CN201377329Y - Hydraulic screw for tunnel trolley - Google Patents

Hydraulic screw for tunnel trolley Download PDF

Info

Publication number
CN201377329Y
CN201377329Y CN200920088709U CN200920088709U CN201377329Y CN 201377329 Y CN201377329 Y CN 201377329Y CN 200920088709 U CN200920088709 U CN 200920088709U CN 200920088709 U CN200920088709 U CN 200920088709U CN 201377329 Y CN201377329 Y CN 201377329Y
Authority
CN
China
Prior art keywords
template
screw
trolley
leading screw
hydraulic cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN200920088709U
Other languages
Chinese (zh)
Inventor
何年保
何年贵
张念东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN200920088709U priority Critical patent/CN201377329Y/en
Application granted granted Critical
Publication of CN201377329Y publication Critical patent/CN201377329Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a screw rod a tunnel trolley, mainly relating to a hydraulic screw for a tunnel trolley and solving the disadvantages of the existing hydraulic screw of a tunnel trolley. A connecting plate1 is connected on the trolley, when the trolley arrives at a new working face, a hydraulic cylinder needs to send a template to a definite working site, a sliding sleeve on the screw slides on a guide post and works orderly along with the hydraulic cylinder. When the template reaches the desirable place, a locknut6 is rotated forward to lock the sliding sleeve, and while maintaining the relaxed state, a handle8 is rotated to enable the screw to work to finely adjust the position of the template. After concrete is poured, the template needs to be dismantled; the locknut is unscrewed through a spanner; the sliding sleeve slides on the guide post; and the template can extend and retract along with the work of the hydraulic cylinder. The operation is simple and can be done by only one operator, the work efficiency is high, and the operating process is safe and reliable.

Description

Tunnel chassis hydraulic pressure leading screw
Technical field
The utility model tunnel chassis leading screw relates generally to a kind of tunnel chassis hydraulic pressure leading screw.
Background technology
At present, tunnel chassis hydraulic pressure leading screw must be taken apart when hydraulic cylinder works, treats leading screw to be installed after hydraulic cylinder is delivered to concrete operating position with template again, treat that concreting is finished after, to remove leading screw earlier, hydraulic cylinder just can work on.A chassis generally need be installed 100 multi-filament thick sticks, and a rhizoid thick stick probably has more than 30 jin of weight, and installation and removal are trouble very, workload is very big, and the template intermediate space is limited in the tunnel, and it is more that potential safety hazard is unloaded in the process in the case installation and dismantling, and programming is slow.
Summary of the invention
The utility model tunnel chassis hydraulic pressure leading screw has solved the drawback of existing chassis hydraulic pressure leading screw, leading screw and junction plate are fixed, adjusting nut and leading screw welding, tube connector is welded in adjusting nut and slip cap, slip cap is in the periphery of guide pillar, handle is cemented on the tube connector, and locking nut is at the front end of slip cap.When hydraulic cylinder works, do not need to remove leading screw, only need unclamp locking nut and returns or tighten, simple to operate, high efficiency, people just can complete operation, and leading screw, nut all keep and being connected of chassis, and operation process is safe and reliable.
Description of drawings
Accompanying drawing is a structural representation of the present utility model.
In the diagram: 1 junction plate, 2 leading screws, 3 adjusting nuts, 4 tube connectors, 5 slip caps, 6 locking nuts, 7 guide pillars, 8 handles.
The specific embodiment
In conjunction with the accompanying drawings the utility model is described further;
The utility model tunnel chassis hydraulic pressure leading screw, by: junction plate 1, leading screw 2, adjusting nut 3, tube connector 4, slip cap 5, locking nut 6, guide pillar 7, handle 8 are formed.Leading screw 2 is fixed with junction plate, adjusting nut 3 and leading screw 2 welding, and tube connector 4 is welded in adjusting nut 3 and slip cap 5, and slip cap 5 is in the periphery of guide pillar 7, and handle 8 is cemented on the tube connector 4, and locking nut 6 is at the front end of slip cap 5.
In concrete enforcement, junction plate 1 is connected in chassis, and when chassis arrived new work plane, hydraulic cylinder needed template is delivered to concrete operating position, and simultaneously, slip cap slides on guide pillar on the leading screw, along with the orderly work of hydraulic cylinder; After template arrived desired location, rotational lock nut 6 locking slip caps kept the relaxation state forward, and turning handle 8 makes leading screw work carry out the fine setting of template position.The concrete pouring template that finishes needs to remove, and unclamps locking nut with spanner, and slip cap slides on guide pillar, along with the flexible of template finished in the work of hydraulic cylinder.

Claims (1)

1, tunnel chassis hydraulic pressure leading screw, form by junction plate (1), leading screw (2), adjusting nut (3), tube connector (4), slip cap (5), locking nut (6), guide pillar (7), handle (8), it is characterized in that: leading screw (2) is fixed with junction plate, adjusting nut (3) and leading screw (2) welding, tube connector (4) is welded in adjusting nut (3) and slip cap (5), slip cap (5) is in the periphery of guide pillar (7), handle (8) is cemented on the tube connector (4), and locking nut (6) is at the front end of slip cap (5).
CN200920088709U 2009-02-20 2009-02-20 Hydraulic screw for tunnel trolley Expired - Fee Related CN201377329Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200920088709U CN201377329Y (en) 2009-02-20 2009-02-20 Hydraulic screw for tunnel trolley

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200920088709U CN201377329Y (en) 2009-02-20 2009-02-20 Hydraulic screw for tunnel trolley

Publications (1)

Publication Number Publication Date
CN201377329Y true CN201377329Y (en) 2010-01-06

Family

ID=41517434

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200920088709U Expired - Fee Related CN201377329Y (en) 2009-02-20 2009-02-20 Hydraulic screw for tunnel trolley

Country Status (1)

Country Link
CN (1) CN201377329Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107175753A (en) * 2017-06-02 2017-09-19 西安华道电机有限公司 A kind of concrete prefabricated girder steel formwork with automatic locking mechanism

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107175753A (en) * 2017-06-02 2017-09-19 西安华道电机有限公司 A kind of concrete prefabricated girder steel formwork with automatic locking mechanism
CN107175753B (en) * 2017-06-02 2023-09-26 西安华道电机有限公司 Take automatic locking mechanism's precast concrete beam steel form

Similar Documents

Publication Publication Date Title
CN203613728U (en) Taper sleeve locked rebar connector and mounting tool thereof
CN203531365U (en) Bolt anchor stiffness wall connecting piece
CN201377329Y (en) Hydraulic screw for tunnel trolley
CN202250111U (en) Supporting tool
CN101832025B (en) Sealing up screw
CN202850476U (en) Scaffold through-wall adjustable tool type wall connection device
CN202001431U (en) Lock oil cylinder
CN202037585U (en) Novel motor bearing detacher
CN204024684U (en) A kind of self-drilling slip casting recoverable anchor rod
CN213683296U (en) Preformed hole plugging device
CN205276653U (en) Furred ceiling jib installation device
CN205153543U (en) Simple and easy template reinforcing apparatus
CN203160666U (en) Wall-connecting assembly of scaffold
CN204781978U (en) A staple bolt formula protector that is used for jacking of pump sending concrete to take over non return mouth
CN219281288U (en) Water-stopping bolt
CN209179465U (en) To pull-up screw rod wall-connecting piece
CN104343233A (en) Slip-resistant telescopic scaffold steel pipe
CN204041078U (en) A kind of tunnel lining trolley plugging device
CN203603444U (en) Steel pipe scaffold wall connecting piece
CN201671338U (en) Water-stop screw rod
CN206513030U (en) Split bolt formwork reinforcement is pegged body
CN204001281U (en) A kind of cast-in-place framework and shear wall construction structure
CN201496260U (en) Well drilling mud pump piston extractor
CN204725381U (en) Electric power pylon bolt fixture
CN203125675U (en) Concrete formwork locking and fastening device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100106

Termination date: 20110220