CN201402950Y CN2009203017352U CN200920301735U CN201402950Y CN 201402950 Y CN201402950 Y CN 201402950Y CN 2009203017352 U CN2009203017352 U CN 2009203017352U CN 200920301735 U CN200920301735 U CN 200920301735U CN 201402950 Y CN201402950 Y CN 201402950Y
Authority
CN
China
Prior art keywords
pole
offside
branch
buried casing
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009203017352U
Other languages
Chinese (zh)
Inventor
袁小林
张培建
梅晓丽
张军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
Third Construction Co Ltd of China Construction First Group Co Ltd
Second Construction Co Ltd of China Construction First Group Co Ltd
China Construction First Divison Group Huajiang Construction Co Ltd
Original Assignee
China Construction First Group Corp Ltd
Third Construction Co Ltd of China Construction First Group Co Ltd
Second Construction Co Ltd of China Construction First Group Co Ltd
China Construction First Divison Group Huajiang Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd, Third Construction Co Ltd of China Construction First Group Co Ltd, Second Construction Co Ltd of China Construction First Group Co Ltd, China Construction First Divison Group Huajiang Construction Co Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN2009203017352U priority Critical patent/CN201402950Y/en
Application granted granted Critical
Publication of CN201402950Y publication Critical patent/CN201402950Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Connection Or Junction Boxes (AREA)

Abstract

The utility model provides a temporary adjustable support of embedded box, install in the inside of embedded box, it includes hug closely one to two offside extension boards on two offside inner walls of embedded box and to a pair of branch between the collateral branch board, the perpendicular fixedly connected with two location wedges of the inner surface of one of them piece of every offside extension board, the perpendicular fixedly connected with two lead screws of the inner surface of another piece of collateral branch board, connect branch between location wedge and the lead screw, branch is hollow steel pipe, its one end cover is on location wedge, its other end and lead screw threaded connection, the middle part of branch crosses there is the aperture of perpendicular to axis. The utility model discloses simple structure, construction safety, reliable, the electric box body does not have deformation, not have the damage after the form removal, and with wall parallel and level, pleasing to the eye. As long as when the structure wall body is under construction, set up in the electric box body the utility model discloses, can thoroughly solve the box deformation problem when the electric box body secretly buries the construction.

Description

The interim adjustable support of pre-buried casing
Technical field
The utility model relates to a kind of support, particularly a kind of antinose-dive leg.
Background technology
When structure construction, existing electrical box construction is no longer with the method for installing again after structure hole to be provided, the form removal, but adopt electrical box with the pre-buried way that once survives of structure while, but in construction, often find, electrical box tends to distortion after the form removal, analyze its deformation reason, find it mainly is to support insecurely in the electrical box, also have in part because the civil engineering template is run and to be molded as.Existing remedial measure normally adopts electrical box picked out again and does, and plasters in the stifled subsequently hole of civil engineering, but this method can be wasted a lot of materials and artificial, and influences the impression quality of structure construction.
The utility model content
In order to overcome the deficiencies in the prior art, the utility model provides a kind of pre-buried casing interim adjustable support, solve the technical problem of electrical box easy deformation in the structure construction.
The technical scheme that its technical problem that solves the utility model adopts is:
The interim adjustable support of a kind of pre-buried casing, be installed on the inside of pre-buried casing, it is characterized in that: it comprises one to the two offside support plate that is close on the pre-buried casing two offside inwalls and a pair of pole between every offside support plate, wherein one the inner face vertical fixing of every offside support plate 2 is connected with two location chocks, the inner face vertical fixing of another piece side support plate is connected with two screw mandrels, be connected pole between location chock and the screw mandrel, pole is a hollow steel pipe, the one end is enclosed within on the chock of location, its other end is connected with wire rod thread, and the aperture perpendicular to axis is crossed at the middle part of pole.
Described side support plate can be angle steel or steel plate.
A nut can be welded in the end of described pole, and pole is connected with wire rod thread by nut.
Can be lined with the support plank between described pole and the pre-buried casing madial wall, support plank and be resisted against pre-buried casing case bottom by the plank leg.
The beneficial effects of the utility model are as follows:
The utility model is simple in structure, construction safety, reliable, and electrical box does not have distortion, do not have and damage after the form removal, and is concordant with metope, attractive in appearance.As long as when structure wall construct, the utility model is set in electrical box, can thoroughly solve electrical box and secretly bury box deformation problem when constructing.
The utility model can be recycled when the construction standard layer is constructed, and can save a lot of materials, not only installs for the later stage distribution box and has saved manually, has shortened the duration, has also created advantageous conditions for other operation construction.And the utility model can not influence the impression quality of structure construction fully.
Description of drawings
Below in conjunction with drawings and Examples the utility model is further specified.
Fig. 1 is a structural representation of the present utility model.
Fig. 2 is the elevational schematic view of Fig. 1.
Fig. 3 is the perspective view of the utility model embodiment one.
Fig. 4 is the perspective view of the utility model embodiment two.
The pre-buried casing of Reference numeral: 1-, 2-side support plate, 3-location chock, 4-screw mandrel, 5-pole, 6-nut, 7-aperture, 8-plank, 9-plank leg.
Embodiment
Embodiment one is referring to shown in Fig. 1-3, the interim adjustable support of this pre-buried casing, be installed on the inside of pre-buried casing 1, it comprises the offside support plate 2 that is close on 1 liang of offside inwall of pre-buried casing and a pair of pole 5 between every offside support plate 2, side support plate 2 is angle steel, wherein one the inner face vertical fixing of every offside support plate 2 is connected with two location chocks 3, the inner face vertical fixing of another piece side support plate 2 is connected with two screw mandrels 4, be connected pole 5 between location chock 3 and the screw mandrel 4, pole 5 is the female hollow steel pipe of an end, the one end is enclosed within on the chock 3 of location, and its other end is threaded with screw mandrel 4, and the aperture 7 perpendicular to axis is crossed at the middle part of pole 5.Be lined with between pole 5 and the pre-buried casing madial wall and support plank 8, support plank and be resisted against pre-buried casing case bottom by plank leg 9.
The leg of described plank leg 9 is long for the thickness of pre-buried casing 1 deducts the thickness that supports plank 8, and plank leg 9 can have many, has five in the present embodiment, is multi-point support.Can insert key in the aperture 7, rotate pole 5 thus, with the elasticity of pole 5 adjusting supports.
Embodiment two is referring to Fig. 4, and a nut 6 also can be welded in the end of pole 5, and pole 5 is threaded with screw mandrel 4 by nut 6.
Two offside support plates 2 also can be arranged in the described pre-buried casing 1, and this two offsides support plate 2 is close on 1 liang of offside inwall of pre-buried casing.Described side support plate 2 can also be a steel plate.

Claims (4)

1. interim adjustable support of pre-buried casing, be installed on the inside of pre-buried casing (1), it is characterized in that: it comprises one to the two offside support plate (2) that is close on pre-buried casing (1) the two offside inwall and a pair of pole (5) between every offside support plate (2), wherein one the inner face vertical fixing of every offside support plate (2) is connected with two location chocks (3), the inner face vertical fixing of another piece side support plate (2) is connected with two screw mandrels (4), the location chock (3) with screw mandrel (4) between be connected pole (5), pole (5) is a hollow steel pipe, the one end is enclosed within on the location chock (3), its other end is threaded with screw mandrel (4), and the aperture (7) perpendicular to axis is crossed at the middle part of pole (5).
2. the interim adjustable support of pre-buried casing according to claim 1 is characterized in that: described side support plate (2) is angle steel or steel plate.
3. the interim adjustable support of pre-buried casing according to claim 1 is characterized in that: a nut (6) is welded in the end of described pole (5), and pole (5) is threaded with screw mandrel (4) by nut (6).
4. the interim adjustable support of pre-buried casing according to claim 1 is characterized in that: be lined with between described pole (5) and the pre-buried casing madial wall and support plank (8), support plank and be resisted against pre-buried casing case bottom by plank leg (9).
CN2009203017352U 2009-03-30 2009-03-30 Temporary adjustable support for embedded box Expired - Fee Related CN201402950Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009203017352U CN201402950Y (en) 2009-03-30 2009-03-30 Temporary adjustable support for embedded box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009203017352U CN201402950Y (en) 2009-03-30 2009-03-30 Temporary adjustable support for embedded box

Publications (1)

Publication Number Publication Date
CN201402950Y true CN201402950Y (en) 2010-02-10

Family

ID=41662749

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009203017352U Expired - Fee Related CN201402950Y (en) 2009-03-30 2009-03-30 Temporary adjustable support for embedded box

Country Status (1)

Country Link
CN (1) CN201402950Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103401192A (en) * 2013-07-16 2013-11-20 胜利油田胜利工程建设(集团)有限责任公司 Replacement-free fixed clamp for wall-buried electrical junction box
CN111441581A (en) * 2020-04-30 2020-07-24 北京天润建设有限公司 Template structure and construction method thereof
CN111749462A (en) * 2020-07-06 2020-10-09 中核华辰建筑工程有限公司 Circulating support device for wall-embedded concealed-assembly electric box and preparation process
CN113062589A (en) * 2021-04-13 2021-07-02 中国十七冶集团有限公司 Pre-buried block terminal hole mould in brickwork wall

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103401192A (en) * 2013-07-16 2013-11-20 胜利油田胜利工程建设(集团)有限责任公司 Replacement-free fixed clamp for wall-buried electrical junction box
CN103401192B (en) * 2013-07-16 2016-02-10 胜利油田胜利工程建设(集团)有限责任公司 Secretly bury the fixing card of electrical junction box free of replacement within the walls
CN111441581A (en) * 2020-04-30 2020-07-24 北京天润建设有限公司 Template structure and construction method thereof
CN111749462A (en) * 2020-07-06 2020-10-09 中核华辰建筑工程有限公司 Circulating support device for wall-embedded concealed-assembly electric box and preparation process
CN113062589A (en) * 2021-04-13 2021-07-02 中国十七冶集团有限公司 Pre-buried block terminal hole mould in brickwork wall

Similar Documents

Publication Publication Date Title
CN201402950Y (en) Temporary adjustable support for embedded box
CN105401599A (en) Open trench tunnel main structure tall side wall unilateral vertical mold and construction process thereof
CN203716498U (en) Special support device for overcoming split bolt hole defects of fair-faced concrete walls, columns and beams
CN205934960U (en) Foundation bolt positioning device
CN103321410B (en) Encorbelment oblique pull mould and mold method in a kind of external corner place
CN202913697U (en) Core model of reserved hole
CN205212361U (en) Strutting arrangement is assisted to block terminal
CN204510817U (en) Hole to be provided regularization adjustable steel frame template
CN202910099U (en) Fixing device of wire-drawing die box for bar reinforcement
CN103669831B (en) A kind of transformer station's cast-in-situ wall combined steel and construction method thereof
CN215803244U (en) Isolated plastic-containing insulation board connecting and fixing device
CN114215350A (en) Internal supporting device for concrete wall buried distribution box and using method of internal supporting device
CN205791363U (en) A kind of electrical engineering positioning installation apparatus
CN204531420U (en) Concreting plate device
CN203603480U (en) Recoverable embedded type reserved hole shaping mold
CN205219406U (en) Upper cover locking device that production recess board was used
CN208668934U (en) A kind of taper support seat and caisson hanger mounting device
CN207109612U (en) Novel bridge building form device
CN106545158B (en) A kind of square column concrete component Wood-plastic formwork reinforces fixture and its application method
CN203403673U (en) Overhang inclined drawing die at external corner
CN203967672U (en) Concrete wall can positioning wires box
CN204604539U (en) A kind of precast stair mould
CN110439273A (en) A kind of mold and installation method of telescopic production slope monitoring clump pedestal
CN215407391U (en) Hang mould quality control device
CN216787834U (en) A preformed hole model for building plumbing pipe

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100210