CN201374624Y - Tooling elevator head used in heat treatment process of huge rotor of no more than 200MW - Google Patents

Tooling elevator head used in heat treatment process of huge rotor of no more than 200MW Download PDF

Info

Publication number
CN201374624Y
CN201374624Y CN200920088972U CN200920088972U CN201374624Y CN 201374624 Y CN201374624 Y CN 201374624Y CN 200920088972 U CN200920088972 U CN 200920088972U CN 200920088972 U CN200920088972 U CN 200920088972U CN 201374624 Y CN201374624 Y CN 201374624Y
Authority
CN
China
Prior art keywords
rotor
cramp frame
elevator head
link plate
crossbeam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN200920088972U
Other languages
Chinese (zh)
Inventor
于文平
邵文华
李德福
李圣
席志永
张峰
郑涛
尤欲武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CITIC Heavy Industries Co Ltd
Original Assignee
CITIC Heavy Industries Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CITIC Heavy Industries Co Ltd filed Critical CITIC Heavy Industries Co Ltd
Priority to CN200920088972U priority Critical patent/CN201374624Y/en
Application granted granted Critical
Publication of CN201374624Y publication Critical patent/CN201374624Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Manufacture Of Motors, Generators (AREA)

Abstract

The utility model provides a tooling elevator head used in a heat treatment process of a huge rotor of no more than 200MW. The tooling elevator head comprises an elevating cap, a pull rod, a beam, a hanging plate and a cramp frame, wherein the elevating cap (1) is connected with the beam (6) through the pull rod (3); two ends of the beam (6) is connected with the cramp frame which clamps a rotor (9) through the hanging plate (2); and two ends of the cramp frame are fixed by pins. The tooling elevator head can bear the huge motor rotor with the weight greater than 50t, and have simple structural design and convenient manufacture.

Description

The frock elevator head that 200MW and following large rotor Technology for Heating Processing are used
Technical field
The utility model relates to rotor manufacturing technology field, the frock elevator head that a kind of 200MW and following large rotor Technology for Heating Processing are used.
Background technology
At present, rotor is one of four big key components of steam power plant, because its condition of work complexity, bear great centrifugal force, because of temperature gradient causes thermal stress, the rotation vibrations cause the very high additional stress of frequency, temporary impact vibration that unit starting, parking and other reasons are produced and torsional stress etc.; As: the 200MW large rotor that super-huge motor uses, material selection: 25Cr2Ni4MoV, weight is 41 tons, axle body diameter 1090mm, axle body length 4110mm, length overall 9780mm.
Because the diameter after this rotor roughing is big, length is long, weight is big, existing frock jig can't lift.
Summary of the invention
For overcoming the deficiencies in the prior art, the frock elevator head that the utility model provides a kind of 200MW and following large rotor Technology for Heating Processing to use.Can load-bearing greater than the Large Rotor of 50t.Its structural design is simple, and is easy to make.
For achieving the above object, the present invention adopts technical scheme as described below:
The frock elevator head that described 200MW and following large rotor Technology for Heating Processing are used, comprise: hang cap, pull bar, crossbeam, link plate and cramp frame, hang cap and connect crossbeam by pull bar, the two ends of crossbeam by link plate with add the cramp frame of holding rotor and be connected, the two ends of cramp frame are by dowel fixes.
The frock elevator head that described 200MW and following large rotor Technology for Heating Processing are used, the rectangular plate of link plate, an end is provided with the circular hole that connects crossbeam on its plate, and the other end is provided with the rectangular opening that connects cramp frame on the plate; Two jiaos of the link plate upper end is fillet, and two jiaos of the link plate bottom is the right angle.
The frock elevator head that described 200MW and following large rotor Technology for Heating Processing are used, cramp frame is the tooth arch of a symmetry, and the middle part of each tooth arch is provided with to add holds the arc of rotor, and the two ends of tooth arch are provided with pin-and-hole.
Owing to adopt aforesaid technical scheme, the utlity model has following good effect:
The frock elevator head that this 200MW and following large rotor Technology for Heating Processing are used.Our factory is accepted the task of the rotor of certain company and is developed.Its structural design is simple, make easy to use, can load-bearing greater than the Large Rotor of 50t.
Description of drawings
Fig. 1 is the structural representation of elevator head;
Fig. 2 is the structural representation of link plate;
Fig. 3 is the structural representation of cramp frame;
Among the figure: 1-hangs cap; The 2-link plate; 2.1-rectangular opening; 2.2-circular hole; The 3-pull bar; The 4-pin; 5-pull bar pin-and-hole; The 6-crossbeam; The 7-tooth arch; 8-cramp frame pin-and-hole; The 9-rotor.
Embodiment
As shown in Figure 1, 2, 3: the frock elevator head that this 200MW and following large rotor Technology for Heating Processing are used, comprise: hang cap, pull bar, crossbeam, link plate and cramp frame, hang cap (1) and connect crossbeam (6) by pull bar (3), the two ends of crossbeam (6) by link plate (2) with add the cramp frame of holding rotor (9) and be connected, the two ends of cramp frame are by dowel fixes.
The rectangular plate of described link plate (2), its plate top are provided with the circular hole (2.1) that connects crossbeam, and the bottom of plate is provided with the rectangular opening (2.2) that connects cramp frame; Two jiaos of the link plate upper end is fillet, and two jiaos of the link plate bottom is the right angle.
Described cramp frame is the tooth arch (7) of a symmetry, and the middle part of each tooth arch (7) is provided with to add holds the arc of rotor (9), and the two ends of tooth arch (7) are provided with pin-and-hole (8).
When production 200MW and following large rotor are heat-treated technology,, exceeded the load-bearing requirement of former the design's frock because large rotor weight reaches 41t,
At first design and the elevator head of making frock are made of custom-designed link plate and cramp frame, and the designed link plate and the load-bearing of cramp frame have reached 50t.Its structure constitutes by hanging cap (1), pull bar (3), crossbeam, link plate and cramp frame, hang cap and connect crossbeam by pull bar, the two ends of crossbeam by link plate with add the cramp frame of holding rotor and be connected.
During use, to clamp the two ends of the cramp frame of rotor (9) one ends and pass the square hole of link plate (2) respectively by dowel fixes, the circle hole sleeve of two link plates (2) is on crossbeam (6), and pull bar (3) one ends on the crossbeam (6) pass and hang cap (1), and its pull bar pin-and-hole (5) is fixing by pin (4).
During work, by hanging cap (1), pull bar (3) by crossbeam (6), link plate (2) and the cramp frame rotor (9) of slinging.

Claims (3)

1, the frock elevator head used of a kind of 200MW and following large rotor Technology for Heating Processing, it is characterized in that: comprising: hang cap, pull bar, crossbeam, link plate and cramp frame, hang cap (1) and connect crossbeam (6) by pull bar (3), the two ends of crossbeam (6) by link plate (2) with add the cramp frame of holding rotor (9) and be connected, the two ends of cramp frame are by dowel fixes.
2, the frock elevator head used of 200MW according to claim 1 and following large rotor Technology for Heating Processing, it is characterized in that: the rectangular plate of link plate (2), its plate top is provided with the circular hole (2.1) that connects crossbeam, and the bottom of plate is provided with the rectangular opening (2.2) that connects cramp frame; Two jiaos of the link plate upper end is fillet, and two jiaos of the link plate bottom is the right angle.
3, the frock elevator head used of 200MW according to claim 1 and following large rotor Technology for Heating Processing, it is characterized in that: cramp frame is the tooth arch (7) of a symmetry, the middle part of each tooth arch (7) is provided with to add holds the arc of rotor (9), and the two ends of tooth arch (7) are provided with pin-and-hole (8).
CN200920088972U 2009-03-12 2009-03-12 Tooling elevator head used in heat treatment process of huge rotor of no more than 200MW Expired - Fee Related CN201374624Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200920088972U CN201374624Y (en) 2009-03-12 2009-03-12 Tooling elevator head used in heat treatment process of huge rotor of no more than 200MW

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200920088972U CN201374624Y (en) 2009-03-12 2009-03-12 Tooling elevator head used in heat treatment process of huge rotor of no more than 200MW

Publications (1)

Publication Number Publication Date
CN201374624Y true CN201374624Y (en) 2009-12-30

Family

ID=41500705

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200920088972U Expired - Fee Related CN201374624Y (en) 2009-03-12 2009-03-12 Tooling elevator head used in heat treatment process of huge rotor of no more than 200MW

Country Status (1)

Country Link
CN (1) CN201374624Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102862908A (en) * 2012-09-29 2013-01-09 无锡市中达电机有限公司 Special lifting cap for motor
CN104608109A (en) * 2015-01-20 2015-05-13 宁波菲仕电机技术有限公司 Pick-and-place tool used in shell hot pressing process

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102862908A (en) * 2012-09-29 2013-01-09 无锡市中达电机有限公司 Special lifting cap for motor
CN104608109A (en) * 2015-01-20 2015-05-13 宁波菲仕电机技术有限公司 Pick-and-place tool used in shell hot pressing process

Similar Documents

Publication Publication Date Title
CN101445867A (en) Heat treatment method for high-power locomotive diesel engine crankshafts
CN201374624Y (en) Tooling elevator head used in heat treatment process of huge rotor of no more than 200MW
CN203451054U (en) Hoisting fixture for large-scale circular ring part
CN205519440U (en) Bent axle directly forges mould
CN206293569U (en) A kind of battery modules clamping device
CN102330751A (en) Motor test spacer-bush-type coupling and dismounting method thereof
CN204449767U (en) A kind of mould for welding ladder truck lifting linking member
CN203856909U (en) Coupler
CN102126097A (en) Circular seam preheating device
CN201694738U (en) Hook tongs for forged piece
CN202053004U (en) Brazing fixture for heat exchanger
CN206379850U (en) Yoke press-fits push broach frame boring device
CN207709787U (en) A kind of shell tooling processed of high-temperature alloy casting model
CN202683910U (en) Auxiliary manipulator for forging and pressing equipment
CN101653931B (en) Extension clamp
CN203202157U (en) Marine high-power engine crankshaft gear
CN201900484U (en) Tool for machining middle slotted holes of struts used on brake beam of rail wagon
CN204360918U (en) A kind of transformer erecting by overhang
CN104071690B (en) Stone tongs
CN202518941U (en) Steel wire coil hoisting clamp
CN219336520U (en) Crankshaft welding heat preservation device
CN212001923U (en) Stress relieving column
CN202108826U (en) Draw plate fixer
CN219787210U (en) Beam-pumping unit horse head string rope seat group is to assembly fixture
CN206905527U (en) A kind of electric melting magnesium furnace electrode assembly

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20091230

Termination date: 20180312