CN201354483Y - Connecting clamper of industrial factory building pillar and roofing beam - Google Patents

Connecting clamper of industrial factory building pillar and roofing beam Download PDF

Info

Publication number
CN201354483Y
CN201354483Y CNU2008201575078U CN200820157507U CN201354483Y CN 201354483 Y CN201354483 Y CN 201354483Y CN U2008201575078 U CNU2008201575078 U CN U2008201575078U CN 200820157507 U CN200820157507 U CN 200820157507U CN 201354483 Y CN201354483 Y CN 201354483Y
Authority
CN
China
Prior art keywords
factory building
roof girder
industrial factory
junction plate
roofing beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008201575078U
Other languages
Chinese (zh)
Inventor
史册
李金胜
刘忠臣
姜利军
吴存义
周红萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
CHINA MCC20 CONSTRUCTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHINA MCC20 CONSTRUCTION Co Ltd filed Critical CHINA MCC20 CONSTRUCTION Co Ltd
Priority to CNU2008201575078U priority Critical patent/CN201354483Y/en
Application granted granted Critical
Publication of CN201354483Y publication Critical patent/CN201354483Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a steel structure industrial factory building, in particular to a connecting device of an industrial factory building pillar and a roofing beam. A connecting clamper of an industrial factory building pillar and a roofing beam is connected with a connecting plate arranged between the industrial factory building and the roofing beam; the connecting plate is provided with a plurality of connecting screw holes, and is connected with the industrial factory building and the roofing beam by a bolt connecting pair. The clamper is welded on the connecting position of the connecting plate and the roofing beam. The utility model resolves the manual handling problems of the installation of the connecting plate construction, thus preventing hoisting deformation and unhooking problem, and decreasing the time occupied by the crane.

Description

The industrial premises post is connected jig with roof girder
Technical field
The utility model relates to the steel work industrial premises, relates in particular to the linkage of industrial premises post and roof girder.
Background technology
The industrial premises steel column generally adopts hybrid juction with the design that is connected of roof girder, and promptly the web high-strength bolt connects, the frange plate field Welding.Usually with crane roof girder is sling behind the steel column installation in position,, connected with bolt then with manually junction plate being moved into place.Because the specification of its junction plate of increase of factory building span also increases thereupon, Artificial Control junction plate difficulty strengthens, and potential safety hazard increases, and the installation progress is restricted, and the crane holding time is long, and potential safety hazard is big.
Summary of the invention
The utility model is intended to solve the problems referred to above of background technology, provides a kind of industrial premises post to be connected jig with roof girder.The a dead lift problem of the solution installation junction plate of the utility model success is avoided the lifting distortion, is broken off relations, and reduces the crane holding time.
The utility model is achieved in that a kind of industrial premises post is connected jig with roof girder, it is connected in the junction plate between factory building columns and the roof girder, described junction plate plate body is provided with a plurality of connection screws and utilizes the bolt pair to be connected with roof girder with factory building columns, and described jig is welded on described junction plate and roof girder junction.
Described industrial premises post and roof girder linkage, described jig comprises a rotating shaft and two sleeve pipes, near being provided with and being welded on respectively on junction plate or the roof girder, two sleeve pipes are passed in described rotating shaft to described two sleeve pipes successively up and down, and two ends are weldingly fixed on roof girder or the factory building columns.
The utility model has utilized, and the junction plate and the roof girder of steel column and roof girder is connected together in factory with the device of similar two hinges, by the part sleeve pipe cylinder is rotated.After crane is in place with roof girder, manually the junction plate rotation is ridden between steel column and the roof girder, carry out bolt then and connect.The a dead lift problem of successful solution installation junction plate is avoided the lifting distortion, is broken off relations, and reduces the crane holding time.
Description of drawings
Below, the utility model is done further specifying in conjunction with the accompanying drawings:
Fig. 1 is a schematic diagram of the present utility model.
Fig. 2 is the partial enlarged drawing of A portion in the middle of Fig. 1.
The specific embodiment
As shown in Figure 1, a kind of industrial premises post is connected jig with roof girder, it comprises the junction plate 3 that is connected between factory building columns 1 and the roof girder 2, described junction plate 3 plate bodys are provided with a plurality of connection screws and utilize the bolt auxiliary connection to be connected with roof girder 2 with factory building columns 1, and described jig 4 is welded on described junction plate 1 and roof girder 2 junctions can swung roof girder in facade plane in the middle of the installation process.
Described industrial premises post and roof girder linkage, described jig 4 comprises a rotating shaft 41 and two sleeve pipes 42, described two sleeve pipes about in the of 42 near being provided with and being welded on respectively on junction plate 1 or the roof girder 2, two sleeve pipes 42 are passed in described rotating shaft 41 successively, and two ends are weldingly fixed on the roof girder 2.Also can be welded on the factory building columns 1.

Claims (2)

1. an industrial premises post is connected jig with roof girder, it comprises the junction plate that is connected between factory building columns and the roof girder, it is characterized in that, described junction plate plate body is provided with a plurality of connection screws and utilizes the bolt auxiliary connection to be connected with roof girder with factory building columns, and described jig is welded on described junction plate and roof girder junction.
2. industrial premises post according to claim 1 and roof girder linkage, it is characterized in that, described jig comprises a rotating shaft and two sleeve pipes, described two sleeve pipes are up and down near being provided with and being welded on respectively on junction plate or the roof girder, two sleeve pipes are passed in described rotating shaft successively, and two ends are weldingly fixed on roof girder or the factory building columns.
CNU2008201575078U 2008-12-19 2008-12-19 Connecting clamper of industrial factory building pillar and roofing beam Expired - Fee Related CN201354483Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008201575078U CN201354483Y (en) 2008-12-19 2008-12-19 Connecting clamper of industrial factory building pillar and roofing beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008201575078U CN201354483Y (en) 2008-12-19 2008-12-19 Connecting clamper of industrial factory building pillar and roofing beam

Publications (1)

Publication Number Publication Date
CN201354483Y true CN201354483Y (en) 2009-12-02

Family

ID=41410823

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008201575078U Expired - Fee Related CN201354483Y (en) 2008-12-19 2008-12-19 Connecting clamper of industrial factory building pillar and roofing beam

Country Status (1)

Country Link
CN (1) CN201354483Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104325230A (en) * 2014-10-14 2015-02-04 中国十七冶集团有限公司 Abutting welding method for box columns of large-scale factory building
CN112663498A (en) * 2020-11-19 2021-04-16 中铁二局集团有限公司 Quick installation and closure construction method for splicing plates of steel beam bolting closure section

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104325230A (en) * 2014-10-14 2015-02-04 中国十七冶集团有限公司 Abutting welding method for box columns of large-scale factory building
CN112663498A (en) * 2020-11-19 2021-04-16 中铁二局集团有限公司 Quick installation and closure construction method for splicing plates of steel beam bolting closure section
CN112663498B (en) * 2020-11-19 2022-05-17 中铁二局集团有限公司 Quick installation and closure construction method for splicing plates of steel beam bolting closure section

Similar Documents

Publication Publication Date Title
CN105484514A (en) Method for strengthening circular reinforced concrete pier column
CN205772984U (en) A kind of hanging apparatus of monolithic steel truss
CN207268073U (en) Novel flexible formwork bearing frame
CN201354483Y (en) Connecting clamper of industrial factory building pillar and roofing beam
CN204676881U (en) Large span intersection truss steel structure supporting system
CN207618963U (en) It is a kind of using fork truck at the top of basement pipe laying device
CN2878313Y (en) Material hoister
CN205153145U (en) Adopt precast concrete coincide floor of bolt and connection structure of H shaped steel roof beam
CN210508440U (en) Turnover lifting device for single-piece large-span steel truss
CN110439297B (en) Turnover lifting device for single-piece large-span steel truss and construction method thereof
CN201598093U (en) Hoisting fixture for large-sized sectional box-type beam
CN103112766A (en) Construction elevator suspending over basement roof of building and construction method thereof
CN215289748U (en) T roof beam transverse connection board seam construction equipment
CN105819352B (en) Lifting device for detachable door type mast building and construction method thereof
CN212101659U (en) Clamping device for hoisting reinforcement cage
CN103899026A (en) Truss system used for cold-formed thin-walled steel structure
CN105569368A (en) Annular steel plate strengthening device for reinforced concrete column with circular cross section
CN202379616U (en) Movable simple hoisting device
CN220267258U (en) Steel construction engineering construction counterpoint device
CN201151954Y (en) Steel column and concrete column connection structure
CN202170644U (en) Compactor for attaching profiled steel sheet with surface of steel beam
CN206289836U (en) Steel-structure roof slope becomes angle connecting device and applies its steel-structure roof
CN212954041U (en) Glass net rack lifting device
CN218776007U (en) Steel structure welding device
CN212428120U (en) Portable construction steel bar support device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA MCC20 GROUP CO., LTD.

Free format text: FORMER NAME: CHINA 20TH METALLURGICAL CONSTRUCTION CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 201900 Shanghai city Baoshan District Pangu Road No. 777

Patentee after: China Twenty Metallurgical Group Co., Ltd.

Address before: 201900 Shanghai city Baoshan District Pangu Road No. 777

Patentee before: China MCC20 Construction Co., Ltd.

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20091202

Termination date: 20131219