CN201363486Y - Machine head of muddy water balanced pipe jacking machine with lengthened pipe - Google Patents
Machine head of muddy water balanced pipe jacking machine with lengthened pipe Download PDFInfo
- Publication number
- CN201363486Y CN201363486Y CNU2009201421784U CN200920142178U CN201363486Y CN 201363486 Y CN201363486 Y CN 201363486Y CN U2009201421784 U CNU2009201421784 U CN U2009201421784U CN 200920142178 U CN200920142178 U CN 200920142178U CN 201363486 Y CN201363486 Y CN 201363486Y
- Authority
- CN
- China
- Prior art keywords
- machine head
- pipe
- machine
- head
- lengthened
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model relates to a machine head of a muddy water balanced pipe jacking machine with a lengthened pipe, which comprises the machine head and is characterized in that a ring of connecting lugs are arranged on the inner wall at the end part of the machine head, one end of the lengthened pipe with the same diameter of the machine head is a connecting section, the diameter of the connecting section is smaller than the diameter of the lengthened pipe, a ring of connecting lugs are also arranged at the end part of the connecting section, a seal groove is arranged on the outer side surface of the connecting section, the connecting section of the lengthened pipe is inserted in the machine head, the connection is carried out by using bolts and nuts through the connecting lugs of the two, and a seal ring is simultaneously arranged in the seal groove. When the machine head of the muddy water balanced pipe jacking machine with the lengthened pipe is used, the length of the machine head is increased by connecting the lengthened pipe and the machine head of the pipe jacking machine, thereby greatly improving the stability of the balance of the whole machine head part in slurry clay and simultaneously strengthening the effects of adjustment and deviation correction manipulation control of the direction of the machine head during the jacking process in the slurry clay layer under the situation of shallow covered earth of the large caliber pipe jacking machine.
Description
Technical field
The utility model relates to a kind of mire water equilibrium tube machine head with extension pipe.
Background technique
In recent years, along with the introduction of external advanced pipe jacking equipment and the development success of home equipment, pipe jacking construction technique reaches its maturity, and also along with pressing for of accelerated development and environmental pollution improvement built in urbanization, pipe jacking construction technique is used more and more wider.Owing to aspect reasons such as production, transportation, structures, mire water equilibrium tube machine head length in design has narrow limitation, and head weight is very big, in the engineering of mud matter clay, the characteristics that the push pipe head is short and heavy cause easily plants head, causes and can't carry head, thereby influence engineering.
Summary of the invention
The purpose of this utility model just provides a kind of simple in structure, easy to operate, can avoid the mire water equilibrium tube machine head of the band extension pipe of front end dip generation.
The mire water equilibrium tube machine head of band extension pipe of the present utility model, comprise head, the inwall that is characterized in the head end is provided with a circle engaging lug, extension pipe one end isometrical with head is linkage section, and the diameter of linkage section is less than the extension pipe caliber, and the end of linkage section also is provided with a circle engaging lug, have seal groove on the outer side surface of linkage section, the linkage section of extension pipe inserts in the head, connects with bolt nut by both engaging lug, places seal ring simultaneously in seal groove.
When the mire water equilibrium tube machine head of band extension pipe of the present utility model uses, link to each other with the push pipe head by extension pipe, increased the length of head, can improve the stability of equilibrium of integral body in mud matter clay at head position greatly, strengthened simultaneously under the shallow earthing situation of heavy caliber pipe-jacking machine, the control effect is handled in the adjustment of jack-in process heading and correction in mud matter clay layer.
Description of drawings
Fig. 1 is the utility model structural representation.
Embodiment
A kind of mire water equilibrium tube machine head with extension pipe, comprise head 1, the inwall that is characterized in head 1 end is provided with a circle engaging lug 2, extension pipe 5 one ends isometrical with head 1 are linkage section 6, and the diameter of linkage section 6 is less than extension pipe 5 calibers, and the end of linkage section 6 also is provided with a circle engaging lug 3, have seal groove 4 on the outer side surface of linkage section 6, the linkage section 6 of extension pipe 5 is inserted in the head 1, and engaging lug 2 links to each other with engaging lug 3 usefulness bolt nuts, places elastic rubber sealing ring in seal groove 4.
Claims (2)
1, a kind of mire water equilibrium tube machine head with extension pipe, comprise head (1), it is characterized in that: the inwall of head (1) end is provided with a circle engaging lug (2), extension pipe (5) one ends isometrical with head (1) are linkage section (6), the diameter of linkage section (6) is less than extension pipe (5) caliber, the end of linkage section (6) also is provided with a circle engaging lug (3), have seal groove (4) on the outer side surface of linkage section (6), the linkage section (6) of extension pipe (5) is inserted in the head (1), and engaging lug (2) links to each other with bolt nut with engaging lug (3).
2, the mire water equilibrium tube machine head of band extension pipe according to claim 1 is characterized in that: place seal ring in the seal groove (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2009201421784U CN201363486Y (en) | 2009-03-30 | 2009-03-30 | Machine head of muddy water balanced pipe jacking machine with lengthened pipe |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2009201421784U CN201363486Y (en) | 2009-03-30 | 2009-03-30 | Machine head of muddy water balanced pipe jacking machine with lengthened pipe |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201363486Y true CN201363486Y (en) | 2009-12-16 |
Family
ID=41474151
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2009201421784U Expired - Fee Related CN201363486Y (en) | 2009-03-30 | 2009-03-30 | Machine head of muddy water balanced pipe jacking machine with lengthened pipe |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201363486Y (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104154326A (en) * | 2014-08-14 | 2014-11-19 | 中石化第十建设有限公司 | Rigid sleeve head for desert and silt geology jacking pipe and jacking pipe construction method thereof |
CN105570532A (en) * | 2015-12-10 | 2016-05-11 | 中国十七冶集团有限公司 | Deviation rectification construction method for jacking pipe displacement deviation |
CN108662281A (en) * | 2018-05-31 | 2018-10-16 | 成都金玉雄辉建筑工程有限公司 | Conduit jacking and pipe jacking construction method |
-
2009
- 2009-03-30 CN CNU2009201421784U patent/CN201363486Y/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104154326A (en) * | 2014-08-14 | 2014-11-19 | 中石化第十建设有限公司 | Rigid sleeve head for desert and silt geology jacking pipe and jacking pipe construction method thereof |
CN105570532A (en) * | 2015-12-10 | 2016-05-11 | 中国十七冶集团有限公司 | Deviation rectification construction method for jacking pipe displacement deviation |
CN108662281A (en) * | 2018-05-31 | 2018-10-16 | 成都金玉雄辉建筑工程有限公司 | Conduit jacking and pipe jacking construction method |
CN108662281B (en) * | 2018-05-31 | 2020-07-07 | 成都金玉雄辉建筑工程有限公司 | Pipe jacking device and pipe jacking construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103953807B (en) | For the bell and spigot frame of fastener for connection | |
CN102877862A (en) | Confined concrete quantitative yielding lagging jack based on mine U-shaped steel | |
CN201363486Y (en) | Machine head of muddy water balanced pipe jacking machine with lengthened pipe | |
CN202882942U (en) | Confined concrete quantifying yielding arch centering based on mining U-shaped steels | |
CN202969271U (en) | Pin-connected rope clip | |
CN202017818U (en) | Nose with lengthened pipe of slurry-water balance pipe jacking machine | |
CN207727605U (en) | A kind of new steel structure wall column feet connecting structure | |
CN202266753U (en) | Device for quickly connecting jacking pipe joints | |
CN204852606U (en) | Curve push pipe tube coupling bell and spigot connection form | |
CN202056417U (en) | Anti-skip anchor ear | |
CN202546006U (en) | High pressure-resistant sealing device used for intermediate jacking station of pipe jacking equipment | |
CN202831759U (en) | Air inflation steel tube constructional element | |
CN202544789U (en) | While-drilling jar | |
CN205226716U (en) | Flange bolt connects tee bend of single entry telescopic joint | |
CN204125957U (en) | Flange transition interconnection system single-pile foundation structure | |
CN203701086U (en) | PHC tubular pile and steel pipe butt-joint structure | |
CN205063960U (en) | Compound tube coupling structure of rectangle push pipe | |
CN202469300U (en) | Connection structure between two grout pipes | |
CN206016810U (en) | A kind of novel shield balance originating and reception sleeve arrangement | |
CN203973133U (en) | A kind of ruggedized construction of penstock docking point | |
CN103912286B (en) | Prevent the method that multiple tube strip terminal plate deforms | |
CN206346186U (en) | Underground heat concrete-pile | |
CN204477592U (en) | A kind of cast iron tube repair piece | |
CN219431861U (en) | Anchor rod with connector structure | |
CN202055864U (en) | Swinging pipe clamp for wall hanging of digging and stacking pipeline of coal mine shaft |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20091216 Termination date: 20130330 |