CN201386370Y - Large-capacity wiring netfloor - Google Patents

Large-capacity wiring netfloor Download PDF

Info

Publication number
CN201386370Y
CN201386370Y CN200920105555U CN200920105555U CN201386370Y CN 201386370 Y CN201386370 Y CN 201386370Y CN 200920105555 U CN200920105555 U CN 200920105555U CN 200920105555 U CN200920105555 U CN 200920105555U CN 201386370 Y CN201386370 Y CN 201386370Y
Authority
CN
China
Prior art keywords
floor
board block
floor board
routing network
big capacity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN200920105555U
Other languages
Chinese (zh)
Inventor
蔡国辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN200920105555U priority Critical patent/CN201386370Y/en
Application granted granted Critical
Publication of CN201386370Y publication Critical patent/CN201386370Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Floor Finish (AREA)

Abstract

A large-capacity wiring netfloor comprises a plurality of brackets arranged as a rectangular array and a plurality of floor blocks that are spliced together and provided with four corners fixed or overlapped on the brackets, wherein the floor blocks are metal thin floor blocks; and a reinforcing supporting frame is further arranged below the floor blocks, thus providing a wiring netfloor with thinner floor surface, higher wire trunking height, larger routing space and cost-saving property.

Description

Big capacity routing network floor
Technical field
The utility model relates to a kind of floor, particularly a kind of net floor that is used for office or the wiring of machine room bottom.
Background technology
At present, office in the office premises or machine room are under net floor during laying-out, floor is high together with the bottom of door behind net floor, and the existing network floor is thicker, takies the space of bottom wire casing, makes the height of wire casing part spend short, increase the height of wire casing if desired, have only the height that upwards improves the floor, can cause floor not contour like this, increase the cabling space inconvenience of wire casing with the bottom of door.Its structure as shown in Figure 1, floor 1 inner filling concrete 2, make floor 1 itself is very thick, stronger weight capacity can be arranged, before the floor is installed, wire casing 3 is set on the ground, in wire casing 3, lay cable 4, and mounting bracket 5 on the ground, the top of support 5 is " ten " font projection 6, when floor 1 is installed, the edge on floor 1 is put on the carriage of " ten " font projection 6 bottoms, floor 1 is provided with screw hole with the carriage of " ten " font projection 6 bottoms, can the carriage of floor 1 with " ten " font projection 6 bottoms be tightened with screw 7.
The utility model content
At the defective of above-mentioned prior art, the purpose of this utility model provides that a kind of plate face is thinner, and the wire casing height is higher, and cabling space is bigger, saves the routing network floor of cost.
A kind of big capacity routing network floor, comprise that several are arranged to the support of rectangular array, with some be stitched together and Corner Strapped or ride over floor board block on the described support, described floor board block is the metal foil floor board block, also is provided with the reinforcement bracing frame below described floor board block.
Big capacity routing network of the present utility model floor, wherein said reinforcement bracing frame comprises the sleeve that is fixed on described floor board block soffit, and lead screw, clamp nut, and be provided with adjustment hole being fixed with on the described floor board block of described sleeve, the upper end of described lead screw is provided with binding groove, described lead screw screws in described clamp nut and described sleeve is fastening, and fastens described lead screw with described clamp nut.
Big capacity routing network of the present utility model floor, wherein said reinforcement bracing frame is separately positioned on the middle part on four limits of described floor board block and the center of floor board block, perhaps is symmetricly set on the submarginal both sides of floor board block longitudinal central axis line, and two rows are set respectively.
Big capacity routing network of the present utility model floor, wherein said unfertile land plate is that steel plate is made.
Big capacity routing network of the present utility model floor, the size of wherein said floor board block is identical with standard network floor size.
Since this utility model since floor board block than existing network floor thin thickness, therefore, the height of wire casing promptly than the high 2cm of existing wire casing height to 3cm, thereby make the cabling capacity become big, raising cabling capacity 40%; Floor board block and existing network floor are big equally again, and support also adopts identical support, can carry out mutual alternative with the existing network floor and use, and have saved cost.
Description of drawings
Fig. 1 is the schematic diagram on existing network floor;
Fig. 2 is the schematic diagram on the big capacity routing network of the utility model floor;
Fig. 3 is the stereogram on the big capacity routing network of the utility model floor;
Fig. 4 is the assembling schematic diagram that bracing frame is strengthened on the big capacity routing network of the utility model floor;
Fig. 5 is the decomposing schematic representation that bracing frame is strengthened on the big capacity routing network of the utility model floor;
Fig. 6 a is the big capacity routing network of a utility model floor adjustment hole distribution schematic diagram;
Fig. 6 b is the adjustment hole distribution schematic diagram of big capacity routing network another embodiment of floor of the utility model.
The specific embodiment
Be elaborated below in conjunction with the embodiment of accompanying drawing to the big capacity routing network of the utility model floor.
Referring to Fig. 2, Fig. 3, big capacity routing network of the present utility model floor, comprise several supports that is arranged to rectangular array 55, with some be stitched together and the floor board block 11 of Corner Strapped on support 55, the size of floor board block 11 is identical with legacy network floor panel face size, adopts the steel plate of superpower carrying, and thickness is 2mm to 4mm, can replace mutually with the legacy network floor in use, not need to change existing support.Before the floor is installed, wire casing 33 is set on the ground, in wire casing 33, lay cable 44, and mounting bracket 55 on the ground, this support 55 is identical with existing support, the top of support 55 is " ten " font projection 66, when floor board block 11 is installed, the edge of floor board block 11 is ridden on " ten " font projection 66, floor board block 11 is provided with screw hole with the carriage of " ten " font projection 66 bottoms, can the carriage of floor board block 11 with " ten " font projection 66 bottoms be tightened with screw 77, perhaps tighten, only floor board block 11 be ridden on " ten " font projection without screw 77.Support with strengthening bracing frame 8 respectively at the middle part on 11 4 limits of floor board block and the center of floor board block 11, perhaps Dui Cheng submarginal both sides at floor board block 11 longitudinal central axis lines, two rows are set respectively, row near the edge is provided with a reinforcement bracing frame 8, another row is provided with three reinforcement bracing frames 8, is used to strengthen whole bearing capacity.
Referring to Fig. 2, Fig. 4, Fig. 5, strengthen the sleeve 81 that bracing frame 8 comprises welding or is riveted on floor board block 11 soffits, and lead screw 83, clamp nut 82, and have on the floor board block 11 of sleeve 81 in welding or riveted joint and to be provided with adjustment hole 9, the upper end of lead screw 83 is provided with binding groove 84, and lead screw 83 screws in clamp nuts 82 and fastening with sleeve 81, adjustment hole 9 from floor board block 11 settings, with the height of screwdriver set screw bar, regulate height after, fasten lead screw 83 with clamp nut 82.The binding groove 84 of lead screw 83 upper ends is " ten " word groove or " one " word groove.
Referring to Fig. 6 a, it is identical with the position of strengthening bracing frame 8 that adjustment hole 9a is provided with, and promptly is provided with five respectively at the middle part on four limits of floor board block 11a and the center of floor board block 11a.
Referring to Fig. 6 b, adjustment hole 9b symmetry in the submarginal both sides of floor board block 11b longitudinal central axis line, two rows are set respectively, near the edge one row an adjustment hole 9b is set, another row is provided with three adjustment hole 9b.
When using the big capacity routing network of the utility model floor, support 55, wire casing 33 are set on the ground with cable 44, from being arranged on the floor board block 11 adjustment hole 9 corresponding to sleeve 81, use screwdriver lead screw 83 rotations to be placed on the ground by binding groove 84, after regulating height, plate 11 turningly, with clamp nut 82 locking screw screw mandrels 83, floor board block 11 usefulness screws 77 are fixed on the support 55 get final product at last.
Since this utility model since floor board block than existing network floor thin thickness, therefore, the height of wire casing promptly than the high 2cm of existing wire casing height to 3cm, thereby make the cabling capacity become big, raising cabling capacity 40%; Floor board block and existing network floor are big equally again, and support also adopts identical support, can carry out mutual alternative with the existing network floor and use, and have saved cost.
Above embodiment is described preferred implementation of the present utility model; be not that scope of the present utility model is limited; under the prerequisite that does not break away from the utility model design spirit; various distortion and improvement that the common engineers and technicians in this area make the technical solution of the utility model all should fall in the definite protection domain of claims of the present utility model.

Claims (5)

1. one kind big capacity routing network floor, comprise that several are arranged to the support of rectangular array (55), with some be stitched together and Corner Strapped or ride over floor board block (11) on the described support (55), it is characterized in that, described floor board block (11) is the metal foil floor board block, also is provided with to strengthen bracing frame (8) below described floor board block (11).
2. big capacity routing network according to claim 1 floor, it is characterized in that, described reinforcement bracing frame (8) comprises the sleeve (81) that is fixed on described floor board block (11) soffit, and lead screw (83), clamp nut (82), and be provided with adjustment hole (9) being fixed with on the described floor board block (11) of described sleeve (81), the upper end of described lead screw (83) is provided with binding groove (84), it is fastening with described sleeve (81) that described lead screw (83) screws in described clamp nut (82), and fasten described lead screw (83) with described clamp nut (82).
3. big capacity routing network according to claim 2 floor, it is characterized in that, described reinforcement bracing frame (8) is separately positioned on the middle part on (11) four limits of described floor board block and the center of floor board block (11), perhaps be symmetricly set on the submarginal both sides of floor board block (11) longitudinal central axis line, two rows are set respectively.
4. big capacity routing network according to claim 3 floor is characterized in that described floor board block (11) is made for steel plate.
5. big capacity routing network according to claim 4 floor is characterized in that the size of described floor board block (11) is identical with standard network floor size.
CN200920105555U 2009-02-24 2009-02-24 Large-capacity wiring netfloor Expired - Fee Related CN201386370Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200920105555U CN201386370Y (en) 2009-02-24 2009-02-24 Large-capacity wiring netfloor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200920105555U CN201386370Y (en) 2009-02-24 2009-02-24 Large-capacity wiring netfloor

Publications (1)

Publication Number Publication Date
CN201386370Y true CN201386370Y (en) 2010-01-20

Family

ID=41578899

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200920105555U Expired - Fee Related CN201386370Y (en) 2009-02-24 2009-02-24 Large-capacity wiring netfloor

Country Status (1)

Country Link
CN (1) CN201386370Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106157795A (en) * 2016-08-26 2016-11-23 江苏建筑职业技术学院 Anti-static movable floor model and preparation method
CN106869449A (en) * 2017-04-07 2017-06-20 帷森(厦门)建材工业有限公司 A kind of net floor system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106157795A (en) * 2016-08-26 2016-11-23 江苏建筑职业技术学院 Anti-static movable floor model and preparation method
CN106869449A (en) * 2017-04-07 2017-06-20 帷森(厦门)建材工业有限公司 A kind of net floor system

Similar Documents

Publication Publication Date Title
CA2939994C (en) Apparatus and method for equipment mounting and storage
CN201766793U (en) General stand for machine cabinet
CN204697450U (en) A kind of composite type UPS cabinet framework
CN206498616U (en) A kind of communication equipment base of dimension adjustable
CN201386370Y (en) Large-capacity wiring netfloor
CN201946654U (en) Detachable battery rack
CN204059960U (en) A kind of cast-in-situ stair shaping steel die plate
CN110911978B (en) Spliced type preassembled box-type transformer substation and installation method thereof
CN207092532U (en) A kind of combined type joist mould bases
CN105576574A (en) Rack and secondary equipment prefabricating cabin employing same
CN205049783U (en) Optical fiber distribution case
CN201742508U (en) Guide rail for communication frame and communication frame
CN217932958U (en) Comprehensive wiring training equipment
CN201467597U (en) Electric cubicle pre-wiring tool
CN207339159U (en) Marine GRP cable tray
CN201773694U (en) Transformer terminal box mounting platform
CN202712289U (en) Battery rack
CN217680472U (en) Environment-friendly energy-saving spliced aluminum alloy template
CN213426062U (en) Movable solar panel support
CN201243432Y (en) Communication cabinet
CN218102324U (en) Cable laying support
CN110418539A (en) A kind of server
CN216217948U (en) Equipment cabinet
CN221126674U (en) Strong and weak electric box installation device
CN219240994U (en) Intelligent structure curtain that facilitates connection

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100120

Termination date: 20130224