CN201381328Y CN200920101971U CN200920101971U CN201381328Y CN 201381328 Y CN201381328 Y CN 201381328Y CN 200920101971 U CN200920101971 U CN 200920101971U CN 200920101971 U CN200920101971 U CN 200920101971U CN 201381328 Y CN201381328 Y CN 201381328Y
Authority
CN
China
Prior art keywords
tank body
tank
outer walls
steel slag
trunnion base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN200920101971U
Other languages
Chinese (zh)
Inventor
彭兆丰
贾国生
李付俊
赵志军
范玉新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Iron and Steel Group Co Ltd
Hangang Group Hanbao Iron and Steel Co Ltd
Original Assignee
Hebei Iron and Steel Group Co Ltd
Hangang Group Hanbao Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Iron and Steel Group Co Ltd, Hangang Group Hanbao Iron and Steel Co Ltd filed Critical Hebei Iron and Steel Group Co Ltd
Priority to CN200920101971U priority Critical patent/CN201381328Y/en
Application granted granted Critical
Publication of CN201381328Y publication Critical patent/CN201381328Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

An improved steel slag tank belongs to the technical field of steel making equipment and has high strength, fine safety, easy manufacturing and low manufacturing cost. The improved steel slag tank comprises a tank body, trunnions and a tipping device, wherein the tank body is a polygon cone formed by welding a plurality of trapezoidal steel plates, the large end of the cone is an opening of the tank body while the small end is the bottom end of the tank body, the bottom of the tank is mounted on the inner side of the bottom end, outer walls of two sides of the opening of the tank body are fixedly connected with a trunnion base which is connected with a main vertical rib plate via a pivot, two sides of the trunnion base are provided with reinforcing vertical rib plates connected with the trunnion base and the outer walls of the tank body, the outer walls of the tank body are provided with horizontal reinforcing ribs surrounding the tank body, and the horizontal reinforcing ribs are closely fixedly connected with the outer walls of the tank body. The trunnion base and a main structural steel plate of the tank body are integrally stably fixed, thereby being capable of guaranteeing using safety and preventing loosening of the trunnions when stressed. The tank body is processed by utilizing the welding technique, is convenient in construction, reduces manufacturing difficulty without manufacturing molds, greatly shortens manufacturing period and greatly reduces manufacturing cost.

Description

A kind of improved steel slag tank
Technical field
The utility model relates to a kind of steel slag tank of making steel usefulness, belongs to the steelmaking equipment technical field.
Background technology
Now the steel industry steelworks slag ladle that is used for holding slag is commonly cast structure, and gudgeon is cast as one with tank body for processing back earlier, after casting is finished the part is processed, and tipple is installed again.
Existing slag ladle exists that subject matter has the manufacture difficulty height, the cycle is long, cost is high, work-ing life is short, poor stability, reparation difficulty etc., and is as follows in detail:
1. because deadweight is bigger, be that example weighs 55 tons with 33 cubes, the filling wall is thinner with respect to this part, has only 95 millimeters, so the casting difficulty, the scrap rate height have only for the less unit of number can make, and cost is higher, and fabrication cycle is long.
2. after manufacturing was finished, the part needed machining, because the tank body size is bigger, and processing difficulties, and have only the bigger lathe of specification just to have the ability to process, processing charges is higher.
3. security is relatively poor, because fixedly the metal structure of gudgeon is a cast structure, its intensity is difficult for assurance, and security incident such as easily rupture, slag leaks.
4. because tank body is a foundry goods, organize eakiness, when bearing higher temperature variation, ftracture easily, work-ing life is shorter, repairs difficulty.
Summary of the invention
The utility model wants the technical solution problem to provide a kind of defective that overcomes prior art, has intensity height, security is good, easy to manufacture, manufacturing cost is low improved steel slag tank.
The technical scheme that solves the problems of the technologies described above is:
A kind of improved steel slag tank, it is made up of tank body, gudgeon, tipple, its improvement is, the polygonal pyramid body of tank body for being welded to form by the trapezoidal steel plate of polylith, the big end of centrum is the tank body opening, small end is the bottom of tank body, the jar end, be installed in the inboard, bottom, on the outer wall of tank body opening both sides, be fixedly connected with trunnion seat, trunnion seat is connected by bearing pin with main vertical rib plate, there is the reinforcement vertical rib plate of engaging lug axle bed and tank wall the both sides of described trunnion seat, and the horizontal stiffener around tank body is arranged on tank wall, and they are closely fixedlyed connected with tank wall.
Above-mentioned improved steel slag tank, described horizontal stiffener are more than 3 roads.
Adopt the steel slag tank of this structure, tank body is spliced by the trapezoidal steel plate of polylith, and structural strength height, security are good; Trunnion seat and tank body main structure steel plate are welded as a firm integral body, can guarantee the safety used to prevent gudgeon slippage when stressed; Weldprocedure is adopted in tank body processing, easy construction, and the difficulty that reduces to make has the general unit of Weldability just can make, and need not make mould, and fabrication cycle shortens greatly, and manufacturing cost significantly reduces.
Description of drawings
Fig. 1 is a structural representation of the present utility model;
Fig. 2 is the side-view of Fig. 1;
Fig. 3 is the vertical view of Fig. 1.
Mark is as follows among the figure: gudgeon 1, bearing pin 2, trunnion seat 3, reinforcement vertical rib plate 4, tank body 5, tipple 6, horizontal stiffener 7,8,9,10,11.
Embodiment
Show among the figure, it is polygonal pyramid body structure (as eight pyramids, hecaprismo body, ten pyramids) that tank body changes traditional circular configuration, tank body 5 adopts organizes the higher rolled sheet material of closely knit intensity, tank body 5 is spliced by the trapezoidal steel plate of polylith, it during splicing easy construction, at first be inverted, weld the interface section, and then upset, be shaped as up big and down small positive multi-pyramid after the upset, thus the difficulty that reduces to make, there is the general unit of Weldability just can make, need not make mould, fabrication cycle shortens greatly, and manufacturing cost significantly reduces.
Gudgeon 1 of the present utility model and trunnion seat 3 are before welding with tank body 5, gudgeon 1 is pre-loaded into trunnion seat 3, and then welds with tank body 5 general assemblies.In the position perforate of tank body 5 correspondences, trunnion seat 3 is embedded among the main tank body 5.This kind structure can prevent gudgeon 1 slippage when stressed, and the reinforcement vertical rib plate 4 that two blocks of above-below directions are arranged in the both sides of trunnion seat 3, increase the bearing pin 2 of a shrink-fit again, thereby make trunnion seat 3 and reinforcement vertical rib plate 4, the tank body 5 main structure steel plates of both sides be combined into a firm integral body, the length that increases stressed weld seam can guarantee the safety used.Gudgeon 1 and trunnion seat 3 are forging, do flaw detection before the installation.
The of the present utility model jar of end, keep corresponding distance for putting into apart from bottommost from top to bottom, and the generation of the phenomenon that breaks off the base in can preventing to use guarantees the safety of using.
In order to guarantee the globality of tank body 5, prevent cracking, present embodiment has five road horizontal stiffeners 7,8,9,10,11 altogether in the horizontal direction.The per pass horizontal stiffener is welded to connect by four steel plate bars by bending forms the corner angle of the corresponding tank body in bending place.For proof strength, horizontal stiffener does not have weld seam in the corner angle position of tank body.
Jar end, is the part of connecting rod base for processing in advance of tipple 6 fixedly, at the bottom of being welded on jar, irritates and need not reprocess after integral manufacturing finishes, and reduces by a procedure, can reduce cost of manufacture.
The utility model can be obtained following effect after implementing:
1, can reduce cost of manufacture, cost of equipment reduces;
2, the manufacturing cycle can be shortened;
3, increase the service life and reach more than the twice, can reduce use cost;
4, the security of can raising equipment using;
5, because tank body is the plane steel plate formation, it is convenient to repair
6, after tank body was scrapped, forging gudgeon that cost is higher and trunnion seat were disassembled after simple processing is reusable, reduce the expense of making once more.

Claims (2)

1. improved steel slag tank, it is by tank body [5], gudgeon [1], tipple [6] is formed, it is characterized in that: the polygonal pyramid body of tank body [5] for being welded to form by the trapezoidal steel plate of polylith, the big end of centrum is tank body [a 5] opening, small end is the bottom of tank body [5], the jar end, be installed in the inboard, bottom, on the outer wall of tank body [5] opening both sides, be fixedly connected with trunnion seat [3], trunnion seat [3] is connected by bearing pin [2] with main vertical rib plate [4], there is the reinforcement vertical rib plate [4] of engaging lug axle bed [3] and tank body [5] outer wall the both sides of described trunnion seat [3], have around the horizontal stiffener of tank body [5] on tank body [5] outer wall, they are closely fixedlyed connected with tank body [5] outer wall.
2. improved steel slag tank according to claim 1 is characterized in that: described horizontal stiffener is more than 3 roads.
CN200920101971U 2009-03-23 2009-03-23 Improved steel slag tank Expired - Fee Related CN201381328Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200920101971U CN201381328Y (en) 2009-03-23 2009-03-23 Improved steel slag tank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200920101971U CN201381328Y (en) 2009-03-23 2009-03-23 Improved steel slag tank

Publications (1)

Publication Number Publication Date
CN201381328Y true CN201381328Y (en) 2010-01-13

Family

ID=41524804

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200920101971U Expired - Fee Related CN201381328Y (en) 2009-03-23 2009-03-23 Improved steel slag tank

Country Status (1)

Country Link
CN (1) CN201381328Y (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101905316A (en) * 2010-06-15 2010-12-08 无锡巨力重工机械有限公司 Novel metallurgical molten metal ladle trunnion mounting structure
CN102912046A (en) * 2012-10-25 2013-02-06 无锡中彩新材料股份有限公司 Metallurgical slag pot
CN102935502A (en) * 2012-10-31 2013-02-20 武汉钢铁(集团)公司 Trunnion imbedding method of metallurgical slag pot
CN109897922A (en) * 2019-03-26 2019-06-18 武钢集团襄阳重型装备材料有限公司 A kind of large-scale metallurgical slag ladle
CN113322361A (en) * 2021-06-04 2021-08-31 武钢集团襄阳重型装备材料有限公司 Ultra-large metallurgical slag pot

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101905316A (en) * 2010-06-15 2010-12-08 无锡巨力重工机械有限公司 Novel metallurgical molten metal ladle trunnion mounting structure
CN102912046A (en) * 2012-10-25 2013-02-06 无锡中彩新材料股份有限公司 Metallurgical slag pot
CN102935502A (en) * 2012-10-31 2013-02-20 武汉钢铁(集团)公司 Trunnion imbedding method of metallurgical slag pot
CN102935502B (en) * 2012-10-31 2014-10-29 武汉钢铁(集团)公司 Trunnion imbedding method of metallurgical slag pot
CN109897922A (en) * 2019-03-26 2019-06-18 武钢集团襄阳重型装备材料有限公司 A kind of large-scale metallurgical slag ladle
CN113322361A (en) * 2021-06-04 2021-08-31 武钢集团襄阳重型装备材料有限公司 Ultra-large metallurgical slag pot

Similar Documents

Publication Publication Date Title
CN201381328Y (en) Improved steel slag tank
CN101368220B (en) Novel structured metallurgy cinder ladle and method of producing the same
CN102140652B (en) Novel anode used for aluminum electrolysis and production method thereof
CN103789471B (en) A kind of multi-angular convex polygon structure metallurgical slag tank and manufacture method thereof
CN107254559B (en) A kind of cooling wall and its processing method
CN204528218U (en) High-temperature material transfer pot
CN201979079U (en) Hot-metal pot
CN210098953U (en) Can dismantle hot-metal bottle of jar mouth
CN201387237Y (en) Water cooled beam and pillar teeming construction die of steel rolling heating furnace
CN220034557U (en) Welding slag pot
CN211645306U (en) Converter slag trap and converter
CN217438236U (en) Slag stopper for converter
CN220880452U (en) Dabber supporting base for reconstructed steel ingot
CN216640656U (en) Round blank rack and storage yard
CN218860778U (en) Integral desulfurization spray gun
CN217331985U (en) Test device for testing safety of molten steel tank
CN220560404U (en) Refractory prefabricated brick for ladle bottom impact zone
CN201778036U (en) Structure for preventing metallurgical slag pot body from deforming and cracking
CN220560406U (en) Ladle
CN220560403U (en) Ladle bottom refractory structure
CN203917899U (en) A kind of Novel hot-metal bottle tank mouth structure
CN201511050U (en) Distribution extrusion die
RU2818063C1 (en) Dart for cutting off final converter slag from metal, method of its assembly and system for cutting off final converter slag
CN212720799U (en) P-S converter mouth structure with welded structure
CN115029501A (en) Repairing method for converter steel tapping hole

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100113