CN201377329Y - Hydraulic screw for tunnel trolley - Google Patents
Hydraulic screw for tunnel trolley Download PDFInfo
- Publication number
- CN201377329Y CN201377329Y CN200920088709U CN200920088709U CN201377329Y CN 201377329 Y CN201377329 Y CN 201377329Y CN 200920088709 U CN200920088709 U CN 200920088709U CN 200920088709 U CN200920088709 U CN 200920088709U CN 201377329 Y CN201377329 Y CN 201377329Y
- Authority
- CN
- China
- Prior art keywords
- template
- screw
- trolley
- leading screw
- hydraulic cylinder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The utility model discloses a screw rod a tunnel trolley, mainly relating to a hydraulic screw for a tunnel trolley and solving the disadvantages of the existing hydraulic screw of a tunnel trolley. A connecting plate1 is connected on the trolley, when the trolley arrives at a new working face, a hydraulic cylinder needs to send a template to a definite working site, a sliding sleeve on the screw slides on a guide post and works orderly along with the hydraulic cylinder. When the template reaches the desirable place, a locknut6 is rotated forward to lock the sliding sleeve, and while maintaining the relaxed state, a handle8 is rotated to enable the screw to work to finely adjust the position of the template. After concrete is poured, the template needs to be dismantled; the locknut is unscrewed through a spanner; the sliding sleeve slides on the guide post; and the template can extend and retract along with the work of the hydraulic cylinder. The operation is simple and can be done by only one operator, the work efficiency is high, and the operating process is safe and reliable.
Description
Technical field
The utility model tunnel chassis leading screw relates generally to a kind of tunnel chassis hydraulic pressure leading screw.
Background technology
At present, tunnel chassis hydraulic pressure leading screw must be taken apart when hydraulic cylinder works, treats leading screw to be installed after hydraulic cylinder is delivered to concrete operating position with template again, treat that concreting is finished after, to remove leading screw earlier, hydraulic cylinder just can work on.A chassis generally need be installed 100 multi-filament thick sticks, and a rhizoid thick stick probably has more than 30 jin of weight, and installation and removal are trouble very, workload is very big, and the template intermediate space is limited in the tunnel, and it is more that potential safety hazard is unloaded in the process in the case installation and dismantling, and programming is slow.
Summary of the invention
The utility model tunnel chassis hydraulic pressure leading screw has solved the drawback of existing chassis hydraulic pressure leading screw, leading screw and junction plate are fixed, adjusting nut and leading screw welding, tube connector is welded in adjusting nut and slip cap, slip cap is in the periphery of guide pillar, handle is cemented on the tube connector, and locking nut is at the front end of slip cap.When hydraulic cylinder works, do not need to remove leading screw, only need unclamp locking nut and returns or tighten, simple to operate, high efficiency, people just can complete operation, and leading screw, nut all keep and being connected of chassis, and operation process is safe and reliable.
Description of drawings
Accompanying drawing is a structural representation of the present utility model.
In the diagram: 1 junction plate, 2 leading screws, 3 adjusting nuts, 4 tube connectors, 5 slip caps, 6 locking nuts, 7 guide pillars, 8 handles.
The specific embodiment
In conjunction with the accompanying drawings the utility model is described further;
The utility model tunnel chassis hydraulic pressure leading screw, by: junction plate 1, leading screw 2, adjusting nut 3, tube connector 4, slip cap 5, locking nut 6, guide pillar 7, handle 8 are formed.Leading screw 2 is fixed with junction plate, adjusting nut 3 and leading screw 2 welding, and tube connector 4 is welded in adjusting nut 3 and slip cap 5, and slip cap 5 is in the periphery of guide pillar 7, and handle 8 is cemented on the tube connector 4, and locking nut 6 is at the front end of slip cap 5.
In concrete enforcement, junction plate 1 is connected in chassis, and when chassis arrived new work plane, hydraulic cylinder needed template is delivered to concrete operating position, and simultaneously, slip cap slides on guide pillar on the leading screw, along with the orderly work of hydraulic cylinder; After template arrived desired location, rotational lock nut 6 locking slip caps kept the relaxation state forward, and turning handle 8 makes leading screw work carry out the fine setting of template position.The concrete pouring template that finishes needs to remove, and unclamps locking nut with spanner, and slip cap slides on guide pillar, along with the flexible of template finished in the work of hydraulic cylinder.
Claims (1)
1, tunnel chassis hydraulic pressure leading screw, form by junction plate (1), leading screw (2), adjusting nut (3), tube connector (4), slip cap (5), locking nut (6), guide pillar (7), handle (8), it is characterized in that: leading screw (2) is fixed with junction plate, adjusting nut (3) and leading screw (2) welding, tube connector (4) is welded in adjusting nut (3) and slip cap (5), slip cap (5) is in the periphery of guide pillar (7), handle (8) is cemented on the tube connector (4), and locking nut (6) is at the front end of slip cap (5).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200920088709U CN201377329Y (en) | 2009-02-20 | 2009-02-20 | Hydraulic screw for tunnel trolley |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200920088709U CN201377329Y (en) | 2009-02-20 | 2009-02-20 | Hydraulic screw for tunnel trolley |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201377329Y true CN201377329Y (en) | 2010-01-06 |
Family
ID=41517434
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN200920088709U Expired - Fee Related CN201377329Y (en) | 2009-02-20 | 2009-02-20 | Hydraulic screw for tunnel trolley |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201377329Y (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107175753A (en) * | 2017-06-02 | 2017-09-19 | 西安华道电机有限公司 | A kind of concrete prefabricated girder steel formwork with automatic locking mechanism |
-
2009
- 2009-02-20 CN CN200920088709U patent/CN201377329Y/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107175753A (en) * | 2017-06-02 | 2017-09-19 | 西安华道电机有限公司 | A kind of concrete prefabricated girder steel formwork with automatic locking mechanism |
CN107175753B (en) * | 2017-06-02 | 2023-09-26 | 西安华道电机有限公司 | Take automatic locking mechanism's precast concrete beam steel form |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203613728U (en) | Taper sleeve locked rebar connector and mounting tool thereof | |
CN203531365U (en) | Bolt anchor stiffness wall connecting piece | |
CN201377329Y (en) | Hydraulic screw for tunnel trolley | |
CN202250111U (en) | Supporting tool | |
CN101832025B (en) | Sealing up screw | |
CN202850476U (en) | Scaffold through-wall adjustable tool type wall connection device | |
CN202001431U (en) | Lock oil cylinder | |
CN202037585U (en) | Novel motor bearing detacher | |
CN204024684U (en) | A kind of self-drilling slip casting recoverable anchor rod | |
CN213683296U (en) | Preformed hole plugging device | |
CN205276653U (en) | Furred ceiling jib installation device | |
CN205153543U (en) | Simple and easy template reinforcing apparatus | |
CN203160666U (en) | Wall-connecting assembly of scaffold | |
CN204781978U (en) | A staple bolt formula protector that is used for jacking of pump sending concrete to take over non return mouth | |
CN219281288U (en) | Water-stopping bolt | |
CN209179465U (en) | To pull-up screw rod wall-connecting piece | |
CN104343233A (en) | Slip-resistant telescopic scaffold steel pipe | |
CN204041078U (en) | A kind of tunnel lining trolley plugging device | |
CN203603444U (en) | Steel pipe scaffold wall connecting piece | |
CN201671338U (en) | Water-stop screw rod | |
CN206513030U (en) | Split bolt formwork reinforcement is pegged body | |
CN204001281U (en) | A kind of cast-in-place framework and shear wall construction structure | |
CN201496260U (en) | Well drilling mud pump piston extractor | |
CN204725381U (en) | Electric power pylon bolt fixture | |
CN203125675U (en) | Concrete formwork locking and fastening device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100106 Termination date: 20110220 |