CN201413226Y - Transformer pressure release valve tester - Google Patents

Transformer pressure release valve tester Download PDF

Info

Publication number
CN201413226Y
CN201413226Y CN200920026329XU CN200920026329U CN201413226Y CN 201413226 Y CN201413226 Y CN 201413226Y CN 200920026329X U CN200920026329X U CN 200920026329XU CN 200920026329 U CN200920026329 U CN 200920026329U CN 201413226 Y CN201413226 Y CN 201413226Y
Authority
CN
China
Prior art keywords
relief valve
tester
transformer
pressure release
casing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN200920026329XU
Other languages
Chinese (zh)
Inventor
郭敬欣
黄魏
李云铭
包建荣
王志刚
吕萌萌
王洪彬
陈骁
李亮
于磊
银晓华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Aipu Zhixin Amorphous Alloy Transformer Co Ltd
Original Assignee
Shandong Aipu Zhixin Amorphous Alloy Transformer Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Aipu Zhixin Amorphous Alloy Transformer Co Ltd filed Critical Shandong Aipu Zhixin Amorphous Alloy Transformer Co Ltd
Priority to CN200920026329XU priority Critical patent/CN201413226Y/en
Application granted granted Critical
Publication of CN201413226Y publication Critical patent/CN201413226Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Housings And Mounting Of Transformers (AREA)

Abstract

The utility model discloses a transformer pressure release valve tester. The tester solves the problem that the quality of pressure release valves cannot be effectively tested at present, and at leasthas the following advantages: the structure is simple, use is convenient, and the tester can effectively test whether the action of a pressure release valve is accurate, so that a transformer can continuously, safely and stably operate. The structure of the tester is as follows: the tester comprises a sealed case body, the side of the case body is provided with a group of positioning screw holesfor mounting the pressure release valve, the case body is provided with at least one compressed air inlet, a pressure meter is mounted on the case body through a pressure meter-mounting hole, and thecase body is also provided with a reinforcer.

Description

Transformer pressure relief valve verifying attachment
Technical field
The utility model relates to a kind of transformer pressure relief valve verifying attachment.
Background technology
Along with going deep into of the city net and the upgrading of rural power grids, the power consumption in city and rural area has all had significantly to be increased, but because the maintenance of part low-voltage circuit is not in place, the possibility that overload and short circuit take place increases greatly, so that the electric current of transformer surpasses several times even tens times of rated current, because the sharp increase of electric current, the coil temperature of substation transformer raises rapidly, cause insulation accelerated aging, forming the fragment shape comes off, make the line body exposed and cause turn-to-turn short circuit, the heat that short circuiting arc or overcurrent produce decomposes transformer oil, produces a large amount of gases at high pressure, makes fuel tank bear huge pressure, may make the fuel tank distortion when serious even break, and with the sprinkling of combustibility oil completely.At this situation, pressure relief valve is installed additional in transformer producer on transformer, when the transformer internal pressure reaches polarization value, and relief valve releases pressure, thus reach the purpose of protecting transformer.But when transformer production, producer can't effectively check pressure relief valve and determine the pressure relief valve quality, can not guarantee the operational reliability of outsourcing pressure relief valve.
Summary of the invention
The purpose of this utility model is exactly in order to solve the problem that the pressure relief valve quality can't effectively detect, provide a kind of have simple in structure, easy to use, whether accurate, the transformer pressure relief valve verifying attachment of advantages such as the continuous safe and stable operation of assurance transformer if can effectively detect its action.
For achieving the above object, the utility model adopts following technical scheme:
A kind of transformer pressure relief valve verifying attachment, it comprises a seal case, described casing side is provided with the positioning screw hole of one group of setting pressure relief valve, on casing, be provided with at least one pressurized air air admission hole, tensimeter is installed on the casing by the tensimeter mounting hole, also is provided with bracing means on casing.
Described bracing means comprises the angle bar that is arranged on casing wall middle part, and a pair of channel-section steel that is arranged on bottom half.
The device of detected pressures relief valve of the present utility model makes it produce pressure by pressurized air, and when reaching the pressure polarization value, whether the inspection pressure relief valve moves.Determine the pressure relief valve precision maneuver, guarantee the continuous safe and stable operation of transformer.
Casing is that hermetically sealed, thickness is that 6 millimeters iron plate is made.1/2 place of every side height installs an angle bar additional, prevents to cause dilatational strain because of applying a large amount of air.Two 550mm channel-section steels are equipped with in the bottom, and floor area is less, is applicable to indoor placement.
During use, install pressure indicator earlier, check whether indicating correct of indicator.Install pressure relief valve to be tested then, no screw is screwed down, in air intake opening, insert special-purpose tracheae.Whether inspection has omission, gas leakage position.Charge into gas during test, observe the gauge hand reading, check whether misoperation of pressure relief valve simultaneously, when indicator points to setting, observe pressure relief valve and whether normally whether move, move.Slowly reduce charging into gaseous tension after inspection finishes, check when reducing to setting whether pressure relief valve resets.After all qualified gas is discharged, pull down the pressure relief valve that has been up to the standards.
The beneficial effects of the utility model are: simple in structure, easy to use, can determine the pressure relief valve precision maneuver, and guarantee the continuous safe and stable operation of transformer.
Description of drawings
Fig. 1 is a structural representation of the present utility model;
Fig. 2 is the side view of Fig. 1;
Fig. 3 is the vertical view of Fig. 1.
Wherein, 1. casing, 2. positioning screw hole, 3. tensimeter mounting hole, 4. angle bar, 5. channel-section steel.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing and embodiment.
Among Fig. 1, Fig. 2, Fig. 3, it comprises a seal case 1, and casing 1 side is provided with the positioning screw hole 2 of one group of setting pressure relief valve, and air admission hole and its size, position consistency are provided with tensimeter mounting hole 3 on casing 1, also is provided with bracing means on casing 1.Bracing means comprises the angle bar 4 that is arranged on casing 1 wall middle part, and a pair of channel-section steel 5 that is arranged on casing 1 bottom.

Claims (2)

1. transformer pressure relief valve verifying attachment, it is characterized in that, it comprises a seal case, described casing side is provided with the positioning screw hole of one group of setting pressure relief valve, on casing, be provided with at least one pressurized air air admission hole, tensimeter is installed on the casing by the tensimeter mounting hole, also is provided with bracing means on casing.
2. transformer pressure relief valve verifying attachment as claimed in claim is characterized in that, described bracing means comprises the angle bar that is arranged on casing wall middle part, and a pair of channel-section steel that is arranged on bottom half.
CN200920026329XU 2009-05-27 2009-05-27 Transformer pressure release valve tester Expired - Fee Related CN201413226Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200920026329XU CN201413226Y (en) 2009-05-27 2009-05-27 Transformer pressure release valve tester

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200920026329XU CN201413226Y (en) 2009-05-27 2009-05-27 Transformer pressure release valve tester

Publications (1)

Publication Number Publication Date
CN201413226Y true CN201413226Y (en) 2010-02-24

Family

ID=41715109

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200920026329XU Expired - Fee Related CN201413226Y (en) 2009-05-27 2009-05-27 Transformer pressure release valve tester

Country Status (1)

Country Link
CN (1) CN201413226Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103278297A (en) * 2013-06-07 2013-09-04 山东沂蒙电力设备有限公司 Testing device of transformer pressure relief valve

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103278297A (en) * 2013-06-07 2013-09-04 山东沂蒙电力设备有限公司 Testing device of transformer pressure relief valve

Similar Documents

Publication Publication Date Title
CN108107355A (en) A kind of SF6And SF6Mixed gas density monitor calibration equipment and method
CN102136359B (en) Novel oil immersed inverted vertical current transformer and insulation detection method thereof
CN203688174U (en) Device capable of onsite detecting transformer oil leakage and gas relay alarm performance
CN101995319A (en) Airtightness testing machine
CN111337381A (en) Test device and method for detecting thermal runaway gas production rate of lithium battery
CN103674786B (en) Permeability tester under electric field action
CN103048616B (en) SF 6the charged calibration equipment of density monitor
CN201413226Y (en) Transformer pressure release valve tester
CN202512205U (en) Paper oil insulation fault simulation model of inverted current transformer
CN101598639B (en) Electrification oil sample acquisition device for oil-immersed sleeve pipe of transformer
CN201396474Y (en) Normal-closed electromagnetic valve
CN205749775U (en) Force oil circulation transformer oil paper insulation test system
CN206496894U (en) A kind of battery pressure limiting cover plate explosion-proof valve air pressure test system
CN203204903U (en) Visual practical training model used for accurate measurement of transformer wire outlet sleeve
CN210111458U (en) Gas insulation switch cabinet
CN212083152U (en) Test device for detecting thermal runaway gas production rate of lithium battery
CN203324040U (en) Granularity testing and sampling device special for oil of 500kV-grade transformer
CN209656236U (en) A kind of automotive oil tank air-tightness detection device
CN201788260U (en) Sulfur hexafluoride gas density relay test stand
CN203631250U (en) Transformer oil conservator of piston structure
CN202930909U (en) Waterlogging supervising device in enclosed bus
CN218770881U (en) GIS gassing specialized tool of totally closed combined electrical apparatus of gas insulation
CN216815865U (en) Performance measuring device for metal seal of pilot operated safety valve
CN202586108U (en) Integrated distribution box
CN210774690U (en) Detection device for safety valve of storage battery

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100224

Termination date: 20180527

CF01 Termination of patent right due to non-payment of annual fee