CN201395875Y - L型剪力墙垂直连接节点 - Google Patents

L型剪力墙垂直连接节点 Download PDF

Info

Publication number
CN201395875Y
CN201395875Y CN2009200377712U CN200920037771U CN201395875Y CN 201395875 Y CN201395875 Y CN 201395875Y CN 2009200377712 U CN2009200377712 U CN 2009200377712U CN 200920037771 U CN200920037771 U CN 200920037771U CN 201395875 Y CN201395875 Y CN 201395875Y
Authority
CN
China
Prior art keywords
shear wall
joint bar
vertical connection
prefabricated
type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2009200377712U
Other languages
English (en)
Inventor
山姆·西格曼
侯海泉
董年才
张军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Construction General Contractor Co., Ltd.
Original Assignee
NANTONG CONSTRUCTION GENERAL CONTRACTOR CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANTONG CONSTRUCTION GENERAL CONTRACTOR CO Ltd filed Critical NANTONG CONSTRUCTION GENERAL CONTRACTOR CO Ltd
Priority to CN2009200377712U priority Critical patent/CN201395875Y/zh
Application granted granted Critical
Publication of CN201395875Y publication Critical patent/CN201395875Y/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

本实用新型公开了一种L型剪力墙垂直连接节点,包括第一预制剪力墙和第二预制剪力墙,其特征在于:所述第一预制剪力墙一端具有“∩”型第一插筋,所述第二预制剪力墙在与第一预制剪力墙相连接端具有“∩”型第二插筋,在第一插筋与第二插筋相交处为现浇砼。本实用新型的L型剪力墙垂直连接节点,在节点处设置有第一插筋与第二插筋,并通过现浇砼将第一预制剪力墙和第二预制剪力墙连接成为一个整体,能够承受与传递竖直及水平方向的外力,保证建筑物的安全。

Description

L型剪力墙垂直连接节点
技术领域
本实用新型涉及一种L型剪力墙垂直连接节点,属于建筑结构技术领域。
背景技术
剪力墙是由钢筋混凝土浇成的墙体。由剪力墙组成的承受竖向和水平作用的结构,称为剪力墙结构。剪力墙的抗侧移刚度很大,它主要用来抵抗水平作用和承担竖向作用;墙体同时也作为维护及房屋分隔构件。剪力墙结构可建得很高,主要用于12-30层的住宅建设。剪力墙结构是由钢筋混凝土墙板代替框架结构中的梁柱作为建筑主要承重构件的结构。因为高层建筑所要抵抗的水平剪力主要是地震引起,所以剪力墙较之其他结构形式而言,更能有效地控制结构的水平剪力,抵抗破坏的能力更强,抗震性能更好,安全性更高,居住也很舒适。在剪力墙与剪力墙连接处,需要使剪力墙与剪力墙连接为一整体,使剪力墙保持连续,在地震力等外力的作用下,能够传递竖向反力与水平剪力,保证建筑物安全。目前,剪力墙与剪力墙之间L形节点有很多种,如专利号为200720149365.6的实用新型涉及一种双向单排配筋剪力墙L形节点,包括混凝土保护层、纵向钢筋、水平钢筋,在剪力墙表面布置的密目钢丝网。墙体采用双向单排配筋方式,水平钢筋在节点处90°弯折,弯折点距剪力墙外表面的距离为混凝土保护层厚度,弯折后的延伸长度大于或等于弯折钢筋直径的15倍,在水平钢筋的内折角处布置1根纵向钢筋,在远离内折角处的墙体表面内侧沿水平钢筋布置1根纵向钢筋;节点中心区以外的纵向钢筋均匀布置,其间距大于或等于节点中心区内的纵向钢筋的间距。能够在保证抗震性能的前提下减少钢筋用量,降低施工成本,但其承受与传递竖直及水平方向的外力的能力有限。
实用新型内容
本实用新型所要解决的技术问题是提供一种可使剪力墙在墙角处连接为整体、且承受外力能力强的L型剪力墙垂直连接节点。
为解决上述技术问题,本实用新型提供一种L型剪力墙垂直连接节点,包括第一预制剪力墙和第二预制剪力墙,其特征在于:所述第一预制剪力墙在节点处具有一组“∩”型第一插筋,所述第二预制剪力墙在与第一预制剪力墙相连接端具有一组“∩”型第二插筋,在第一插筋与第二插筋相交处为现浇砼。
本实用新型所达到的有益效果:
本实用新型的L型剪力墙垂直连接节点,在节点处设置有一组“∩”型第一插筋与第二插筋,并通过现浇砼将第一预制剪力墙和第二预制剪力墙连接成为一个整体,能够承受与传递竖直及水平方向的外力,保证建筑物的安全。
附图说明
图1为本实用新型的L型剪力墙垂直连接节点结构示意图。
具体实施方式
下面结合附图对本实用新型作进一步描述。图1为本实用新型的L型剪力墙垂直连接节点结构示意图。
本实用新型的一种L型剪力墙垂直连接节点,包括第一预制剪力墙1和第二预制剪力墙2,其特征在于:所述第一预制剪力墙在节点处具有一组“∩”型第一插筋4,所述第二预制剪力墙在与第一预制剪力墙相连接端具有一组“∩”型第二插筋5,在第一插筋4与第二插筋5相交处为现浇砼3。
所述现浇砼3的宽度与第一预制剪力墙1及第二预制剪力墙2的厚度相同。
所述第一插筋4和第二插筋5为
Figure G2009200377712D00021
12钢筋,且每根间距为200mm。
所述第一预制剪力墙1和第二预制剪力墙2墙厚为200mm。
所述第一插筋4伸入第一预制剪力墙1长度为500mm。所述第二插筋5伸入第二预制剪力墙2长度为500mm。
本实用新型的L型剪力墙垂直连接节点的施工方法为:
1.在预制第一预制剪力墙1时,设置有第一插筋4,且第一插筋4伸入第一预制剪力墙1长度的为500mm;在预制第二预制剪力墙2时,设置有第二插筋5,且第二插筋5伸入第二预制剪力墙2的长度为500mm。
2.在节点处现浇混凝土,成为现浇砼3,且现浇砼3的宽度与第一预制剪力墙1及第二预制剪力墙2的厚度相同为200mm。

Claims (5)

1.一种L型剪力墙垂直连接节点,包括第一预制剪力墙(1)和第二预制剪力墙(2),其特征在于:所述第一预制剪力墙一端具有一组“∩”型第一插筋(4),所述第二预制剪力墙在与第一预制剪力墙相连接端具有一组“∩,,型第二插筋(5),在第一插筋(4)与第二插筋(5)相交处为现浇砼(3)。
2.根据权利要求1所述的L型剪力墙垂直连接节点,其特征在于:所述第一插筋(4)和第二插筋(5)为
Figure Y2009200377710002C1
钢筋,且每根间距为200mm。
3.根据权利要求1所述的L型剪力墙垂直连接节点,其特征在于:所述第一预制剪力墙(1)和第二预制剪力墙(2)墙厚为200mm。
4.根据权利要求1所述的L型剪力墙垂直连接节点,其特征在于:所述第一插筋(4)伸入第一预制剪力墙(1)长度为500mm;所述第二插筋(5)伸入第二预制剪力墙(2)长度为500mm。
5.根据权利要求1所述的L型剪力墙垂直连接节点,其特征在于:所述现浇砼(3)的宽度与第一预制剪力墙(1)及第二预制剪力墙(2)的厚度相同。
CN2009200377712U 2009-02-04 2009-02-04 L型剪力墙垂直连接节点 Expired - Lifetime CN201395875Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009200377712U CN201395875Y (zh) 2009-02-04 2009-02-04 L型剪力墙垂直连接节点

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009200377712U CN201395875Y (zh) 2009-02-04 2009-02-04 L型剪力墙垂直连接节点

Publications (1)

Publication Number Publication Date
CN201395875Y true CN201395875Y (zh) 2010-02-03

Family

ID=41618379

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009200377712U Expired - Lifetime CN201395875Y (zh) 2009-02-04 2009-02-04 L型剪力墙垂直连接节点

Country Status (1)

Country Link
CN (1) CN201395875Y (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101503893B (zh) * 2009-02-04 2011-04-20 南通建筑工程总承包有限公司 L型剪力墙垂直连接节点
CN102433945A (zh) * 2011-08-30 2012-05-02 东南大学 装配剪力墙结构预制内墙板竖向混合连接结构及方法
CN103711238A (zh) * 2013-12-28 2014-04-09 中国建筑第七工程局有限公司 装配式环筋扣合锚接混凝土剪力墙结构体系
CN104294967A (zh) * 2014-10-08 2015-01-21 绍兴宝业西伟德混凝土预制件有限公司 L型预制叠合剪力墙垂直抗震连接节点及其施工方法
CN104763079A (zh) * 2015-03-11 2015-07-08 任志鹏 可折叠的装配整体式混凝土剪力墙结构
CN106065669A (zh) * 2014-09-29 2016-11-02 中铁四局集团有限公司 预制剪力墙连接构件中的钢筋连接方式
CN106351374A (zh) * 2016-07-15 2017-01-25 刘祥锦 装配式整厚预制楼板单元的连接节点及其楼板单元

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101503893B (zh) * 2009-02-04 2011-04-20 南通建筑工程总承包有限公司 L型剪力墙垂直连接节点
CN102433945A (zh) * 2011-08-30 2012-05-02 东南大学 装配剪力墙结构预制内墙板竖向混合连接结构及方法
CN103711238A (zh) * 2013-12-28 2014-04-09 中国建筑第七工程局有限公司 装配式环筋扣合锚接混凝土剪力墙结构体系
CN106065669A (zh) * 2014-09-29 2016-11-02 中铁四局集团有限公司 预制剪力墙连接构件中的钢筋连接方式
CN104294967A (zh) * 2014-10-08 2015-01-21 绍兴宝业西伟德混凝土预制件有限公司 L型预制叠合剪力墙垂直抗震连接节点及其施工方法
CN104763079A (zh) * 2015-03-11 2015-07-08 任志鹏 可折叠的装配整体式混凝土剪力墙结构
CN106351374A (zh) * 2016-07-15 2017-01-25 刘祥锦 装配式整厚预制楼板单元的连接节点及其楼板单元

Similar Documents

Publication Publication Date Title
CN101503893B (zh) L型剪力墙垂直连接节点
CN201395875Y (zh) L型剪力墙垂直连接节点
CN101503896B (zh) 一字型剪力墙垂直连接节点
CN102900170B (zh) L型剪力墙水平连接节点
CN101215856B (zh) 钢管混凝土柱-板铰接节点
CN101503892B (zh) 钢筋混凝土全预制装配结构剪力墙与梁之间的连接节点
CN201649367U (zh) L型剪力墙水平连接节点
CN203129359U (zh) 带交叉斜筋的单排配筋混凝土剪力墙
CN106869567A (zh) 一种耗能型冷弯薄壁钢管混凝土抗侧力体系
CN103015630A (zh) 一种内置pvc管增强外包钢混凝土组合柱
CN212153802U (zh) 全现浇混凝土夹心填充外墙与主体结构柔性连接结构
CN101503888A (zh) 外剪力墙与板及剪力墙层间连接节点
CN201144462Y (zh) 钢管混凝土柱-板铰接节点
CN101503894B (zh) T型剪力墙垂直连接节点
CN101025035A (zh) 钢管-钢骨混凝土异型柱
CN203213344U (zh) 工业化率高的装配整体式钢筋混凝土剪力墙结构体
CN201730215U (zh) L型剪力墙水平连接节点
CN203145193U (zh) 焊接组合型钢混凝土异形柱-钢梁半刚性节点
CN203603526U (zh) 一种钢筋混凝土框架柱的加固结构
CN201433480Y (zh) 一字型剪力墙垂直连接节点
CN201620475U (zh) T型剪力墙水平连接节点结构
CN102888912A (zh) L型剪力墙水平连接节点
CN201395859Y (zh) 内剪力墙与板及剪力墙层间连接节点
CN201433479Y (zh) T型剪力墙垂直连接节点
CN105275120A (zh) 预制装配轻钢混凝土板柱结构及其施工方法

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: KANNUOC (SHANGHAI ) ENGINEERING TECHNOLOGY ADVICE

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Sam.Sigelman

Inventor after: Hou Haiquan

Inventor after: Dong Niancai

Inventor after: Zhang Jun

Inventor before: Sam.Sigman

Inventor before: Hou Haiquan

Inventor before: Dong Niancai

Inventor before: Zhang Jun

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: SAM SIGMAN HOU HAIQUAN DONG NIANCAI ZHANG JUN TO: SAM SAIGMAN HOU HAIQUAN DONG NIANCAI ZHANG JUN

TR01 Transfer of patent right

Effective date of registration: 20100603

Address after: 226124 Jiangsu Province Haimen Changle Town

Co-patentee after: Nantong Construction General Contractor Co., Ltd.

Patentee after: Nantong Construction General Contractor Co., Ltd.

Address before: 226124 Jiangsu Province Haimen Changle Town

Patentee before: Nantong Construction General Contractor Co., Ltd.

AV01 Patent right actively abandoned

Granted publication date: 20100203

Effective date of abandoning: 20090204