CN201372565Y - Movable operation platform bracket of gas-discharging chimney - Google Patents

Movable operation platform bracket of gas-discharging chimney Download PDF

Info

Publication number
CN201372565Y
CN201372565Y CN200920084089U CN200920084089U CN201372565Y CN 201372565 Y CN201372565 Y CN 201372565Y CN 200920084089 U CN200920084089 U CN 200920084089U CN 200920084089 U CN200920084089 U CN 200920084089U CN 201372565 Y CN201372565 Y CN 201372565Y
Authority
CN
China
Prior art keywords
bolt
crossbeam
hound
bolt hole
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN200920084089U
Other languages
Chinese (zh)
Inventor
赵海莲
桂祁东
蔡晓波
吴红来
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN200920084089U priority Critical patent/CN201372565Y/en
Application granted granted Critical
Publication of CN201372565Y publication Critical patent/CN201372565Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to an operation platform bracket, in particular to a movable operation platform bracket of a gas-discharging chimney. The bracket is characterized in that the bracket comprises an upper rod, a crossbeam, a first bolt, a brace rod, a second bolt and a lower rod; the right end of the crossbeam is fixedly connected with the lower end of the upper rod; the left end of the crossbeam is fixedly connected with the upper end of the lower rod; the right part of the crossbeam and the upper end of the brace rod are provided with a first bolt hole respectively; the lower part of the lower rod and the lower end of the brace rod are provided with a second bolt hole respectively; the crossbeam is connected with the brace rod by the first bolt which passes through the first bolt hole; and the lower rod is connected with the brace rod by the second bolt which passes through the second bolt hole. The movable operation platform bracket has the advantages of simple structure and convenient and flexible usage.

Description

Coal gas diffusion chimney removable job platform support
Technical field
The utility model relates to a kind of job platform support, mainly is applicable to higher steel work cylindrical shell installation, and the most typical structure is that blast furnace diffuses chimney, and is suitable for the steel cylinder building of other any similar structures.
Background technology
At present, the cylindrical shell steel structure body is installed and is adopted scaffolding, placement platform plate on the scaffold; Scaffold is normally taken cylindrical shell steel work top from ground, and the number of components that constitutes scaffold is bigger, and transportation, loading and unloading are very not square more.
Summary of the invention
The purpose of this utility model is to provide a kind of simple in structure, easy to use, coal gas diffusion chimney removable job platform support flexibly.
To achieve these goals, the technical solution of the utility model is: coal gas diffusion chimney removable job platform support, it is characterized in that it comprises upper boom, crossbeam, first bolt, hound, second bolt, lower beam, fixedlying connected with the bottom of upper boom in the right part of crossbeam, fixedlys connected with the upper end of lower beam in the left part of crossbeam; The right part of crossbeam, the upper end of hound are provided with first bolt hole respectively, and the bottom of lower beam, the bottom of hound are provided with second bolt hole respectively; Crossbeam passes first bolt hole with hound by first bolt and is connected, and lower beam passes second bolt hole with hound by second bolt and is connected.
The beneficial effects of the utility model are:
1, parts are few, and are simple in structure.
2, applied widely.Be not only applicable to steel stack, the cylindrical shell steel structure body of similar chimney all can adopt.
3, utilize height, effect by force.No matter the how high covering device of cylindrical shell (being made of a pack support and landing slab) gets final product, utilization rate 100% has the powerful superiority of installation exercise and security protection dual characteristics.
4, easy to use, flexibility good.Very easy to use, and can dismantle whenever and wherever possible and install according to user's needs, need not Aided Machine and just can finish by hand.
5, cost is low, income is high.Support is that common shaped steel is welded, but the simplicity of design field fabrication.Adopt this support then to need not to weld again other temporary fixed supports, avoided the waste of interim material.The dual characteristics of operation and security protection also greatly reduces the safety measure expense.
Description of drawings
Fig. 1 is a structural representation of the present utility model;
Fig. 2 is the sectional view of Fig. 1 along the A-A line;
Fig. 3 is user mode figure of the present utility model;
Fig. 4 is the vertical view of Fig. 3;
Among the figure: 1-annular safety chain, 2-upper boom, 3-crossbeam, 4-landing slab, 5-first bolt, 6-hound, 7-the-fixed head, 8-second bolt, 9-lower beam, 10-second fixed head, 11-cylindrical shell, 12-coal gas diffusion chimney removable job platform support.
The specific embodiment
As shown in Figure 1 and Figure 2, coal gas diffusion chimney removable job platform support, it comprises upper boom 2, crossbeam 3, first bolt 5, hound 6, second bolt 8, lower beam 9, (as adopting welding) fixedlyed connected in the right part of crossbeam 3, and (left side among Fig. 1 is a left end with the bottom of upper boom 2, the right is a right-hand member), fixedly connected with the upper end of lower beam 9 (as adopting welding) in the left part of crossbeam 3; The upper end of the right part of crossbeam 3, hound 6 is provided with first bolt hole respectively, and the bottom of the bottom of lower beam 9, hound 6 is provided with second bolt hole respectively; Crossbeam 3 passes first bolt hole with hound 6 by first bolt 5 and is connected (bolt screws on nut); Lower beam 9 passes second bolt hole with hound 6 by second bolt 8 and is connected (bolt screws on nut).The upper end of described upper boom 2 is provided with annular safety chain 1.
First fixed head 7, second fixed head 10 respectively with the welding of the outer wall of steel work cylindrical shell 11, constitute first jack between the outer wall of first fixed head 7 and steel work cylindrical shell, constitute second jack between the outer wall of second fixed head 10 and steel work cylindrical shell, first fixed head 7 is positioned at the top of second fixed head 10, and the center line of the center line of first jack and second jack is positioned on the same vertical line.Lower beam 9 inserts in first jack, second jack.
Upper boom 2, crossbeam 3, hound 6, lower beam 9 all adopt ∠ 75 * 6 angle steel; First bolt 5, second bolt 8 all adopt M16 type plain bolt; First fixed head 7, second fixed head 10 all adopt the steel plate of δ=6mm; Annular safety chain 1 adopts seizing wire.Landing slab 4 adopts easily detachable bamboo springboard.
Use (erection sequence and method): step 1: prepare the coal gas diffusion chimney removable job platform support 12 (be called for short support 12, present embodiment adopts 12, below describes by 12 supports 12) more than at least 8; The upper boom 2 of each support 12, crossbeam 3, lower beam 9 be welding fabrication (but field Welding moulding); Step 2: sustained height is along circumference welding 12 first fixed heads 7 (uniform) on the outer wall of steel work cylindrical shell, sustained height is along circumference welding 12 second fixed heads 10 (uniform) on the outer wall of steel work cylindrical shell, last bottom plate respectively keeps sustained height, and three weld all arounds are adopted in fixed head and cylinder body outer wall welding; Step 3: the lower beam 9 of 12 supports 12 is inserted in second jack of first jack, second fixed head 10 of corresponding separately first fixed head 7, by first bolt 5, second bolt 8 hound 6 is connected locking with upper boom 2, lower beam 9 respectively then; Step 4: on the crossbeam 3 of 12 supports 12, lay landing slab 4; Need that all colligation is firm at a certain distance with landing slab and landing slab and crossbeam with iron wire; Step 5: wear annular safety chain 1, pin two and tension with flower basket bolt after the chain closure.Can form a firm overall operation platform after the installation.Wherein landing slab, support (safe chain) are knockdown pieces (first fixed head 7, second fixed head 10 can not pulled down, and weld first fixed head 7, second fixed head 10 up again; First fixed head 7, second fixed head 10 also can cut down respectively), along with the continuous rising of setting height(from bottom) and the change of installation site, this support can be disassembled, install once more at assigned address according to customer requirements, realize job platform automatic lifting, follow one's inclinations mobile, safe and reliable.

Claims (2)

1. coal gas diffusion chimney removable job platform support, it is characterized in that it comprises upper boom (2), crossbeam (3), first bolt (5), hound (6), second bolt (8), lower beam (9), fixedlying connected with the bottom of upper boom (2) in the right part of crossbeam (3), fixedlys connected with the upper end of lower beam (9) in the left part of crossbeam (3); The upper end of the right part of crossbeam (3), hound (6) is provided with first bolt hole respectively, and the bottom of the bottom of lower beam (9), hound (6) is provided with second bolt hole respectively; Crossbeam (3) passes first bolt hole with hound (6) by first bolt (5) and is connected, and lower beam (9) passes second bolt hole with hound (6) by second bolt (8) and is connected.
2. coal gas diffusion chimney removable job platform support according to claim 1, it is characterized in that: the upper end of described upper boom (2) is provided with annular safety chain (1).
CN200920084089U 2009-03-10 2009-03-10 Movable operation platform bracket of gas-discharging chimney Expired - Fee Related CN201372565Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200920084089U CN201372565Y (en) 2009-03-10 2009-03-10 Movable operation platform bracket of gas-discharging chimney

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200920084089U CN201372565Y (en) 2009-03-10 2009-03-10 Movable operation platform bracket of gas-discharging chimney

Publications (1)

Publication Number Publication Date
CN201372565Y true CN201372565Y (en) 2009-12-30

Family

ID=41498645

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200920084089U Expired - Fee Related CN201372565Y (en) 2009-03-10 2009-03-10 Movable operation platform bracket of gas-discharging chimney

Country Status (1)

Country Link
CN (1) CN201372565Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104032944A (en) * 2014-06-23 2014-09-10 山东电力建设第一工程公司 Suspension frame construction platform device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104032944A (en) * 2014-06-23 2014-09-10 山东电力建设第一工程公司 Suspension frame construction platform device

Similar Documents

Publication Publication Date Title
CN101839070B (en) Construction method for temporarily supporting and strengthening reinforced concrete structured beam by using steel column
CN201714050U (en) Integral triangular support operating platform for elevator shaft
CN203499229U (en) Operating platform for construction of elevator shaft
CN103206074A (en) Elevator shaft template construction method, platform and support
CN205604254U (en) Foundation ditch steel bearing structure
CN103470018A (en) Detachable converter tooling platform
CN105442866A (en) Protective dismantle and assembly method for large-scale towering steel structures
CN108862081A (en) A kind of chain block crane boom and the application in the adjusting of beam steel protective layer thickness
CN204282803U (en) To encorbelment formwork structure for mounting platform
CN201372565Y (en) Movable operation platform bracket of gas-discharging chimney
CN101492961B (en) Method for making removable job platform for coal gas discharging chimney
CN205741942U (en) A kind of great cantilever chooses arm pier cap beam segmental timbering
CN204311717U (en) Detachable combined Mobile operating platform
CN210483094U (en) Inverted triangular pipe truss lifting device
CN201865330U (en) Device used for constructing cantilever scaffold bottom platform
CN204040437U (en) Cantilever tripod and single protective frame system of encorbelmenting
CN208965414U (en) Pier stud stock casting platform
CN201284559Y (en) Fastener type steel pipe scaffold template stand
CN103498551A (en) Lift shaft section steel construction operating platform
CN203531347U (en) Detachable converter tooling platform
CN203257075U (en) Core tube inner lifting type multifunctional operating platform for high-rise building construction
CN111622485A (en) Chimney lining masonry construction operation platform and construction method thereof
CN201924585U (en) Fixed device for reinforcing bottom of upright rod of suspension scaffold for building
CN105970893A (en) Combined round rack pile leg construction platform
CN206503347U (en) A kind of platform for being used to repair grab bucket

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA FIRST METALLURGICAL CONSTRUCTION GROUP CORPO

Free format text: FORMER NAME: CHINA FIRST METALLURGICAL CONSTRUCTION CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 430081 Wuhan Industrial Zone, Qingshan District, Hubei, No. 3

Patentee after: China First Metallurgical Group Co., Ltd.

Address before: 430081 Wuhan Industrial Zone, Qingshan District, Hubei, No. 3

Patentee before: China First Metallurgical Construction Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20091230

Termination date: 20170310