CN201395757Y - Fast-assembled light road slab connecting device - Google Patents

Fast-assembled light road slab connecting device Download PDF

Info

Publication number
CN201395757Y
CN201395757Y CN2009201024258U CN200920102425U CN201395757Y CN 201395757 Y CN201395757 Y CN 201395757Y CN 2009201024258 U CN2009201024258 U CN 2009201024258U CN 200920102425 U CN200920102425 U CN 200920102425U CN 201395757 Y CN201395757 Y CN 201395757Y
Authority
CN
China
Prior art keywords
rotating shaft
fast
road slab
connecting device
light road
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009201024258U
Other languages
Chinese (zh)
Inventor
吴俊刚
王磊
马秀格
唐勇
李聚轩
程万里
沈昌礼
尹志刚
朱春蕊
牛红英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Military Transportation University of PLA
Haohua Zhongyi FRP Co Ltd
Original Assignee
Haohua Zhongyi FRP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Haohua Zhongyi FRP Co Ltd filed Critical Haohua Zhongyi FRP Co Ltd
Priority to CN2009201024258U priority Critical patent/CN201395757Y/en
Application granted granted Critical
Publication of CN201395757Y publication Critical patent/CN201395757Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model belongs to roadway equipment used in the field of traffic management support, and particularly relates to a fast-assembled light road slab connecting device matched by road slabs andused in inconvenient geological areas with mud, sand, and the like. The device comprises a mounting hole formed on the surface of each light road slab; connecting members penetrate the mounting holescorresponding to each other on the adjacent road slabs and are connected with each other; and each connecting member comprises a casing, a rotating shaft, a clamping plate, an axial positioning structure, and a spanner, wherein the casing is in sliding fit with the inner wall of the mounting hole, has the top part expanding out, and is clamped with the upper end of the inner hole of a pre-embedded sleeve, the rotating shaft is arranged in the inner cavity of the casing and has the periphery in the running fit with the casing, the clamping plate is fixed at the bottom end of the rotating shaft, the axial positioning structure is arranged the outer surface of the rotating shaft and the inner wall of the casing, and the spanner is connected with the top part of the rotating shaft. The fast-assembled light road slab connecting device solves the problems that the connecting device in the prior art can not realize fast assembly and disassembly and has poor reusability, and has the advantages of high assembling and disassembling speeds, manual operation facilitation, high work reliability, etc.

Description

Connecting device of fast-assembling light road slab
Affiliated technical field
The utility model belongs to the used pavement equipment in traffic support field, and particularly matter is regional for satisfying the supporting connecting device of fast-assembling light road slab of road slab that vehicle passes through unfriendly at mire, sandy beach etc.
Background technology
Especially along with modern national defense equipment to the raising of military traffic Combat Readiness Requirements and when tackling unpredictable natural calamity the requirement to emergency guarantee show that day by day countries in the world are all at the positive novel organic roadway equipment of development.Utility model patent 200520012913.1 discloses a kind of quick place mat engineering road slab that moves, its technical scheme is for there being the foursquare plastics making sheet piece of fillet around adopting, different plates are connect fixing by bolt, be shaped on cloudy connecting hole and fastener hole in two wherein adjacent fillets, be shaped on positive joint tongue in two adjacent in addition fillets, positive joint tongue matches with the cloudy connecting hole of other plates.The subject matter of this road slab scheme is that plate adopts positive joint tongue to cooperate insertion to add the method for bolt with cloudy connecting hole with the connection of plate, cloudy in actual applications connecting hole and bolt are screwed the match position and are easy to by sand and other Material cards dead, can not realize quickly dismantled, especially the damage of embedded nut button will cause the catastrophe failure of road slab.The connecting structure of this scheme is to connect the transmission load by only several metal embedded parts between plate and the plate in addition, promptly can not avoid bleeding (sand) to influence trafficability characteristic, can cause this built-in fitting to be subject to very much excessive bending load distortion again and cause the road slab fault.
Utility model patent 200420024253.4 discloses a kind of artificial pavement equipment with chain platy structure, its technical scheme is that polylith road slab and many chemical ﹠ blended fabric bands are formed by connecting, adjacent two block road plates are continuous by chemical ﹠ blended fabric band separately respectively, road slab is the flexible nonmetal material body, is suppressed with the high strength non-metal board in it.Though this patented technology adopts inside to be pressed with high-intensity carbon fibre reinforced thermoplastics non-metal board, the light weight of individual plates, intensity, rigidity height, but it connects employing chemical ﹠ blended fabric band one side and is embedded in the road slab, the method that opposite side adopts rivet to connect mutually, exist chemical ﹠ blended fabric not wear-resistant, connect and be soft band+rivet connection, not only can't transmit moment of flexure, the transmission of axle power is also limited, very easy formation rut, the repeatedly handling capacity of vehicle is poor, and the mutual match of rivet causes and is difficult to repeatedly dismounting use.
US Patent specification US6,685,388B2 discloses a kind of multipurpose plate, after adopting multifrnction connector should L shaped multipurpose plate to couple together, can satisfy in unstable landform and pass through vehicle.Typical technical scheme is made quadrangular plate for adopting the laminated glass steel, the slotted hole of the mechanism of on per two adjacent edges, having, be processed into recessed L shaped bead at adjacent opposite side, multifrnction connector is that corrosion resistant metal is made, be made of last lower plate and connecting bolt, it is locking that screw thread adopts liquid locking agent when connection is installed.Kit is centering instrument and guiding spacer block.This technical scheme is owing to adopt the laminated glass steel, have corrosion-resistant, lightweight characteristics, L shaped plate can realize being rigidly connected and effectively prevent general mud (sand) simultaneously, the lower protrusion but the road slab upper surface after it connects is concordant, cause the most of unsettled and connector lower protrusion of road slab, for the relatively poor and bearing capacity soil with high area of trafficability characteristic (as dehydration clay district, hard surfacing sidewalk zone etc.) cause road slab to damage easily, simultaneously its connector adopts to be threaded and is easy to can not be realized quickly dismantled by husky and other Material cards are dead.Because its design structure, the design thickness of sheet material is thinner in addition, is generally about 9mm and can not lays bilayer, improves bearing capacity, can not satisfy logical the carrying of vehicle of soft clay area and use.
The utility model content
The purpose of this utility model is to provide a kind of connecting device of fast-assembling light road slab of being convenient to quickly dismantled and can being repeatedly used.
Overall technology solution of the present utility model is:
Connecting device of fast-assembling light road slab, comprise the installing hole 311 that is opened in light road slab 308 surfaces, on the adjacent road slab 308 between the pairing installing hole 311 cross-under be connected with connecting elements, installing hole 311 inwalls are fixed with service sleeve 312, connecting elements comprises with installing hole 311 inwalls and being slidingly matched, and the top bulging and with the housing 300 of service sleeve 312 endoporus upper ends clamping, be arranged at the rotating shaft 301 that housing 300 inner chambers and periphery are rotatably assorted with it, and the clamp 304 that is fixed in rotating shaft 301 bottoms, be provided with axial positioning structure between rotating shaft 301 external surfaces and housing 300 inwalls, rotating shaft 301 tops are connected with spanner 306.
Concrete technical construction of the present utility model also has:
For realizing the axial location of rotating shaft 301 in housing 300, guarantee the functional reliability of linkage.Described axial location mechanism is including, but not limited to adopting routine techniques means or its combinations such as boss, draw-in groove, bearing pin, do not break away from essence of the present utility model, wherein optimal technical scheme is: comprise the annular boss that radially is provided with along rotating shaft 301 inwalls, the bulging reducing portion that rotating shaft 301 outer walls are disposed radially, this reducing portion are located at annular boss one side and clamp with it.
For reaching the smooth purpose that spanner 306 is easy to use when working, do not influence apparatus surface under off working state, the embedded structure of spanner 306 preferred employings.Wherein optimized technical scheme is: adaptive concavo-convex the cooperation adopted with spanner 306 bottoms in rotating shaft 301 tops, and the bottom of spanner 306 and rotating shaft 301 tops are rotatably assorted by upper pin 305.
For ease of the assembling of clamp 304 and rotating shaft 301 and realize interlock between the two, can adopt the connected mode of multiple easy disassembly between clamp 304 and the rotating shaft 301, as screw thread, bolt, alignment pin, bearing pin assembling etc., do not break away from essence of the present utility model, wherein preferred embodiment be: clamp 304 is fixed by lower bearing pin 307 and rotating shaft 301 bottom cross-under.
For guaranteeing to be connected reliably between service sleeve 312 and the installing hole 311, make the two be difficult for getting loose axially pressing down to produce under the external force effect, service sleeve 312 outer walls and installing hole 311 inwalls are adaptive cone structure.This cone structure can be selected pyramid or coniform structure for use.
Spanner 306 is unlikely under the effect of non-external force holds up rotation in order to make, thereby connecting elements and being connected of road slab are got loose, and rotating shaft 301 tops are hollow structure, is provided with elasticity vertically between its inside and spanner 306 roots and bumps the pearl structure.
The embedded structure of more preferred spanner 306 has: rotating shaft 301 tops offer first groove 313, and spanner 306 bottoms are adaptive concavo-convex the cooperation with this groove 313.
The endoporus of service sleeve 312 can pass through under off working state smoothly to satisfy housing 300, rotate to the permanent position with rotating shaft 301 under the duty after, clamp 304 can be realized being as the criterion with the clamping location of service sleeve 312 bottoms.Therefore, described service sleeve 312 endoporus are the post hole, and its radial section is a kind of or its combination in triangle, rectangle, circle, ellipse or other polygon.
For further guaranteeing the surface that is embedded in road slab 308 of spanner 306, described housing 300 tops radially offer second groove 314 adaptive with spanner 306 profiles.
The more preferred embedded design of spanner 306 also has: described installing hole 311 be a counterbore, can it is evident that, the degree of depth on these installing hole 311 tops and aperture should be can satisfy spanner 306 back embedded being as the criterion of realization smoothly in the hole of falling.
Substantive distinguishing features that the utility model is obtained and significant technological progress are:
The results showed:
1, under the action of static load, load is loaded into 80kN, and sample does not destroy, and the sample permanent set is in 0.4 millimeter after unloading, and unloading back linkage can for convenience detach and installation.
2, when repeated load test reached 30,000 times, sample did not destroy, and linkage can for convenience detach and installation.After repeated load test is finished, continue to be loaded into 100kN, sample does not destroy, and linkage can for convenience detach and installation.
3, in free-hand operation trials, the operating personnel that 6 people one group can lay in 1 hour and finish the long single width face 3600 broad way faces of 50m, showed free-hand operating feature.
4, in reliability testing, in the operational reliability test, laying in the dismounting operation relevant fault for once for 226 times, operational reliability is higher than 0.98.
5, at mire, sandy beach etc. unfriendly matter area lay difficulty that place and road run into tissue and technical elements than people's imagination seriously.For military traffic support, can organize laying fast, often determined army can satisfy the motor-driven requirement of modernized war mechanization.Adopt the road slab linkage of technical solutions of the utility model can adapt to various complex geological conditions and can free-hand operation, remedied the shortcoming that present military standard equipment can't operation in the area of some mechanization obstacle (as not possessing the mechanized environment), realized artificial and machinery ensures the traffic support strategy of laying equal stress on.In addition, solve carrying of hag face and the logical problem of carrying, do not exist only in wartime, in natural calamity, engineering construction at ordinary times, also exist in a large number.Also can run into the hag face in road (bridge) engineering, oil exploitation, city and fields such as power construction, coastal engineering.Adopt the technical solution of the utility model, can well the dual-use of pavement equipment be combined, make the road surface equipment can continuous updating, function is constantly perfect, also makes social recoverable amount, storage capacity among the people very high, lay a solid foundation for wartime is military.
Description of drawings
Accompanying drawing of the present utility model has:
Fig. 1 is the structural representation of linkage.
Fig. 2 is the B portion partial enlarged drawing of Fig. 1.
Fig. 3 is the connecting elements structural representation.
Fig. 4 is that the A-A of Fig. 1 is to view.
Fig. 5 is the connecting elements structural representation of spanner when opening.
Fig. 6 is the stereogram of connecting elements.
Fig. 7 is the pivot structure schematic diagram of connecting elements.
Fig. 8 is the shell structure schematic diagram in the connecting elements.
The specific embodiment
Accompanying drawing has provided embodiment of the present utility model, below in conjunction with accompanying drawing embodiment of the present utility model is further described, but not as to qualification of the present utility model.
The unitary construction of present embodiment as shown, comprising the installing hole 311 that is opened in light road slab 308 surfaces, on the adjacent road slab 308 between the pairing installing hole 311 cross-under be connected with connecting elements, installing hole 311 inwalls are adhesively fixed with service sleeve 312, connecting elements comprises with installing hole 311 inwalls and being slidingly matched, and the top bulging and with the housing 300 of service sleeve 312 endoporus upper ends clamping, be arranged at the rotating shaft 301 that housing 300 inner chambers and periphery are rotatably assorted with it, and the clamp 304 that is fixed in rotating shaft 301 bottoms, be provided with axial positioning structure between rotating shaft 301 external surfaces and housing 300 inwalls, rotating shaft 301 tops are connected with spanner 306.
Axial location mechanism comprises the annular boss that radially is provided with along rotating shaft 301 inwalls, and the bulging reducing portion that rotating shaft 301 outer walls are disposed radially, this reducing portion are located at annular boss one side and clamp with it.
Adaptive concavo-convex the cooperation adopted with spanner 306 bottoms in rotating shaft 301 tops, and the bottom of spanner 306 and rotating shaft 301 tops are rotatably assorted by upper pin 305.
Clamp 304 is a rectangle, and clamp 304 is fixed by lower bearing pin 307 and rotating shaft 301 bottom cross-under.
Service sleeve 312 outer walls and installing hole 311 inwalls are adaptive cone-shaped structure.
Rotating shaft 301 tops are hollow structure, are provided with elasticity vertically between its inside and spanner 306 roots and bump the pearl structure.This elasticity is bumped the pearl structure and is comprised the steel ball of being controlled by spring 303 302.
Rotating shaft 301 tops offer first groove 313, and spanner 306 bottoms are circular arc and are adaptive concavo-convex the cooperation with this groove 313.
Service sleeve 312 endoporus are the post hole, and its radial section is a rectangle.
Housing 300 tops radially offer second groove 314 adaptive with spanner 306 profiles.
Described installing hole 311 is a counterbore, and embedded being as the criterion should be realized smoothly can satisfy spanner 306 back of falling in the degree of depth on these installing hole 311 tops and aperture in the hole.

Claims (10)

1, connecting device of fast-assembling light road slab, comprise the installing hole (311) that is opened in light road slab (308) surface, cross-under is connected with connecting elements between the last pairing installing hole (311) of adjacent road slab (308), it is characterized in that installing hole (311) inwall is fixed with service sleeve (312), connecting elements comprises and installing hole (311) inwall is slidingly matched, and the top bulging and with the housing (300) of service sleeve (312) endoporus upper end clamping, be arranged at the rotating shaft (301) that housing (300) inner chamber and periphery are rotatably assorted with it, and the clamp (304) that is fixed in rotating shaft (301) bottom, be provided with axial positioning structure between rotating shaft (301) external surface and housing (300) inwall, rotating shaft (301) top is connected with spanner (306).
2, connecting device of fast-assembling light road slab according to claim 1, it is characterized in that described axial location mechanism comprises the annular boss that radially is provided with along rotating shaft (301) inwall, the bulging reducing portion that rotating shaft (301) outer wall is disposed radially, this reducing portion are located at annular boss one side and clamp with it.
3, connecting device of fast-assembling light road slab according to claim 1, it is characterized in that described rotating shaft (301) top and spanner (306) bottom adaptive concavo-convex cooperation of employing, the bottom of spanner (306) and rotating shaft (301) top are rotatably assorted by upper pin (305).
4, connecting device of fast-assembling light road slab according to claim 1 is characterized in that described clamp (304) fixes by lower bearing pin (307) and rotating shaft (301) bottom cross-under.
5, connecting device of fast-assembling light road slab according to claim 1 is characterized in that described service sleeve (312) outer wall and installing hole (311) inwall are adaptive cone structure.
6, connecting device of fast-assembling light road slab according to claim 3 is characterized in that described rotating shaft (301) top is hollow structure, is provided with elasticity vertically between its inside and spanner (306) root and bumps the pearl structure.
7, connecting device of fast-assembling light road slab according to claim 3 is characterized in that described rotating shaft (301) top offers first groove (313), and spanner (306) bottom is adaptive concavo-convex the cooperation with this groove (313).
8, connecting device of fast-assembling light road slab according to claim 1 or 5 is characterized in that described service sleeve (312) endoporus is the post hole, and its radial section is a kind of or its combination in triangle, rectangle, circle, ellipse or other polygon.
9,, it is characterized in that described housing (300) top radially offers and adaptive second groove (314) of spanner (306) profile according to claim 1 or 3 described connecting device of fast-assembling light road slab.
10, connecting device of fast-assembling light road slab according to claim 1 or 5 is characterized in that described installing hole (311) is a counterbore.
CN2009201024258U 2009-04-22 2009-04-22 Fast-assembled light road slab connecting device Expired - Fee Related CN201395757Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009201024258U CN201395757Y (en) 2009-04-22 2009-04-22 Fast-assembled light road slab connecting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009201024258U CN201395757Y (en) 2009-04-22 2009-04-22 Fast-assembled light road slab connecting device

Publications (1)

Publication Number Publication Date
CN201395757Y true CN201395757Y (en) 2010-02-03

Family

ID=41618260

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009201024258U Expired - Fee Related CN201395757Y (en) 2009-04-22 2009-04-22 Fast-assembled light road slab connecting device

Country Status (1)

Country Link
CN (1) CN201395757Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101532274B (en) * 2009-04-22 2011-08-03 中国人民解放军军事交通学院 Connecting device of fast-assembling light road slab

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101532274B (en) * 2009-04-22 2011-08-03 中国人民解放军军事交通学院 Connecting device of fast-assembling light road slab

Similar Documents

Publication Publication Date Title
EP3683384B1 (en) A tent peg and the processing method thereof
CN106193643A (en) A kind of Prestressed CFRP plate stretching and anchoring device of reinforcing steel beam and combination beam
CN103206228A (en) Flexible segment for shield tunnel
CN201395757Y (en) Fast-assembled light road slab connecting device
CN101532274B (en) Connecting device of fast-assembling light road slab
CN110984131A (en) Prefabricated assembled underground continuous wall king-shaped connector structure
CN210013139U (en) Highway bridge pile foundation reinforcing apparatus
CN101538824B (en) Emergency road slab made of composite material and mounting method thereof
CN211468705U (en) Rope making device
CN203130105U (en) Flexible pipe piece for shield tunnel
CN206090296U (en) A but, self -modulation structure that is used for cast -in -place articulated seam of prefabricated plate -girder
CN206512752U (en) A kind of town road structure at inspection shaft
CN108979008A (en) Grout sleeve
CN201411611Y (en) Composite light rigid pavement slab
CN201156906Y (en) Lawn protection mat
CN206359875U (en) A kind of current structure waterborne
CN201952890U (en) Well cleaning spade
CN2654780Y (en) Anticorrusion frozen cracking proof reinforced concrete electrical pole
RU202683U1 (en) Inventory screw pile anchor for securing floating bridges at shallow depths
CN216615548U (en) Automatic walking type culvert trolley
CN201020804Y (en) Fiber rib prestressed anchor unit and its fiber rib prestressed anchor
CN2554221Y (en) Quick assembling bridge
CN108411927B (en) Improved foundation pit cofferdam of ultra-long steel sheet pile
CN217811501U (en) Stable road gutter inlet reinforcing structure
CN220749242U (en) Rain sewage pipeline laying structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: INSTITUTE OF MILITARY TRAFFIC INSTITUTE OF PLA

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20100525

Address after: 050091 No. 198 West South Road, Shijiazhuang, Hebei

Co-patentee after: College of Military Traffic, PLA

Patentee after: Haohua Zhongyi GFRP Co., Ltd.

Address before: 050091 No. 198 West South Road, Shijiazhuang, Hebei

Patentee before: Haohua Zhongyi GFRP Co., Ltd.

ASS Succession or assignment of patent right

Owner name: HAOHUA ZHONGYI FRP CO., LTD.

Free format text: FORMER OWNER: COLLEGE OF MILITARY TRAFFIC, PLA

Owner name: COLLEGE OF MILITARY TRAFFIC, PLA

Free format text: FORMER OWNER: HAOHUA ZHONGYI FRP CO., LTD.

Effective date: 20110201

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Li Juxuan

Inventor after: Niu Hongying

Inventor after: Wu Jungang

Inventor after: Wang Lei

Inventor after: Ma Xiuge

Inventor after: Tang Yong

Inventor after: Cheng Wanli

Inventor after: Shen Changli

Inventor after: Yin Zhigang

Inventor after: Zhu Chunrui

Inventor before: Wu Jungang

Inventor before: Niu Hongying

Inventor before: Wang Lei

Inventor before: Ma Xiuge

Inventor before: Tang Yong

Inventor before: Li Juxuan

Inventor before: Cheng Wanli

Inventor before: Shen Changli

Inventor before: Yin Zhigang

Inventor before: Zhu Chunrui

COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 050091 NO.198, WEST RING SOUTH ROAD, SHIJIAZHUANG CITY, HEBEI PROVINCE TO: 300161 NO.1, DONGJUZI, HEDONG DISTRICT, TIANJIN

Free format text: CORRECT: INVENTOR; FROM: WU JUNGANG WANG LEI MA XIUGE TANG YONG LI JUXUAN CHENG WANLI SHEN CHANGLI YIN ZHIGANG ZHU CHUNRUI NIU HONGYING TO: LI JUXUAN WU JUNGANG WANG LEI MA XIUGE TANG YONG CHENG WANLI SHEN CHANGLI YIN ZHIGANG ZHU CHUNRUI NIU HONGYING

TR01 Transfer of patent right

Effective date of registration: 20110201

Address after: 300161 Tianjin City Hedong District No. 1 East Station

Co-patentee after: Haohua Zhongyi GFRP Co., Ltd.

Patentee after: College of Military Traffic, PLA

Address before: 050091 No. 198 West South Road, Shijiazhuang, Hebei

Co-patentee before: College of Military Traffic, PLA

Patentee before: Haohua Zhongyi GFRP Co., Ltd.

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100203

Termination date: 20110422