CN201368673Y - Alarming type air brick - Google Patents

Alarming type air brick Download PDF

Info

Publication number
CN201368673Y
CN201368673Y CNU2009201453499U CN200920145349U CN201368673Y CN 201368673 Y CN201368673 Y CN 201368673Y CN U2009201453499 U CNU2009201453499 U CN U2009201453499U CN 200920145349 U CN200920145349 U CN 200920145349U CN 201368673 Y CN201368673 Y CN 201368673Y
Authority
CN
China
Prior art keywords
pipe
air brick
air
warning
communicated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2009201453499U
Other languages
Chinese (zh)
Inventor
贺中央
孙荣海
李雪冬
王锋刚
李久涛
刘国威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YINGKOU PUNAI MAGNESIUM MATERIALS CO Ltd
Puyang Refractories Group Co Ltd
Original Assignee
YINGKOU PUNAI MAGNESIUM MATERIALS CO Ltd
Puyang Refractories Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YINGKOU PUNAI MAGNESIUM MATERIALS CO Ltd, Puyang Refractories Group Co Ltd filed Critical YINGKOU PUNAI MAGNESIUM MATERIALS CO Ltd
Priority to CNU2009201453499U priority Critical patent/CN201368673Y/en
Application granted granted Critical
Publication of CN201368673Y publication Critical patent/CN201368673Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/20Recycling

Landscapes

  • Measuring Volume Flow (AREA)

Abstract

An alarming type air brick comprises an air brick body, an air chamber arranged on the lower portion of the air brick body, thin pipes which are arranged inside the air brick body and whose lower ends are communicated with the air chamber, an air inlet pipe whose upper end is communicated with the air chamber, wherein the lower end of at least one of the fine pipes is communicated with the air chamber through an alarming pipe and forms a composite ventilating pipe, the length of the alarming pipe is larger than or equal to the smallest safety height of the alarming type air brick, and the section area of the alarming pipe is larger than the section area of the fine pipes. The alarming type air brick provided by the utility model has simple production manufacturing, is safer and has lower cost.

Description

A kind of alarm type air brick
Technical field
The utility model relates to smelting uses function element, specifically a kind of alarm type air brick.
Background technology
For satisfying the requirement that modern society improves constantly steel quality, the numerous and confused technology such as electromagnetic agitation, gas stirring that adopt are come even molten steel composition and temperature in continuous casting process, promote inclusion floating, wherein the gas stirring technique is generally applied owing to have advantages such as equipment is simple, easy to operate, cost is low, effective.Owing to be subjected to the influence of the characteristics of residing smelting equipment own, converter bottom-blown air brick and electric furnace bottom-blown air brick (hereinafter to be referred as converter and electric furnace air brick) are constantly deteriorated in smelting process, the bleed-out accident will take place as untimely warning replacing, therefore lose hugely, require converter and electric furnace will have good warning device or claim peace to show mode with air brick.
In the prior art, there is a kind of peace of with the bottom of air brick rod iron or the prefabricated section of anti-the material being installed to show mode at ladle, when air brick is deteriorated to minimum safe height, to see rod iron or the prefabricated section of anti-material the with the different contrasts of air brick from the section part of air brick, warn operating personnel's blowing out with this and in time change air brick, but owing to generally require converter and electric furnace to have long service life (reaching hundreds of usually) to several thousand stoves with air brick, so often all adopt the manufacturing of magnesium carbon material, so just make its whole section become more black, when deteriorating to minimum safe height, can't significantly distinguish rod iron or the prefabricated section of anti-the material by contrast, warning function is not obvious even do not have a warning function, therefore, the apparent mode of this peace is unsuitable for converter and electric furnace air brick.Also have a kind of peace to show among mode such as the Chinese patent literature CN201081561Y and disclose a kind of Alarm-type electric arc furnace bottom blowing gas supplying components, under air supply device safe altitude line, bury the warning steel pipe of radicle sealing underground at the air supply device inner bottom part, simultaneously the warning steel pipe is welded on the air chamber base plate, and communicate with the warning air inlet pipe, its air inlet is independent of the bottom blowing air inlet pipe, draws outside the air chamber, joins with air supply system; In addition, the warning steel pipe is connected with flow detector.This warning device is when the height of air supply device (being the electric furnace bottom-blown air brick) is in safe range, because warning steel pipe upper end closed, the flowmeter numerical value of warning air inlet pipe is zero; When the height of air supply device deteriorated under the safe altitude line, the upper end of warning steel pipe was melt through, the air demand surge, the flowmeter of warning air inlet pipe demonstrates numerical value, thereby give the alarm to operating personnel, air supply brick is changed in operating personnel's blowing out in time, prevents bleed-out.But the warning device of this structure has following shortcoming: 1. since the warning air inlet pipe pass air chamber and be communicated with the warning steel pipe, need pass through the air chamber place in the warning air inlet pipe tightly welds, with anti-gas-leak, increased the air brick making step, make operation become loaded down with trivial details, in case and weld leaks gas, must shut-down (breakdown) mainteance, production is made a big impact; 2. because the warning air inlet pipe must be passed air chamber and just can be communicated with the warning steel pipe, the warning air inlet pipe of the Zhi Zaoing part that need extend just can stretch into and draws air chamber like this, has caused certain cost to waste so undoubtedly; 3. owing to the warning air inlet pipe only is connected with a warning steel pipe, in case this root warning steel pipe is filled in cold steel (being that molten steel enters this warning steel pipe cooling curing), even if then the height of air supply device deteriorates below the safe altitude line, the upper end of this warning steel pipe also can't be circulated, air-flow can't pass through, flowmeter can not demonstrate any numerical value, can't start the warning effect, has very big potential safety hazard.
The utility model content
For this reason, technical problem to be solved in the utility model is to provide a kind of simple, safer and lower-cost alarm type air brick of manufacturing.
For solving the problems of the technologies described above, the utility model is achieved through the following technical solutions:
A kind of alarm type air brick, comprise air brick body, be arranged on described air brick body bottom air chamber, be arranged on the tubule that described air brick body inside and lower end be communicated with described air chamber, the air inlet pipe that the upper end is communicated with described air chamber, the lower end of at least one described tubule is communicated with the compound permeability cell of formation by the pipe of reporting to the police with described air chamber, the length of described warning pipe is more than or equal to the minimum safe height of described alarm type air brick, and the cross-sectional area of described warning pipe is greater than the cross-sectional area of described tubule.
In the above-mentioned alarm type air brick, described air inlet pipe is provided with flowmeter.
In the above-mentioned alarm type air brick, the cross sectional shape of described warning pipe and described tubule is circular.
In the above-mentioned alarm type air brick, the lower end of at least two described tubules is communicated with the described compound permeability cell of formation by described warning pipe with described air chamber.
Technique scheme of the present utility model has the following advantages compared to existing technology: alarm type air brick 1. of the present utility model, in the alarm type air brick, be provided with compound permeability cell, the warning pipe of its lower end is communicated with air chamber, this warning pipe needn't pass air chamber, need not tightly to weld with the junction of air chamber at the pipe of reporting to the police, simplified the making step of air brick, its leak rate reduces greatly, improved production efficiency, even if this junction leaks gas, the gas that spills also can enter air brick body, can not have any impact to producing, and can fully guarantee production safety; 2. alarm type air brick of the present utility model, the warning pipe in the compound permeability cell need not special lengthening and make it to pass through air chamber, have saved part tubing, have saved production cost to a certain extent; 3. alarm type air brick of the present utility model, the lower end of at least two tubules is communicated with the compound permeability cell of formation by the pipe of reporting to the police with air chamber, even a certain warning pipe close is gone into cold steel, can also report to the police by other pipes of reporting to the police, and guarantees production safety.
Description of drawings
For the easier quilt of content of the present utility model is clearly understood, according to specific embodiment of the utility model also in conjunction with the accompanying drawings, the utility model is described in further detail, wherein below
Fig. 1 is the cutaway view of the utility model alarm type air brick.
Reference numeral is expressed as among the figure: 1-air brick body, 2-air chamber, 3-tubule, 4-air inlet pipe, 5-flowmeter, the 6-pipe of reporting to the police.
The specific embodiment
As shown in Figure 1, the alarm type air brick that the utility model provides is converter and electric furnace air brick, comprise air brick body 1, be arranged on described air brick body 1 bottom air chamber 2, be arranged on the tubule 3 that described air brick body 1 inside and lower end be communicated with described air chamber 2, the air inlet pipe 4 that the upper end is communicated with described air chamber 2.Described air brick body 1 is made by anti-material.
On described air inlet pipe 4, be provided with flowmeter 5, be used for measuring the gas flow of described air inlet pipe 4.The lower end of at least one described tubule 3 is communicated with the compound permeability cell of formation by the pipe 6 of reporting to the police with described air chamber 2, and the upper end of described tubule 3 is the outlet side of described compound permeability cell, and the lower end of described warning pipe 6 is the inlet end of described compound permeability cell.In the present embodiment, the lower end that two described tubules 3 are arranged is communicated with the compound permeability cell of formation by the pipe 6 of reporting to the police with described air chamber 2.
The length of described warning pipe 6 is more than or equal to the minimum safe height of described alarm type air brick, and in the present embodiment, the length of described warning pipe 6 equals the minimum safe height of described alarm type air brick.And the cross-sectional area of described warning pipe 6 is greater than the cross-sectional area of described tubule 3, and in the present embodiment, the cross sectional shape of described warning pipe 6 and described tubule 3 is circular.
The course of work of the alarm type air brick that the utility model provides is described in detail in detail below:
When described alarm type air brick normally used, described compound permeability cell was given vent to anger by the upper end of described tubule 3, and described flowmeter 5 shows a stability number; When described alarm type air brick is deteriorated described minimum safe height to described alarm type air brick, the described warning of described compound permeability cell is managed 6 upper ends and is circulated, gas will be from the upper end output of described warning pipe 6, because the cross-sectional area of described warning pipe 6 is greater than the cross-sectional area of described tubule 3, therefore gas flow will increase sharply, its numerical value will be apparent on the described flowmeter 5, give the alarm to operating personnel with this, described alarm type air brick is changed in the timely blowing out of alert, to guarantee safety in production.
Because the lower end that present embodiment has two described tubules 3 is communicated with the compound permeability cell of formation by the pipe 6 of reporting to the police with described air chamber 2, even wherein a described warning pipe 6 is filled in cold steel, can also report to the police by another described warning pipe 6, can guarantee production safety.
Described warning pipe 6 is communicated with described air chamber 2, but needn't pass described air chamber 2, therefore need not tightly to weld in the described warning pipe 6 and the junction of described air chamber 2, simplified the making step of described alarm type air brick, its leak rate reduces greatly, has improved production efficiency, even if this junction leaks gas, the gas that spills also can enter described air brick body 1, can not have any impact to producing, and can fully guarantee production safety; And described warning pipe 6 need not special lengthening and makes it to pass through described air chamber 2, has saved part tubing, has saved production cost to a certain extent.
In other embodiments, can make the lower end of the described tubule 3 of, five or other numbers be communicated with the compound permeability cell of formation with described air chamber 2 according to producing needs by the pipe 6 of reporting to the police.
In other embodiments, the length of described warning pipe 6 can be greater than the minimum safe height of described alarm type air brick, as long as can play the purpose that the caution operating personnel in time change described alarm type air brick.
In other embodiments, can on described air inlet pipe 4, not be provided with flowmeter 5, and adopt the manual observation molten steel to seethe the mode of situation, judge whether the upper end of described warning pipe 6 is circulated, when the upper end of described warning pipe 6 is circulated, seething of molten steel will become violent, and should change described alarm type air brick this moment.
Obviously, the foregoing description only is for example clearly is described, and is not the qualification to embodiment.For those of ordinary skill in the field, can also make other changes in different forms on the basis of the above description.Here need not also can't give exhaustive to all embodiments.And conspicuous variation of being extended out thus or change still are among the protection domain of the utility model creation.

Claims (4)

1. alarm type air brick, comprise air brick body, be arranged on described air brick body bottom air chamber, be arranged on the tubule that described air brick body inside and lower end be communicated with described air chamber, the air inlet pipe that the upper end is communicated with described air chamber, it is characterized in that: the lower end of at least one described tubule is communicated with the compound permeability cell of formation by the pipe of reporting to the police with described air chamber, the length of described warning pipe is more than or equal to the minimum safe height of described alarm type air brick, and the cross-sectional area of described warning pipe is greater than the cross-sectional area of described tubule.
2. alarm type air brick according to claim 1 is characterized in that: described air inlet pipe is provided with flowmeter.
3. alarm type air brick according to claim 1 and 2 is characterized in that: the cross sectional shape of described warning pipe and described tubule is for circular.
4. alarm type air brick according to claim 1 and 2 is characterized in that: the lower end of at least two described tubules is communicated with the described compound permeability cell of formation by described warning pipe with described air chamber.
CNU2009201453499U 2009-03-19 2009-03-19 Alarming type air brick Expired - Fee Related CN201368673Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2009201453499U CN201368673Y (en) 2009-03-19 2009-03-19 Alarming type air brick

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2009201453499U CN201368673Y (en) 2009-03-19 2009-03-19 Alarming type air brick

Publications (1)

Publication Number Publication Date
CN201368673Y true CN201368673Y (en) 2009-12-23

Family

ID=41487564

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2009201453499U Expired - Fee Related CN201368673Y (en) 2009-03-19 2009-03-19 Alarming type air brick

Country Status (1)

Country Link
CN (1) CN201368673Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103114176A (en) * 2011-11-17 2013-05-22 洛阳利尔耐火材料有限公司 Sound-light alarm apparatus for preventing ladle bottom blowing air brick steel bleed-out
CN110578033A (en) * 2019-09-24 2019-12-17 张家港宏昌钢板有限公司 Converter bottom blowing replacement method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103114176A (en) * 2011-11-17 2013-05-22 洛阳利尔耐火材料有限公司 Sound-light alarm apparatus for preventing ladle bottom blowing air brick steel bleed-out
CN110578033A (en) * 2019-09-24 2019-12-17 张家港宏昌钢板有限公司 Converter bottom blowing replacement method
CN110578033B (en) * 2019-09-24 2021-11-23 张家港宏昌钢板有限公司 Converter bottom blowing replacement method

Similar Documents

Publication Publication Date Title
CN201368673Y (en) Alarming type air brick
CN110878915A (en) Converter bottom blowing pipeline state monitoring system
CN201535634U (en) Fining furnace bleed-out alarm device
CN106409474A (en) Converter transformer provided with glass tube type oil-level indicator and mounting method of indicator
CN201960123U (en) Air-permeable brick with safety warning function
CN101844224B (en) Hot repairing method for air brick of steel ladle
CN208562438U (en) Dust air supply device warning device for a kind of bottom
CN201495242U (en) Working lining of cinder spout
CN201368674Y (en) Compound magnesium carbon gas permeable brick for converter
CN210287398U (en) Safety device for high-level overflow water system of cooling water of gas cooler
CN206488630U (en) The streamlined air-cooled partition wall of heating furnace furnace roof
CN103398589A (en) Punching deslagging device of metallurgical furnace
CN201618848U (en) Steel ladle gas permeable brick capable of prewarning service life
CN203443359U (en) Metallurgical furnace punching and slag discharge device
CN201665687U (en) Blast furnace tuyere small sleeve state monitoring device
CN203442418U (en) Container and pipe orifice structure thereof
CN201166549Y (en) Device for measuring metallurgical furnace lining thickness
CN201495240U (en) Cinder spout
CN204997055U (en) Package in middle of continuous casting with online intelligent early warning function of molten bath thickness
CN203562265U (en) Oil conservator
CN216011728U (en) Flue gas furnace structure for preventing flue gas furnace shell from being overheated
CN1268456C (en) Warning device for preventing middle package from bleeding-out
CN103470917B (en) Container and nozzle structure thereof
CN205825720U (en) A kind of electric furnace water cooled furnace wall
CN210569984U (en) Refining furnace with furnace bottom protection and alarm device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20091223

Termination date: 20180319