CN201390972Y - Foundation bolt hole embedded device of concrete prefabricated assembly tower crane - Google Patents

Foundation bolt hole embedded device of concrete prefabricated assembly tower crane Download PDF

Info

Publication number
CN201390972Y
CN201390972Y CN200920035818U CN200920035818U CN201390972Y CN 201390972 Y CN201390972 Y CN 201390972Y CN 200920035818 U CN200920035818 U CN 200920035818U CN 200920035818 U CN200920035818 U CN 200920035818U CN 201390972 Y CN201390972 Y CN 201390972Y
Authority
CN
China
Prior art keywords
hole
embedded device
bolt hole
side template
base box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN200920035818U
Other languages
Chinese (zh)
Inventor
从卫民
钱红
徐玉健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Xinta Construction New Technology Development Co., Ltd.
Original Assignee
Jiangsu Suzhong Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Suzhong Construction Group Co Ltd filed Critical Jiangsu Suzhong Construction Group Co Ltd
Priority to CN200920035818U priority Critical patent/CN201390972Y/en
Application granted granted Critical
Publication of CN201390972Y publication Critical patent/CN201390972Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The utility model discloses a foundation bolt hole embedded device of a concrete prefabricated assembly tower crane. The embedded device comprises bolt hole embedded stand pipes and an operating hole embedded base box, wherein the base box is communicated with a bolt hole and is of a round table body or a prismatic table body; the axial two ends of the base box are connected with a side template by a connecting rod, and the upper surface thereof is provided with connecting jacks of the embedded stand pipes; the embedded stand pipe is of a round table body, the upper ends of the embedded stand pipes are connected with the side template by a fixing frame, and the lower ends thereof are inserted in to the jacks. The embedded device is designed into an assembly-disassembly way and can be reused by multiple times, thereby saving resource and lowering basic manufacturing cost. More importantly, the embedded device can not be deformed due to the vibration, extrusion and shifting when in pouring for a prefabricated part, thereby ensuring the prefabricated quality of the bolt hole of the prefabricated part.

Description

The prefabricated dress foundation for tower crane bolt hole pre-embedded device of abandoning of concrete
Technical field:
The utility model relates to building machinery and installs and fixes the basis, is specifically related to the prefabricated dress foundation for tower crane bolt hole pre-embedded device of abandoning of concrete.
Background technology:
Prefabricated the prefabricated of dress foundation for tower crane bolt hole of abandoning of concrete, all the time, all be that the pre-buried standpipe of bolt pore and the pre-buried base box of handle hole of bolt pore lower end are designed to integral body, be positioned over relevant position in the reinforcing cage (and do necessary be connected with reinforcing cage), in the prefabricated component casting process,, and make it lose use value often because of reasons such as vibration, extruding cause built-in fitting displacement or distortion, cause unnecessary waste, increased the manufacturing cost of foundation for tower crane.Simultaneously, all the time, all be with pre-buried standpipe and base box as the part of prefabricated component, also cause certain waste.
Summary of the invention:
The technical problems to be solved in the utility model provides the prefabricated dress foundation for tower crane bolt hole pre-embedded device of abandoning of a kind of concrete, in the casting process of prefabricated component, can not be shifted, be out of shape, and pre-embedded device is reusable, and the prefabricated cost of foundation for tower crane is low.
The utility model is achieved through the following technical solutions:
The prefabricated dress foundation for tower crane bolt hole pre-embedded device of abandoning of concrete, the pre-buried standpipe that comprises the bolt pore, the pre-buried base box of the handle hole that is communicated with the bolt pore, described base box is Rotary-table or prismoid, axially two ends are connected with side template by connecting rod, and its upper surface is provided with the connection jack of pre-buried standpipe; Pre-buried standpipe is Rotary-table, and the upper end of pre-buried standpipe is connected with side template by fixed mount, and insert in the described jack lower end.
Described connecting rod is a screw rod, is fixed on the two ends of base box, and the side template relevant position is provided with the connecting hole that is complementary, and connecting rod passes the side template connecting hole and is connected and fixed; Or the base box axially is provided with through hole, and the connecting rod two ends pass through hole, pass the set connecting hole of side template again and are connected and fixed.
The utility model compared with prior art has obvious advantage.
One, the utility model is designed to assembling, detachable, pre-buried standpipe, base box all be Rotary-table or prismoid, after prefabricated component solidifies, can remove and being connected of template, extract pre-buried standpipe out prefabricated component earlier, extract the base box out prefabricated component again, can repeat repeatedly to use, save resource, reduce basic cost.
Two, the utility model adopts metal material to make, and is connected with template by connecting rod etc., has the advantages that to be connected firmly, and the vibration in the time of not poured into a mould by prefabricated component, extruding and be shifted, be out of shape have guaranteed the prefabricated quality of prefabricated component bolt hole.
Description of drawings:
Fig. 1 is the utility model schematic perspective view.
The specific embodiment:
As shown in Figure 1, the utility model comprises the pre-buried standpipe 1 of bolt pore, the pre-buried base box 2 of the handle hole that is communicated with the bolt pore.
Still as shown in Figure 1, base box 2 is prismoid, and axially two ends are connected with side template (the side template diagram is not provided) by connecting rod 3.Described connecting rod 3 is a screw rod, is fixed on the two ends of base box 2, and the side template relevant position is provided with the connecting hole that is complementary, and connecting rod 3 passes the side template connecting hole and is connected and fixed.Still as shown in Figure 1, base box 2 upper surfaces are provided with the connection jack 4 of pre-buried standpipe 1.
Still as shown in Figure 1, pre-buried standpipe 1 is Rotary-table, (among the figure shown in the arrow) inserted in the jack 3 of base box in the lower end, its upper end is provided with connecting screw rod (6), pre-buried standpipe 1 is connected in fixed mount (5) by connecting screw rod (6), limit, the two ends of fixed mount (5) and side template upper end is provided with the hole 7 that is complementary, and the two ends of fixed mount 5 are pressed on limit, side template upper end, passes hole 7 with bolt both are connected and fixed.
In the present embodiment, pre-buried standpipe 1, base box 2 are selected metal material for use.

Claims (4)

1, the prefabricated dress foundation for tower crane bolt hole pre-embedded device of abandoning of concrete, the pre-buried standpipe (1) that comprises the bolt pore, the pre-buried base box of the handle hole that is communicated with the bolt pore (2), it is characterized in that: described base box (2) is Rotary-table or prismoid, axially two ends are connected with side template by connecting rod (3), and its upper surface is provided with the connection jack (4) of pre-buried standpipe (1); Pre-buried standpipe (1) is Rotary-table, and the upper end of pre-buried standpipe (1) is connected with side template by fixed mount (5), and insert in the described jack (3) lower end.
2, the prefabricated dress foundation for tower crane bolt hole pre-embedded device of abandoning of concrete as claimed in claim 1, it is characterized in that: described connecting rod (3) is a screw rod, be fixed on the two ends of base box (2), the side template relevant position is provided with the connecting hole that is complementary, and connecting rod (3) passes the side template connecting hole and is connected and fixed; Or base box (2) axially is provided with through hole, and connecting rod (3) two ends pass through hole, pass the set connecting hole of side template again and are connected and fixed.
3, the prefabricated dress foundation for tower crane bolt hole pre-embedded device of abandoning of concrete as claimed in claim 1, it is characterized in that: pre-buried standpipe (1) is connected with fixed mount (5) by the connecting screw rod (6) that the upper end is provided with, the two ends of fixed mount (5) and limit, side template upper end are provided with the hole (7) that is complementary, the two ends of fixed mount (5) are pressed on limit, side template upper end, pass hole (7) with bolt both are connected and fixed.
4, the prefabricated dress foundation for tower crane bolt hole pre-embedded device of abandoning of concrete as claimed in claim 1, it is characterized in that: pre-buried standpipe (1), base box (2) are metal material.
CN200920035818U 2009-03-02 2009-03-02 Foundation bolt hole embedded device of concrete prefabricated assembly tower crane Expired - Fee Related CN201390972Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200920035818U CN201390972Y (en) 2009-03-02 2009-03-02 Foundation bolt hole embedded device of concrete prefabricated assembly tower crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200920035818U CN201390972Y (en) 2009-03-02 2009-03-02 Foundation bolt hole embedded device of concrete prefabricated assembly tower crane

Publications (1)

Publication Number Publication Date
CN201390972Y true CN201390972Y (en) 2010-01-27

Family

ID=41597795

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200920035818U Expired - Fee Related CN201390972Y (en) 2009-03-02 2009-03-02 Foundation bolt hole embedded device of concrete prefabricated assembly tower crane

Country Status (1)

Country Link
CN (1) CN201390972Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103741709A (en) * 2014-01-09 2014-04-23 武汉竹安工程设备管理有限公司 Embedded bolt mold for tower crane
CN106759479A (en) * 2016-12-30 2017-05-31 宁夏众力管廊科技有限公司 A kind of city integrated piping lane hoisting ring device
CN110195473A (en) * 2019-05-06 2019-09-03 江苏筑原建筑设计有限公司 A kind of built-in bolt sleeve and its manufacture craft

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103741709A (en) * 2014-01-09 2014-04-23 武汉竹安工程设备管理有限公司 Embedded bolt mold for tower crane
CN103741709B (en) * 2014-01-09 2016-06-29 武汉竹安工程设备管理有限公司 A kind of tower crane pre-embedded bolt mould
CN106759479A (en) * 2016-12-30 2017-05-31 宁夏众力管廊科技有限公司 A kind of city integrated piping lane hoisting ring device
CN106759479B (en) * 2016-12-30 2020-09-04 宁夏众力管廊科技有限公司 City utility tunnel rings device
CN110195473A (en) * 2019-05-06 2019-09-03 江苏筑原建筑设计有限公司 A kind of built-in bolt sleeve and its manufacture craft

Similar Documents

Publication Publication Date Title
CN201390972Y (en) Foundation bolt hole embedded device of concrete prefabricated assembly tower crane
CN107571389B (en) Detachable and reusable wallboard hanging device
CN203541446U (en) Novel riser neck-down sheet
CN102561694B (en) Construction method for support mould with large-curvature spherical concrete structure
CN200940346Y (en) Support mould for pipeline mounting and filling holes
CN205058278U (en) Locating component of pre -buried line box among prefabricated component
CN210767852U (en) Reusable floor slab preformed hole die
CN209775091U (en) pre-buried positioner of prefabricated component production
CN201225006Y (en) Clamp special for beam formwork
CN202399389U (en) Positioning ring for protruding bar of prefabricated component
CN201288419Y (en) Internal stay casing tube for concrete wall thickness support
CN205497769U (en) Impervious test block shedder of concrete
CN212288076U (en) Tool applied to groove pressing of mass production of concrete prefabricated parts
CN201386390Y (en) Cast-in-site concrete floor-slab preformed hole sleeve
CN205112084U (en) Spool goes out wall interface module among prefabricated component
CN211948528U (en) Steel column concrete design mould
CN216230060U (en) Hoisting sleeve fixing part for prefabricated part
CN220576228U (en) Prefabricated building component pore-forming die and die bench
CN220487109U (en) Split type water pipe reserved hole die
CN220313662U (en) Assembled type opposite-perforating tool
CN215670166U (en) Device for plugging split bolt holes of concrete wall
CN110900797B (en) Manufacturing process of reserved PC wire pipe wiring hole of PC prefabricated part
CN220814935U (en) Aluminum die split bolt sleeve dismantling device
CN217597404U (en) Detachable and reusable prefabricated wallboard support die hole preformed hole combined tool
CN220377836U (en) Municipal administration lighting works hand hole well quick detach steel form structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: JIANGSU XINTA JIYE NEW CONSTRUCTION TECHNOLOGY DEV

Free format text: FORMER OWNER: JIANGSU SUZHONG CONSTRUCTION GROUP CO., LTD.

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20110530

Address after: 223002 Huaian City, Jiangsu Province Institute of Surveying and mapping in Qingpu District Xinmin Road

Co-patentee after: Jiangsu Xinta Construction New Technology Development Co., Ltd.

Patentee after: Cong Weimin

Address before: 223002 Huaian City, Jiangsu Province Institute of Surveying and mapping in Qingpu District Xinmin Road

Co-patentee before: Jiangsu Suzhong Construction Group Co., Ltd.

Patentee before: Cong Weimin

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100127

Termination date: 20180302

CF01 Termination of patent right due to non-payment of annual fee