CN201411829Y - Stainless steel reinforced bar insulation binding hoop - Google Patents

Stainless steel reinforced bar insulation binding hoop Download PDF

Info

Publication number
CN201411829Y
CN201411829Y CN2009201543989U CN200920154398U CN201411829Y CN 201411829 Y CN201411829 Y CN 201411829Y CN 2009201543989 U CN2009201543989 U CN 2009201543989U CN 200920154398 U CN200920154398 U CN 200920154398U CN 201411829 Y CN201411829 Y CN 201411829Y
Authority
CN
China
Prior art keywords
binding
plastic
reinforced bar
hoop
stainless steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009201543989U
Other languages
Chinese (zh)
Inventor
彭华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Jingtang Construction Co Ltd
Original Assignee
MCC Jingtang Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Jingtang Construction Co Ltd filed Critical MCC Jingtang Construction Co Ltd
Priority to CN2009201543989U priority Critical patent/CN201411829Y/en
Application granted granted Critical
Publication of CN201411829Y publication Critical patent/CN201411829Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Clamps And Clips (AREA)

Abstract

The utility model relates to a reinforced bar binding tool of construction projects, in particular to a stainless steel reinforced bar insulation binding hoop. The binding hoop comprises a plastic fixture and a plastic pad which are concreted as a whole; the plastic fixture is provided with a groove in the middle, one end is provided with a serrated soft plastic tape and the other end is providedwith a short soft plastic tape, and the short soft plastic tape is provided with a through hole corresponding to the serrated soft plastic tape; and the middle of the plastic pad is provided with thethrough hole. The binding hoop can reduce the complicated front-stage procedures of manufacturing open PVC pipe casings and plastic binding ropes and the like and shortens work period by directly using the insulation binding hoop for binding construction. The insulation effect is reliable, the current caused by electromagnetism is avoided and the use is safe. The firmer binding can ensure the firmness of binding the reinforced bar better as well as the design interval of the reinforced bar, thus more ensuring project quality.

Description

Stainless steel rebar insulated binding hoop
Technical field:
The utility model relates to a kind of reinforcing bar binding instrument of construction work, specifically a kind of stainless steel rebar insulated binding hoop.
Background technology:
Electric current in the current architecture configuration design when avoiding invar muscle communications and liaison produces electromagnetic eddy, and uses stainless reinforcing bar in a large number, but the technical requirements of stainless reinforcing bar binding is, must colligation firmly and assurance does not produce displacement and adjacent reinforcing bar can not be in contact with one another.Available technology adopting plastic ties and pvc pipe are as the colligation material of stainless steel rebar, and the fastening method of colligation mainly adopts the opening pvc pipe to entangle reinforcing bar, re-use plastic ties and bundle reinforcing, the not high and waste material of operating efficiency.
Summary of the invention:
Goal of the invention of the present utility model is to overcome the prior art deficiency, provides a kind of simple in structure, easy to operate, time saving and energy saving, and insulation effect is good, the stainless steel rebar insulated binding hoop that colligation is fastening.
The purpose of this utility model is finished by the following technical solutions:
A kind of stainless steel rebar insulated binding hoop, comprise plastic clamp, plastic mattress, described plastic clamp and plastic mattress are fixed to be one, this plastic clamp middle part is provided with groove, one end is provided with the soft band of moulding of zigzag, the other end is provided with the short soft band of moulding, and this weak point is soft to be moulded to be with to be provided with soft the moulding of zigzag and be with corresponding through hole; Described plastic mattress middle part is provided with through hole.
Adopt technique scheme, compared with prior art, the utility model has the advantages that:
Reduce loaded down with trivial details operations in early stage such as making opening pvc pipe cover, plastics colligation rope, directly use the insulated binding hoop to bundle construction, shortened the duration; Insulation effect is reliable, avoids because of electromagnetism produces electric current, and is safe in utilization; Colligation is more firm, more can guarantee the firm degree of reinforcing bar binding, guarantees the design pitch of reinforcing bar, makes workmanship more guaranteed.
Description of drawings
Fig. 1 is a front view of the present utility model.
Fig. 2 is a right view of the present utility model.
The specific embodiment:
See Fig. 1, Fig. 2, a kind of stainless steel rebar insulated binding hoop, comprise plastic clamp 2, plastic mattress 1, this plastic clamp 2 and plastic mattress 1 are fixed to be one, and plastic clamp 2 middle parts are provided with groove 6, one ends and are provided with soft the moulding of zigzag and are with 3, the other end is provided with short soft moulding and is with 4, and this weak point is soft to be moulded and be with 4 to be provided with soft the moulding of zigzag and to be with 3 corresponding through holes 5; This plastic mattress 1 middle part is provided with through hole 7.
Using method of the present utility model is:
See Fig. 1, Fig. 2, during use, penetrate in advance in the through hole 7 that the bottom reinforcement bars of wanting colligation is provided with from plastic mattress 1 middle part, again top rebars is positioned in the groove 6 that plastic clamp 2 middle parts are provided with, then soft the moulding of zigzag penetrated short soft moulding with 4 with 3 and that be provided be with the 3 corresponding through holes 5 with soft the moulding of zigzag from reinforcing bar top, tension can be bound reinforcing bar.

Claims (1)

1, a kind of stainless steel rebar insulated binding hoop, comprise plastic clamp, plastic mattress, it is characterized in that, described plastic clamp and plastic mattress are fixed to be one, this plastic clamp middle part is provided with groove, one end is provided with the soft band of moulding of zigzag, and the other end is provided with the short soft band of moulding, and this weak point is soft to be moulded to be with to be provided with soft the moulding of zigzag and be with corresponding through hole; Described plastic mattress middle part is provided with through hole.
CN2009201543989U 2009-05-22 2009-05-22 Stainless steel reinforced bar insulation binding hoop Expired - Fee Related CN201411829Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009201543989U CN201411829Y (en) 2009-05-22 2009-05-22 Stainless steel reinforced bar insulation binding hoop

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009201543989U CN201411829Y (en) 2009-05-22 2009-05-22 Stainless steel reinforced bar insulation binding hoop

Publications (1)

Publication Number Publication Date
CN201411829Y true CN201411829Y (en) 2010-02-24

Family

ID=41713716

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009201543989U Expired - Fee Related CN201411829Y (en) 2009-05-22 2009-05-22 Stainless steel reinforced bar insulation binding hoop

Country Status (1)

Country Link
CN (1) CN201411829Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103031959A (en) * 2012-12-31 2013-04-10 攀钢集团工程技术有限公司 Insulating and binding method for stainless steel reinforcing steel bars at anti-magnetic area
CN111502044A (en) * 2020-04-28 2020-08-07 无锡锡晟建设有限公司 Roof subsides post-cast strip additional layer steel bar structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103031959A (en) * 2012-12-31 2013-04-10 攀钢集团工程技术有限公司 Insulating and binding method for stainless steel reinforcing steel bars at anti-magnetic area
CN111502044A (en) * 2020-04-28 2020-08-07 无锡锡晟建设有限公司 Roof subsides post-cast strip additional layer steel bar structure

Similar Documents

Publication Publication Date Title
CN201411829Y (en) Stainless steel reinforced bar insulation binding hoop
PL1936071T3 (en) Method of replacing a post and installation comprising a post
CN101949198B (en) Parallel bar type anchor device for flexible flaky material and method thereof
CN202809994U (en) Portable horizontal reinforcing steel bar spacing controller
CN204551910U (en) A kind of protective layer plastic bearer of reinforced bar of nylon cable tie colligation
CN202745462U (en) Clamping two-semicircle combined hoops for preventing rod from falling
CN204781951U (en) Cantilever beam mould with circulating anchor assembly
CN204023813U (en) U-shaped abdomen silk drawknot is reinforced steel mesh warming plate
CN203049892U (en) Structure for steel strand polymer mortar reinforced concrete structural member
CN203278096U (en) Lead/ground wire plastic cloth remover
CN207332116U (en) A kind of building prestressing force coagulates the fixing end anchorage used in soil
CN104234495A (en) Stay wire binding tool
CN204174997U (en) Drawing wire binding tool
CN201224956Y (en) Cross bidirectional reinforcing steel bar buckle
PT2141287E (en) Method of constructing a retaining wall
CN201209276Y (en) Water stop tie fixation anchorage at building slot position
CN203412204U (en) Steel bar binding band
CN203684531U (en) Pre-stressed tendon anchoring insertion piece and pre-stressed concrete structure comprising anchoring insertion piece
CN203904986U (en) Low prestressed rectangular single-section soldier pile
CN212243965U (en) Special tool for binding construction steel bars
CN203603379U (en) Device for positioning reserved steel bars of balcony fence
CN213324631U (en) Binding rope with hook
CN204125912U (en) A kind of ladle arc door seat structure
CN203129367U (en) Partition board connecting structure of composite partition wall
CN212405114U (en) Precast concrete pile extension connection structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100224

Termination date: 20130522