and attached coal yard, oil storage room, cooling tower, machine room area is significantly smaller than the conventional air-conditioning system, saves space, and what also help building is attractive in appearance.Security of operation is stable, the reliability height; Can heat, freeze, a cover system can replace original boiler to add two covering devices or the system of refrigeration machine, can be applicable to buildings such as hotel, market, office building, school, is more suitable for heating, cooling in dwelling house.
In order to solve the existing problem of background technology, the utility model is by the following technical solutions: it is made up of control panel 1, equipment body 2, control system 3, heating delivery port 4, heating water return mouth 5 and power switch 12, control panel 1 is arranged on equipment body 2 surfaces, power switch 12 is arranged on the control panel 1, control system 3 is arranged on equipment body 2 inside, control panel 1 is connected with control system 3, heating delivery port 4 is arranged on the right flank upper end of equipment body 2, and heating water return mouth 5 is arranged on the right flank lower end of equipment body 2.
Described control system 3 is made up of evaporimeter 3-1, compressor 3-2, condenser 3-3 and throttle mechanism 3-4, evaporimeter 3-1 is connected with compressor 3-2, compressor 3-2 is connected with condenser 3-3, and condenser 3-3 is connected with throttle mechanism 3-4, and throttle mechanism 3-4 is connected with evaporimeter 3-1.
Described evaporimeter 3-1 adopts two screw thread internally finned tubes, and condenser 3-3 is the outer ribbed pipe of whole inside groove; Its heat exchange efficiency improves 15%-30% than like product, so the compact conformation volume is little, and is in light weight.
The utility model wants level firmly to place when installing, and expansion tank 10 must be set, and expansion tank 10 must communicate with atmosphere, expansion tank 10 with do not allow to be provided with valve between stove is connected, guarantee that all the time stove water communicates with atmosphere; Draw temperature sensor and be set to the suitable place of temperature-sensitive.
The utility model can be Cooling and Heat Source with soil, emits heat or absorbs heat to it, and consume water resources can not pollute it; Saved facilities such as boiler room and attached coal yard, oil storage room, cooling tower, machine room area is significantly smaller than the conventional air-conditioning system, saves space, and what also help building is attractive in appearance.Security of operation is stable, the reliability height; Can heat, freeze, a cover system can replace original boiler to add two covering devices or the system of refrigeration machine, can be applicable to buildings such as hotel, market, office building, school, is more suitable for heating, cooling in dwelling house.
Description of drawings:
Fig. 1 is a structural representation of the present utility model, Fig. 2 is the structural representation of control system 3 in the utility model, Fig. 3 is a scheme of installation of the present utility model, Fig. 4 is the structural representation of the specific embodiment two, Fig. 5 is the structural representation of the specific embodiment three, Fig. 6 is the structural representation of the specific embodiment four, and Fig. 7 is the structure schematic diagram of Fig. 6.
The specific embodiment:
The specific embodiment one: with reference to Fig. 1-3, this specific embodiment is by the following technical solutions: it is made up of control panel 1, equipment body 2, control system 3, heating delivery port 4, heating water return mouth 5 and power switch 12, control panel 1 is arranged on equipment body 2 surfaces, power switch 12 is arranged on the control panel 1, control system 3 is arranged on equipment body 2 inside, control panel 1 is connected with control system 3, heating delivery port 4 is arranged on the right flank upper end of equipment body 2, and heating water return mouth 5 is arranged on the right flank lower end of equipment body 2.
Described control system 3 is made up of evaporimeter 3-1, compressor 3-2, condenser 3-3 and throttle mechanism 3-4, evaporimeter 3-1 is connected with compressor 3-2, compressor 3-2 is connected with condenser 3-3, and condenser 3-3 is connected with throttle mechanism 3-4, and throttle mechanism 3-4 is connected with evaporimeter 3-1.
Described evaporimeter 3-1 adopts two screw thread internally finned tubes, and condenser 3-3 is the outer ribbed pipe of whole inside groove; Its heat exchange efficiency improves 15%-30% than like product, so the compact conformation volume is little, and is in light weight.
This specific embodiment wants level firmly to place when installing, and expansion tank 10 must be set, and expansion tank 10 must communicate with atmosphere, expansion tank 10 with do not allow to be provided with valve between stove is connected, guarantee that all the time stove water communicates with atmosphere; Draw temperature sensor and be set to the suitable place of temperature-sensitive.
This specific embodiment can be Cooling and Heat Source with soil, emits heat or absorbs heat to it, and consume water resources can not pollute it; Saved facilities such as boiler room and attached coal yard, oil storage room, cooling tower, machine room area is significantly smaller than the conventional air-conditioning system, saves space, and what also help building is attractive in appearance.Security of operation is stable, the reliability height; Can heat, freeze, a cover system can replace original boiler to add two covering devices or the system of refrigeration machine, can be applicable to buildings such as hotel, market, office building, school, is more suitable for heating, cooling in dwelling house.
The specific embodiment two: with reference to Fig. 4, this specific embodiment is with the difference of the specific embodiment one: it also is provided with safety valve 6, and safety valve 6 is arranged on the right flank centre position of equipment body 2.Other compositions are identical with the specific embodiment one with annexation.
The specific embodiment three: with reference to Fig. 5, this specific embodiment is with the difference of the specific embodiment two: it also is provided with air bleeding valve 7, is connected four-way 8 and sewage draining exit 9, safety valve 6 and air bleeding valve 7 be connected four-way 8 and connect, sewage draining exit 9 is arranged on the left surface of equipment body 2.Other compositions are identical with the specific embodiment one with annexation.
The specific embodiment four: with reference to Fig. 6-7, the difference of this concrete specific embodiment and the specific embodiment three is: its heating delivery port 4, heating water return mouth 5, safety valve 6 and sewage draining exit 9 all are arranged on the back side of equipment body 2.Other compositions are identical with the specific embodiment one with annexation.

Claims (3)

1, electric heating equipment, it is characterized in that it is by control panel (1), equipment body (2), control system (3), heating delivery port (4), heating water return mouth (5) and power switch (12) are formed, control panel (1) is arranged on equipment body (2) surface, power switch (12) is arranged on the control panel (1), control system (3) is arranged on equipment body (2) inside, control panel (1) is connected with control system (3), heating delivery port (4) is arranged on the right flank upper end of equipment body (2), and heating water return mouth (5) is arranged on the right flank lower end of equipment body (2).
2, electric heating equipment according to claim 1, it is characterized in that described control system (3) is made up of evaporimeter (3-1), compressor (3-2), condenser (3-3) and throttle mechanism (3-4), evaporimeter (3-1) is connected with compressor (3-2), compressor (3-2) is connected with condenser (3-3), condenser (3-3) is connected with throttle mechanism (3-4), and throttle mechanism (3-4) is connected with evaporimeter (3-1).
3, electric heating equipment according to claim 2 is characterized in that described evaporimeter (3-1) adopts two screw thread internally finned tubes, and condenser (3-3) is the outer ribbed pipe of whole inside groove.
CN2009201004555U 2009-07-24 2009-07-24 Electric heating equipment Expired - Fee Related CN201416950Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009201004555U CN201416950Y (en) 2009-07-24 2009-07-24 Electric heating equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009201004555U CN201416950Y (en) 2009-07-24 2009-07-24 Electric heating equipment

Publications (1)

Publication Number Publication Date
CN201416950Y true CN201416950Y (en) 2010-03-03

Family

ID=41793373

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009201004555U Expired - Fee Related CN201416950Y (en) 2009-07-24 2009-07-24 Electric heating equipment

Country Status (1)

Country Link
CN (1) CN201416950Y (en)

Similar Documents

Publication Publication Date Title
Zhao et al. Energy saving methods and results analysis in the hotel
Cheng et al. Application research on the closed-loop heat-source-tower heat pump air conditioning system in hot-summer and cold-winter zone
CN101192743A (en) Energy-saving transformer substation
CN201463074U (en) Solar heat-storage heating device
CN201416950Y (en) Electric heating equipment
CN204806733U (en) Little magnetism changes in temperature device of solar energy
CN205079376U (en) Be suitable for high -rise building's ground source heat pump system based on cooling tower and solar energy
CN203258777U (en) Efficient temperature-conducting air conditioner board
Li et al. Green Retrofit Survey and Analysis of Public Institution Building in Cold Region
CN201680493U (en) High-temperature Nano electric heating equipment
Jing et al. Current situation and countermeasures of energy-saving buildings in Wuhan City circle
CN202145064U (en) Secondary under-voltage type multifunctional fluid-source ground-source heat pump device
CN201508082U (en) Water source heat pump set
Sun et al. The application of renewable energy in the building energy efficiency
Zhang Analysis of Chinese Passive solar building cases
CN206724378U (en) A kind of energy-saving air conditioning system
Zheng Research on New Digital Energy Utilization in Building Energy Saving and Building Design Based on Information Digitization
Yang et al. General green building energy efficiency
CN201075596Y (en) Energy saving type transforming plant
Guo et al. Reflections Based on the Concept of Low Carbon Building Design
CHEN Zhong Guo Jin Ling Neng Hao Jian Zhu: nearly zero energy building in China-part 2
Kong et al. Research on energy-saving technologies and countermeasures for public buildings
Wang et al. Green Transformation Technology Suitability Research of Existing Office Building
Yang et al. Generalized Building Energy Efficiency and New Energy Utilization
Bai et al. Energy Conservation Analysis on Self-thermal Insulation Walls Structural System in Cold Areas

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100303

Termination date: 20120724