CN201374339Y - Solar cell-mounting clamp module - Google Patents

Solar cell-mounting clamp module Download PDF

Info

Publication number
CN201374339Y
CN201374339Y CN200820178952U CN200820178952U CN201374339Y CN 201374339 Y CN201374339 Y CN 201374339Y CN 200820178952 U CN200820178952 U CN 200820178952U CN 200820178952 U CN200820178952 U CN 200820178952U CN 201374339 Y CN201374339 Y CN 201374339Y
Authority
CN
China
Prior art keywords
horizontal
solar cell
protuberance
heelpiece
cover plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN200820178952U
Other languages
Chinese (zh)
Inventor
杨与胜
洪秋晋
庄辉虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Jingcheng Boyang Optoelectronic Equipment Co.,Ltd.
Fujian Golden Sun Solar Technic Co., Ltd.
Original Assignee
FUJIAN GOLDEN SUN SOLAR TECHNIC Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FUJIAN GOLDEN SUN SOLAR TECHNIC Co Ltd filed Critical FUJIAN GOLDEN SUN SOLAR TECHNIC Co Ltd
Priority to CN200820178952U priority Critical patent/CN201374339Y/en
Application granted granted Critical
Publication of CN201374339Y publication Critical patent/CN201374339Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24SSOLAR HEAT COLLECTORS; SOLAR HEAT SYSTEMS
    • F24S25/00Arrangement of stationary mountings or supports for solar heat collector modules
    • F24S25/60Fixation means, e.g. fasteners, specially adapted for supporting solar heat collector modules
    • F24S25/63Fixation means, e.g. fasteners, specially adapted for supporting solar heat collector modules for fixing modules or their peripheral frames to supporting elements
    • F24S25/634Clamps; Clips
    • F24S25/636Clamps; Clips clamping by screw-threaded elements
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/40Solar thermal energy, e.g. solar towers
    • Y02E10/47Mountings or tracking
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Sustainable Development (AREA)
  • Sustainable Energy (AREA)
  • Thermal Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Photovoltaic Devices (AREA)

Abstract

The utility model relates to a solar cell-mounting clamp module, which consists of a holddown and an elastic cushion. The holddown consists of a cover plate and a projected part positioned at the middle of the lower surface of the cover plate. The elastic cushion consists of a bottom cushion, a first upward-extended part, a second upward-extended part, a first horizontal-extended part and a second horizontal-extended part; wherein the first and the second upward-extended parts are upwardly extended from the upper surface of the bottom cushion; and the first and the second horizontal-extended parts are horizontally extended along opposite directions from the ends of the first and the second upward-extended parts. A groove is formed on the lower surface of the projected part, a rib is formed on the upper surface of the middle part of the bottom cushion, the cover plate is pressed on the first and the second horizontal-extended parts, the rib is inserted between the first and the second upward-extended parts, and moreover, the rib formed on the upper surface of the middle part of the bottom cushion is embedded in the groove formed on the lower surface of the projected part. The mounting clamp module has the advantages of simple structure and low cost, and can steadily fix a solar cell on a supporting rod.

Description

Solar cell is installed the pincers assembly
Technical field
The utility model generally relates to the installation of solar cell, more specifically, relates to a kind of solar cell the pincers assembly is installed.
Background technology
Solar cell utilizes solar energy to produce electric energy.Solar cell is to eco-friendly, and the life cycle that has the unlimited energy and grow.For the ease of absorbing solar energy, solar cell generally is installed on building roof, metope or the easy irradiation position of other sunlight.
The method that solar cell is installed has multiple.A kind of method provides the rectangular metal frame that is made of metal usually that the edge with solar panel adapts, with the supporting solar panel.Yet the general weight of rectangular metal frame is bigger, and manufacturing cost is higher, and inconvenience is installed.
Recently, the installation pincers of solar cell have been proposed to be used to install.Fig. 1 illustrates a kind of installation pincers 1 of prior art.As shown in Figure 1, pincers 1 are installed are roughly had " worker " font, comprise bottom base 10, support column 20 and upper cover plate 30.The space that support column 20 both sides are centered on by part bottom base 10, support column 20 and part upper cover plate 30 half can be taken in the edge of solar panel (not shown) respectively.The middle part that pincers 1 are installed is provided with the through hole 40 that runs through upper cover plate 30, support column 20 and bottom base 10.Screw rod can pass through hole 40 and thereby pincers will be installed 1 be fixed on the cramp bar (not shown).Pincers 1 are installed generally integrally to be made by EPDM rubber.In order to ensure installation strength, installation pincers 1 generally make thicker, and for example the thickness of bottom base 10 is generally about 20mm, and the thickness of upper cover plate 30 is generally more than the 10mm.Yet, known ground, the general area of solar panel is bigger, and himself weight causes distortion greatly and easily, and for example sink in the middle part.Because the bottom base 10 of installation shown in Figure 1 pincers 1 is thicker,, solar panel can not get the supporting of cramp bar so being out of shape, finally cause breaking glass panel wherein easily.
Fig. 2 illustrates the solar cell of another kind of prior art pincers 2 is installed.As shown in the figure, pincers 2 are installed are comprised the aluminium briquet 50 of similar inverted " Ω " shape, and lay respectively at aluminium briquet 50 both sides and by its separated two EPDM rubber blankets 60.Rubber blanket 60 is roughly " U " shape that lies low and opening outwardly to take in the edge of solar panel (not shown), and aluminium briquet 50 can be compressed on rubber blanket 60 and solar panel wherein on the cramp bar (not shown) together.It is outstanding 61 that the upper corner of " U " shape that lies low of rubber blanket 60 has, and it can be embedded in the respective recesses of aluminium briquet 50 to prevent relatively moving between aluminium briquet 50 and the rubber blanket 60.Yet during installation, the action of gravity of solar panel is on the following horizontal component of rubber blanket 60.When solar panel moved horizontally, the following horizontal component that solar panel drives rubber blanket 60 easily moved together, even may break away from the compacting of aluminium briquet 50.
Therefore, need a kind of solar cell that pincers are installed, it can partially or completely solve problems of the prior art.
The utility model content
During the utility model is devoted to solve the aforementioned problems in the prior at least some or all.
According to an aspect of the present utility model, provide a kind of solar cell that the pincers assembly is installed, comprising:
Briquetting comprises:
Cover plate; And
Protuberance is positioned at the middle part of the lower surface of this cover plate;
Cushion comprises:
Heelpiece;
First and second extend upward part, extend upward and this heelpiece is divided into this first and second mid portion that extends upward between the part from the upper surface of this heelpiece, this first extends upward the outside first in part place and this second extends upward the outside second portion in part place certainly certainly; And
The first and second horizontal-extending parts, respectively from this first and second extend upward the part end along direction horizontal-extending opposite each other,
Wherein, be formed with depression in the lower surface of this protuberance, the upper surface of the mid portion of this heelpiece is formed with projection, this cover plate is pressed on this first and second horizontal-extendings part, this protuberance is inserted in this and first and second extends upward between the part, and the projection that forms on the upper surface of the mid portion of this heelpiece embeds in the depression that forms in the lower surface of this protuberance.
In an embodiment of the present utility model, the thickness of first and second parts of this heelpiece is 2-6mm.
In an embodiment of the present utility model, the thickness of first and second parts of this heelpiece is 2.5-4mm.
In an embodiment of the present utility model, the upper surface of this cover plate has arc.
In an embodiment of the present utility model, this cover plate and this first and second horizontal-extending part do not extend on the optical receiving region of the solar cell that utilizes this solar cell installation pincers assembly installation.
In an embodiment of the present utility model, each has the horizontal-extending length of 5-11mm this first and second horizontal-extendings part, and the edge of this cover plate does not extend beyond this first and second horizontal-extendings part in the horizontal direction.
In an embodiment of the present utility model, lower surface to the small part of the upper surface of first and second parts of this heelpiece and this first and second horizontal-extending part is formed with one of dimpled grain and burr.
In an embodiment of the present utility model, the horizontal-extending length of the first of this heelpiece is greater than the horizontal-extending length of this first horizontal-extending part, and the horizontal-extending length of the second portion of this heelpiece is greater than the horizontal-extending length of this second horizontal-extending part.
In an embodiment of the present utility model, this solar cell is installed the through hole that the pincers assembly also comprises the described mid portion that runs through this cover plate, this protuberance and this cushion.
According to another aspect of the present utility model, provide a kind of solar cell that the pincers assembly is installed, comprising:
Briquetting comprises:
Cover plate; And
Protuberance is positioned at the middle part of the lower surface of this cover plate;
Cushion comprises:
Heelpiece;
First and second extend upward part, extend upward and this heelpiece is divided into this first and second mid portion that extends upward between the part from the upper surface of this heelpiece, this first extends upward the outside first in part place and this second extends upward the outside second portion in part place certainly certainly; And
The first and second horizontal-extending parts, respectively from this first and second extend upward the part end along direction horizontal-extending opposite each other,
Wherein, this cover plate is pressed on this first and second horizontal-extendings part, this protuberance is inserted in this and first and second extends upward between the part, and this solar cell is installed the through hole that pincers assembly also comprises the described mid portion that runs through this cover plate, this protuberance and this cushion.
In an embodiment of the present utility model, this solar cell is installed the pincers assembly and is also comprised the fixed block that is adjacent to be provided with described briquetting and cushion, this fixed block has protuberance in a side adjacent with cushion with described briquetting at least, this protuberance horizontal-extending and be resisted against first or second of described cushion extend upward the part on.
In an embodiment of the present utility model, the protuberance of described fixed block has wedge shape.
In an embodiment of the present utility model, described fixed block also has the through hole that vertically runs through it.
Install in the pincers assembly at solar cell of the present utility model, the two has good globality cushion itself and cushion and briquetting, thus fixed solar battery firmly.Because installing first and second parts of the heelpiece of pincers assembly, solar cell of the present utility model has the thickness range of optimization, so can avoid breaking of glass substrate in the solar cell effectively.In addition, installation pincers modular construction of the present invention is simple, easy to use, greatly reduces cost.
Install in the pincers assembly at solar cell of the present utility model, owing to adopted fixed block, a people can finish the installation of solar panel easily, so just can save a manpower that buttresses cell panel.After the installation, fixed block can be fixed on the downstream of the cramp bar of inclination always, can prevent because the pincers securing member that cushion addles or other factors cause is installed looseningly thus, solar panel landing under the oblique component effect of gravity causes the heavy losses of life and property.
Description of drawings
Fig. 1 illustrates a kind of installation pincers of prior art.
Fig. 2 illustrates the installation pincers of another kind of prior art.
Fig. 3 illustrates the installation pincers assembly according to the utility model one exemplary embodiment.
Fig. 4 illustrates the briquetting of the installation pincers assembly of Fig. 3.
Fig. 5 illustrates the cushion of the installation pincers assembly of Fig. 3.
Fig. 6 schematically shows the installation pincers assembly that is in installment state.
Fig. 7 schematically shows the solar module that utilization is installed according to the installation pincers assembly of the utility model one exemplary embodiment.
Fig. 8 illustrates the installation pincers assembly according to another exemplary embodiment of the utility model.
Fig. 9 illustrates the solar module that use is installed according to the installation pincers assembly of another exemplary embodiment of the utility model.
Embodiment
Fig. 3 illustrates the installation pincers assembly 100 according to the utility model one exemplary embodiment; Fig. 4 illustrates the briquetting 110 of the installation pincers assembly 100 of Fig. 3; Fig. 5 illustrates the cushion 120 of the installation pincers assembly 100 of Fig. 3.
With reference to Fig. 3-5, comprise briquetting 110 and cushion 120 according to the installation of the utility model one exemplary embodiment pincers assembly 100.Briquetting 110 comprises cover plate 111 and is positioned at the protuberance 112 at cover plate 111 lower surfaces middle part.The upper surface of cover plate 111 preferably has circular arc, thereby the middle part of upper surface is higher, and both sides are lower, when the sunlight oblique fire, can reduce or prevent that the shadow falls of cover plate 111 is mapped on the optical receiving region of solar cell thus.The upper surface of cover plate 111 also can be formed with dimpled grain, to play attractive in appearance and anti-skidding effect.In another embodiment of the utility model, the upper surface of cover plate 111 can not be formed with dimpled grain yet.The lower surface of cover plate 11 1 can be flat surfaces.In the embodiment shown in Fig. 3-5, protuberance 112 has hollow structure.In another embodiment (not shown), protuberance also can have solid construction.In the embodiment shown in Fig. 3-5, protuberance 112 with change 111 opposite sides and have depression 113.In another embodiment (not shown) of the utility model, protuberance also can not be formed with depression.Through hole 114 can form the middle part that extends through cover plate 111 with and under protuberance 112.Briquetting 110 preferably for example make by hard material by metal, pottery, duroplasts etc.In embodiment of the present utility model, briquetting 110 can be made by stainless steel, aluminium alloy etc.
With reference to Fig. 3-5, cushion 120 can roughly have inverted " π " shape.Particularly, as shown in Figure 5, cushion 120 comprises heelpiece 121, be basically perpendicular to heelpiece 121 upwardly extending first and second and extend upward portion 122,123, and respectively from the first and second terminal outwards horizontally extending first and second horizontal-extending portions 124,125 that extend upward portion 122,123.First and second extend upward portion 122,123 is divided into three parts with heelpiece 121, promptly extend upward the outside 121-1 of first of portion 122 from first, extend upward the outside second portion 121-2 of portion 123 from second, and the first and second mid portion 121-M that extend upward between part 122 and 123.First and second extend upward the width that spacing between the portion 122,123 can equal the protuberance 112 of briquetting 110 substantially.
Continuation is with reference to Fig. 3-5, the first horizontal-extending part 124, first extends upward the 121-1 of first of part 122 and heelpiece 121 together around first space that is used to take in solar panel, and the second horizontal-extending part 125, second extends upward the second portion 121-2 of part 123 and heelpiece 121 together around second space that is used to take in solar panel.Because the 121-1 of first and the second portion 121-1 of heelpiece 121 are connected to each other by mid portion, prevented effectively that thus the first and second part 121-1 and 121-2 from moving with the solar panel on it, and then fixed solar cell panel more firmly.The first and second part 121-1 of heelpiece 120, the thickness of 121-2 can be 2-6mm, more preferably 2.5-4mm.Adopt this thickness range, because heelpiece 120 is less with the step that cramp bar forms, even because own wt and when being out of shape a little, the supporting that it also can supported bar has effectively prevented breaking of the glass substrate in the solar panel thus when solar panel.In the embodiment shown in Fig. 3-5, also be formed with the corresponding projection 126 of depression 113 in the protuberance 112 with briquetting 110 on the mid portion 121-M of heelpiece 121.During installation, the projection 126 on the mid portion 121-M of heelpiece 121 can be embedded in the depression 113 in the protuberance 112 of briquetting 110, prevents further that thus heelpiece 121 from moving with respect to briquetting 110.In another embodiment (not shown) of the utility model, heelpiece 121 also can not be formed with projection 126.Through hole 127 can form corresponding with through hole 114 and pass the mid portion 121-M of heelpiece 121.
At least a portion of the lower surface of the first and second horizontal-extending parts 124,125 can be formed with dimpled grain.For choosing ground, at least a portion of the lower surface of the first and second horizontal-extending parts 124,125 can be formed with burr.At least a portion of the upper surface of the first and second part 121-1, the 121-2 of heelpiece 121 can be formed with dimpled grain.For choosing ground, at least a portion of the upper surface of the first and second part 121-1, the 121-2 of heelpiece 121 can be formed with burr.Described dimpled grain and burr can increase the coefficient of friction between cushion 120 and the solar panel, and can cushion the pressure that is applied to solar panel.Cushion 120 can integrally be formed by elastomeric material.For example, cushion 120 can be formed such as EPDM rubber by rubber.
Fig. 6 schematically shows the installment state that the pincers assembly is installed.As shown in Figure 6, briquetting 110 is pressed on the cushion 120, and the protuberance 112 of briquetting 110 is inserted in first and second spaces that extend upward between the portion of cushion 120.The projection 126 of heelpiece 121 is embedded in the depression 113 on the protuberance 112.Securing member 128 for example bolt pass the through hole in briquetting 110 and the cushion 120 and should install pincers assembly be fixed on the cramp bar 129.
It should be noted that, as shown in Figure 6, the first horizontal-extending part 124, first extends upward the 121-1 of first of part 122 and heelpiece 121 together around first space that is used to take in solar panel, the second horizontal-extending part 125, second extends upward the second portion 121-2 of part 123 and heelpiece 121 together around second space that is used to take in solar panel, and briquetting 110 is pressed on cushion 120 and the solar panel wherein taken on the cramp bar 129.Optical receiving region in the middle of the upper surface of solar panel generally includes and the peripheral clear area that centers on optical receiving region.In order not influence the light receiving efficiency of solar panel, each does not preferably extend to the first and second horizontal-extending parts 124,125 and cover plate 111 on the optical receiving region of solar panel.When considering sun oblique fire the first and second horizontal-extending parts 124,125 with and on the shade of cover plate 111, the preferred first and second horizontal-extending parts 124,125 with and on the edge of cover plate 111 apart from the optical receiving region 1-3mm of corresponding solar cell plate (note, be horizontal range).Generally speaking, the edge of the cover plate 111 and the first and second horizontal-extending parts 124,125 is thick more, and the distance between itself and the optical receiving region is preferably far away more.Otherwise the edge of the cover plate 111 and the first and second horizontal-extending parts 124,125 is thin more, and the distance between itself and the optical receiving region can be nearer.Usually, there is the width of 8-12mm the peripheral clear area of solar panel, the thickness sum at the edge of one of the edge of cover plate 111 and first and second horizontal-extending parts 124,125 is 2.5-4mm, and the development length of first and second horizontal-extendings part is preferably 5-11mm.Preferably, do not extend beyond the first and second horizontal-extending parts on cover plate 111 horizontal directions.First and second part 121-1 of heelpiece 121 and the development length of 121-2 can be provided with flexibly.Preferably, the horizontal-extending length of the first and second part 121-1 and 121-2 is greater than the horizontal-extending length of first and second horizontal-extendings part.
Fig. 7 schematically shows the solar module that utilization is installed according to the installation pincers assembly of the utility model one exemplary embodiment.As shown in the figure, utilize two installation pincers assemblies 100 of the present utility model that the edge of solar panel 300 is fixed on the cramp bar 129 respectively at any two opposite edges places of solar panel 300.Notice that the upside of two installation pincers assemblies or two downsides that the pincers assemblies are installed in the above below also can continue to be provided with an adjacent solar battery plate.The array of solar panel can be set in this way.Fig. 7 only is exemplary, rather than restrictive.One of ordinary skill in the art would recognize that, can make variation as required in the quantity of cramp bar 129 and the aspects such as quantity of position and installation pincers assembly 100.
One exemplary embodiment of installation pincers assembly of the present utility model has been described above.When use installation pincers assembly 100 is installed solar panels, one of skill in the art will appreciate that before solar panel 300 insertion installations clamp assemblies 100, the pincers assembly is installed cannot be locked.And solar panel generally is installed on the cramp bar of inclination, therefore, needs a people to buttress solar panel, and another people fixes this installation pincers assembly.
Fig. 8 illustrates the installation pincers assembly according to another exemplary embodiment of the utility model.Fig. 9 illustrates the solar module that use is installed according to the installation pincers assembly of another exemplary embodiment of the utility model.As shown in Figure 8, according to the installation of another exemplary embodiment of the utility model pincers assembly 200 except comprise with aforementioned installation pincers assembly 100 essentially identical installations pincers 100 ', also comprise and the fixed block 130 that pincers 100 ' be adjacent to be provided with are installed.Omit describing in further detail herein, to same parts.
Fixed block 130 has protuberance 131 with the side that pincers 100 ' adjacent are installed at least.Fig. 8 illustrates fixed block 130 and has protuberance 131 in relative both sides.Protuberance 131 can insert in the U-shaped opening of cushion and be resisted against first or second of cushion and extend upward on the sidewall of protuberance of part and briquetting.Protuberance 131 can have approximate wedge shape, comprises the upper and lower surface of inclination, can insert easily in the U-shaped opening of cushion thus.Thereby fixed block 130 has the through hole that runs through can be fixed on the cramp bar 129 by means of securing member.During installation, can earlier fixed block 130 be fixed in the bottom of inclination cramp bar, pincers 100 ' place fixed block 130 upstreams will be installed then, with solar panel 300 insert install pincers 100 ' the U-shaped opening opposite with fixed block 130 in, and fastening installation pincers 100 ', finish the installation of solar panel 300 thus.Afterwards, those skilled in the art can continue to install a plurality of solar panels from the downstream of the cramp bar 129 that tilts towards the upstream, as shown in Figure 9.As can be seen, utilize 200, one people of this installation pincers assembly can finish the installation of solar panel easily, so just can save a manpower that buttresses cell panel.After the installation, fixed block 130 can disassemble be used for other install pincers 100 ' installation, can also be fixed on the downstream of the cramp bar 129 of inclination always, can prevent because the pincers securing member that cushion addles or other factors cause is installed loosening thus, solar panel landing under the oblique component effect of gravity causes the heavy losses of life and property.
Disclosing exemplary embodiment of the present utility model at this, though used specific term, only is for description and illustrative purposes at this employed term, rather than in order to limit.Therefore, those having ordinary skill in the art will appreciate that under the situation of the spirit and scope of the present utility model that do not break away from the claim qualification, can carry out various variations in detail.

Claims (16)

1. a solar cell is installed the pincers assembly, it is characterized in that, comprising:
Briquetting comprises:
Cover plate; And
Protuberance is positioned at the middle part of the lower surface of this cover plate;
Cushion comprises:
Heelpiece;
First and second extend upward part, extend upward and this heelpiece is divided into this first and second mid portion that extends upward between the part from the upper surface of this heelpiece, this first extends upward the outside first in part place and this second extends upward the outside second portion in part place certainly certainly; And
The first and second horizontal-extending parts, respectively from this first and second extend upward the part end along direction horizontal-extending opposite each other,
Wherein, be formed with depression in the lower surface of this protuberance, the upper surface of the mid portion of this heelpiece is formed with projection, this cover plate is pressed on this first and second horizontal-extendings part, this protuberance is inserted in this and first and second extends upward between the part, and the projection that forms on the upper surface of the mid portion of this heelpiece embeds in the depression that forms in the lower surface of this protuberance.
2. solar cell as claimed in claim 1 is installed the pincers assembly, and the thickness that it is characterized in that first and second parts of this heelpiece is 2-6mm.
3. solar cell as claimed in claim 2 is installed the pincers assembly, and the thickness that it is characterized in that first and second parts of this heelpiece is 2.5-4mm.
4. solar cell as claimed in claim 1 is installed the pincers assembly, it is characterized in that the upper surface of this cover plate has last convex.
5. solar cell installation pincers assembly as claimed in claim 1 is characterized in that this cover plate and this first and second horizontal-extending part does not extend on the optical receiving region of the solar cell that utilizes this solar cell installation pincers assembly installation.
6. solar cell as claimed in claim 1 is installed the pincers assembly, each has the horizontal-extending length of 5-11mm to it is characterized in that this first and second horizontal-extendings part, and the edge of this cover plate does not extend beyond this first and second horizontal-extendings part in the horizontal direction.
7. solar cell as claimed in claim 1 is installed the pincers assembly, it is characterized in that upper surface and this first and second horizontal-extending lower surface to small part partly of first and second parts of this heelpiece is formed with one of dimpled grain and burr.
8. solar cell as claimed in claim 1 is installed the pincers assembly, the horizontal-extending length of first that it is characterized in that this heelpiece is greater than the horizontal-extending length of this first horizontal-extending part, and the horizontal-extending length of the second portion of this heelpiece is greater than the horizontal-extending length of this second horizontal-extending part.
9. solar cell as claimed in claim 1 is installed the pincers assembly, it is characterized in that, also comprises the through hole of the described mid portion that runs through this cover plate, this protuberance and this cushion.
10. as each described solar cell of claim 1 to 9 the pincers assembly is installed, it is characterized in that, also comprise the fixed block that is adjacent to be provided with described briquetting and cushion, this fixed block has protuberance in a side adjacent with cushion with described briquetting at least, this protuberance horizontal-extending and be resisted against first or second of described cushion extend upward the part on.
11. solar cell as claimed in claim 10 is installed the pincers assembly, it is characterized in that the protuberance of described fixed block has wedge shape.
12. solar cell as claimed in claim 10 is installed the pincers assembly, it is characterized in that described fixed block also has the through hole that vertically runs through it.
13. a solar cell is installed the pincers assembly, it is characterized in that, comprising:
Briquetting comprises:
Cover plate; And
Protuberance is positioned at the middle part of the lower surface of this cover plate;
Cushion comprises:
Heelpiece;
First and second extend upward part, extend upward and this heelpiece is divided into this first and second mid portion that extends upward between the part from the upper surface of this heelpiece, this first extends upward the outside first in part place and this second extends upward the outside second portion in part place certainly certainly; And
The first and second horizontal-extending parts, respectively from this first and second extend upward the part end along direction horizontal-extending opposite each other,
Wherein, this cover plate is pressed on this first and second horizontal-extendings part, this protuberance is inserted in this and first and second extends upward between the part, and this solar cell is installed the through hole that pincers assembly also comprises the described mid portion that runs through this cover plate, this protuberance and this cushion.
14. solar cell as claimed in claim 13 is installed the pincers assembly, it is characterized in that, also comprise the fixed block that is adjacent to be provided with described briquetting and cushion, this fixed block has protuberance in a side adjacent with cushion with described briquetting at least, this protuberance horizontal-extending and be resisted against first or second of described cushion extend upward the part on.
15. solar cell as claimed in claim 14 is installed the pincers assembly, it is characterized in that the protuberance of described fixed block has wedge shape.
16. solar cell as claimed in claim 14 is installed the pincers assembly, it is characterized in that described fixed block also has the through hole that vertically runs through it.
CN200820178952U 2008-11-20 2008-11-20 Solar cell-mounting clamp module Expired - Fee Related CN201374339Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200820178952U CN201374339Y (en) 2008-11-20 2008-11-20 Solar cell-mounting clamp module

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200820178952U CN201374339Y (en) 2008-11-20 2008-11-20 Solar cell-mounting clamp module

Publications (1)

Publication Number Publication Date
CN201374339Y true CN201374339Y (en) 2009-12-30

Family

ID=41500421

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200820178952U Expired - Fee Related CN201374339Y (en) 2008-11-20 2008-11-20 Solar cell-mounting clamp module

Country Status (1)

Country Link
CN (1) CN201374339Y (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102208462A (en) * 2011-05-26 2011-10-05 泰通(泰州)工业有限公司 Photovoltaic power station mounting bracket system and fastening clamping block member thereof
US8407895B2 (en) 2010-07-29 2013-04-02 First Solar, Inc. Methods of manufacturing a slider clip for holding a photovoltaic structure
EP2461119A3 (en) * 2010-12-03 2015-11-25 HILTI Aktiengesellschaft Clamp for a plate element, in particular for a photovoltaic module
CN105471380A (en) * 2015-12-25 2016-04-06 上海正硅实业发展有限公司 Solar photovoltaic module mounting bracket system
CN105702771A (en) * 2016-04-11 2016-06-22 张家港协鑫集成科技有限公司 Photovoltaic structure and determination method for power shift of same
US20230308046A1 (en) * 2015-06-09 2023-09-28 Nextracker Llc Frameless solar module mounting
US11949371B2 (en) 2020-12-23 2024-04-02 Array Technologies, Inc. Photovoltaic module deflection limiter

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8894033B2 (en) 2010-07-29 2014-11-25 First Solar, Inc Slider clip and photovoltaic structure mounting system
US9551510B2 (en) 2010-07-29 2017-01-24 First Solar, Inc. Slider clip and photovoltaic structure mounting system
US8413946B2 (en) 2010-07-29 2013-04-09 First Solar, Inc. Photovoltaic structure mounting apparatus and system having a slider clip
US8413312B2 (en) 2010-07-29 2013-04-09 First Solar, Inc. Methods of installing photovoltaic structures on a support element
US8418983B2 (en) 2010-07-29 2013-04-16 First Solar, Inc. Slider clip and photovoltaic structure mounting system
US8418984B2 (en) 2010-07-29 2013-04-16 First Solar, Inc. Slider clip and photovoltaic structure mounting system
US8407895B2 (en) 2010-07-29 2013-04-02 First Solar, Inc. Methods of manufacturing a slider clip for holding a photovoltaic structure
EP2461119A3 (en) * 2010-12-03 2015-11-25 HILTI Aktiengesellschaft Clamp for a plate element, in particular for a photovoltaic module
CN102208462A (en) * 2011-05-26 2011-10-05 泰通(泰州)工业有限公司 Photovoltaic power station mounting bracket system and fastening clamping block member thereof
US20230308046A1 (en) * 2015-06-09 2023-09-28 Nextracker Llc Frameless solar module mounting
US11962268B2 (en) * 2015-06-09 2024-04-16 Nextracker Llc Frameless solar module mounting
CN105471380A (en) * 2015-12-25 2016-04-06 上海正硅实业发展有限公司 Solar photovoltaic module mounting bracket system
CN105471380B (en) * 2015-12-25 2019-04-26 上海正硅实业发展有限公司 A kind of solar photovoltaic assembly mounting bracket system
CN105702771A (en) * 2016-04-11 2016-06-22 张家港协鑫集成科技有限公司 Photovoltaic structure and determination method for power shift of same
US11949371B2 (en) 2020-12-23 2024-04-02 Array Technologies, Inc. Photovoltaic module deflection limiter

Similar Documents

Publication Publication Date Title
CN201374339Y (en) Solar cell-mounting clamp module
CN107130760B (en) Combined wallboard convenient to install
WO2018223624A1 (en) Mounting bracket and mounting assembly of photovoltaic module
WO2005103408A1 (en) Solar cell module and attaching structure therefor and tile material used therefor
CN211421507U (en) Stone curtain wall connecting structure
CN205490320U (en) Photovoltaic support of high generating efficiency
JP2009130183A (en) Mount for solar cell module, and fitting structure
CN114892902A (en) Various steel tile fixing device, photovoltaic tile and photovoltaic power generation system
CN202285239U (en) Solar panel fastening device
CN202601636U (en) Photovoltaic assembly and photovoltaic system
CN213390742U (en) Building curtain wall glass anti-drop device
CN210351072U (en) Frame and photovoltaic system
CN212413089U (en) Special fixture assembly for guide-rail-free flexible roof photovoltaic support
CN202401681U (en) Supporting structure of photovoltaic component bracket
CN209283144U (en) Roof photovoltaic module and roofing
CN209907750U (en) A subassembly for stainless steel building roofing system and roofing system thereof
CN208539832U (en) A kind of solar photovoltaic bracket
CN201893727U (en) Frame fixing clamp
CN201193382Y (en) Fixed connection compact of upright overlock roof system
CN217975108U (en) Photovoltaic power generation system
CN210002712U (en) sectional material with bracket mounting function on color steel tile and photovoltaic module thereof
CN217630923U (en) Connecting device and photovoltaic building
CN216380310U (en) Photovoltaic color steel tile structure assembly and photovoltaic building
CN218997970U (en) Weldable photovoltaic bracket system
CN218217233U (en) Photovoltaic module dust keeper and roof photovoltaic module

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: BEIJING JINGCHENG APOLLO OPTOELECTRONIC EQUIPMENT

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20111121

Address after: 362000 Jiangnan hi tech Zone, South Ring Road, Licheng District, Fujian, Quanzhou

Co-patentee after: Beijing Jingcheng Boyang Optoelectronic Equipment Co.,Ltd.

Patentee after: Fujian Golden Sun Solar Technic Co., Ltd.

Address before: 362000 Jiangnan hi tech Zone, South Ring Road, Licheng District, Fujian, Quanzhou

Patentee before: Fujian Golden Sun Solar Technic Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20091230

Termination date: 20161120