CN201351169Y CNU2008202305964U CN200820230596U CN201351169Y CN 201351169 Y CN201351169 Y CN 201351169Y CN U2008202305964 U CNU2008202305964 U CN U2008202305964U CN 200820230596 U CN200820230596 U CN 200820230596U CN 201351169 Y CN201351169 Y CN 201351169Y
Authority
CN
China
Prior art keywords
lance
spray gun
vaporizing chamber
outlet
molten iron
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008202305964U
Other languages
Chinese (zh)
Inventor
张腾芳
倪红卫
姜作玺
张华�
臧维林
刘吉刚
李修京
吴慧玲
郭可宝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
QINGDAO STEEL GROUP HUAKANG INDUSTRY Co
Wuhan University of Science and Engineering WUSE
Original Assignee
QINGDAO STEEL GROUP HUAKANG INDUSTRY Co
Wuhan University of Science and Engineering WUSE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by QINGDAO STEEL GROUP HUAKANG INDUSTRY Co, Wuhan University of Science and Engineering WUSE filed Critical QINGDAO STEEL GROUP HUAKANG INDUSTRY Co
Priority to CNU2008202305964U priority Critical patent/CN201351169Y/en
Application granted granted Critical
Publication of CN201351169Y publication Critical patent/CN201351169Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Refinement Of Pig-Iron, Manufacture Of Cast Iron, And Steel Manufacture Other Than In Revolving Furnaces (AREA)

Abstract

The utility model relates to a hot metal pretreatment desulphurization lance. The technical scheme utilized includes that a lance body (1) is fixedly connected with a framework (3), a refractory material outer lining (2) is poured on the outer wall of the lance body (1), the framework (3) is embedded in the refractory material outer lining (2), a delivery pipe (4) is arranged in the lance body (1), the top end of a vaporizing chamber (5) is communicated with the tail end of the delivery pipe (4), the vaporizing chamber (5) is in a combined shape of a frustum and a cylinder or a cylinder shape, the tail end of the vaporizing chamber (5) is provided with a lance lower outlet, and lateral walls thereof are provided with 2-12 lance side outlets (6). The minimum included angle which is formed between the center line of each lance side outlet (6) and the isohypsic surface ranges from 0 degree to 60 degrees, and each lance side outlet (6) can be a circular hole, an elliptic hole, a flaring hole or a square hole. The hot metal pretreatment desulphurization lance has the advantages of reasonable structure, high desulfurizer utilization rate and high desulphurization efficiency. As air escapes from the hot metal uniformly with continuous bubbles, the lance is stable in injection process with small liquid level fluctuation and small spatter and has low small influence on production environments.

Description

A kind of desulfurizing spray gun for pretreating molten iron
Technical field
The utility model belongs to the hot metal pretreatment technical field.Be specifically related to a kind of desulfurizing spray gun for pretreating molten iron.
Technical background
At present, most of magnesia mixture desulphurization spray guns are for having tubaeform vaporizing chamber structure spray gun, though this spray gun is simple in structure, but because outlet is single plane, in case when vibration takes place or tilts in spray gun, gas will enter molten iron with the air pocket form along a side of exit face in the vaporizing chamber, can produce five aspect disadvantageous effects like this:
1, air pocket is overflowed and can be vibrated by the aggravation spray gun by a side in the winding-up process, and the aggravation bubble is overflowed inhomogeneous;
2, enter molten iron because gas is discontinuous with the air pocket form, bubble is big, and its floating interval of floating dock in molten iron is short.Because the floating-upward process of bubble in molten iron is the process of reaction of Salmon-Saxl in a bubble surface magnesium vapor diffusion dissolving and surperficial magnesium steam and the molten iron, the bubble floating time is short, will directly cause the MAGNESIUM METAL utilization ratio low;
3, studies show that (G.A.Irons.etc.The Kinetics of Molten Iron Desulfurization Using MagnesiumVapor.METALLURGICAL TRANSACTIONS:VOL 12B, DEC 1981): in the single magnesium-blowing agent sweetening process, magnesium steam is 1: 9 by dissolved magnesium desulfurization ratio in surperficial direct reaction desulfurization and the molten iron in the bubble, magnesium steam meltage is few, and the process desulfuration efficiency that will directly cause jetting is low;
4, bubble is discontinuous in the winding-up process overflows unevenly, reduce the stirring action of gas greatly, can cause in the hot metal ladle and to flow inhomogeneously that (Mg, S) is slow at local rate of mass transfer for reactant molten iron, the desulfurization rate that influence is whole is unfavorable for that also the temperature in the hot metal ladle is even;
5, a large amount of unemployed magnesium steam in molten iron surface combustion even blast, cause a large amount of splashes of molten iron with bubble effusion iron liquid, increase iron loss, produce volume of smoke simultaneously, cause production on-site environment to worsen, and also are unfavorable for other production operations.
Summary of the invention
The utility model is intended to overcome above-mentioned technological deficiency, and purpose provides a kind of rational in infrastructure, winding-up process stabilization, sorbent utilization height, desulfuration efficiency height, to the little desulfurizing spray gun for pretreating molten iron of production environment influence.
For achieving the above object, the technical solution adopted in the utility model is: gun body connects with skeletal fixation, and the outer wall of gun body is cast with the refractory materials outer lining, and skeleton is embedded in the refractory materials outer lining, transport pipe places in the gun body, and the top of vaporizing chamber communicates with the end of transport pipe; The combined shaped that is shaped as round platform and cylinder of vaporizing chamber or cylindric, the end of vaporizing chamber are the spray gun lower part outlet, and the sidewall of vaporizing chamber is provided with 2~12 spray gun sidepiece outlets.
Described spray gun sidepiece outlet or be circular port or for slotted eye or for flared hole or be square opening; Spray gun sidepiece outlet is uniformly distributed in the contour of top, vaporizing chamber lower surface or equal-height position not, and the medullary ray of spray gun sidepiece outlet and the minimum angle of contour plane are 0~60 °.
Because adopt technique scheme, the utility model has vaporizing chamber at the transport pipe end, outlet is divided into lower part outlet and sidepiece outlet, and gas can be overflowed by lower part outlet and sidepiece outlet simultaneously in the vaporizing chamber, and is rational in infrastructure; Gas is overflowed with continuous small bubbles form in the sidepiece outlet, reduced the pressure of lower part outlet, the lower gas escaped quantity is few, the effusion bubble volume is little, the bubble floating time is long, specific surface area is big, help the dissolving of magnesium steam in molten iron, help improving sorbent utilization and blowing desulfurization efficient.
Therefore, the utlity model has characteristics rational in infrastructure, that sorbent utilization is high and desulfuration efficiency is high; Gas is overflowed in molten iron evenly, and bubble is continuous, and is so spray gun is stable in the winding-up process, liquid fluctuating is little and spraying state is few, little to the production environment influence.
Description of drawings
Fig. 1 is a kind of structural representation of the present utility model;
Fig. 2 is an another kind of structural representation of the present utility model;
Fig. 3 is another structural representation of the present utility model.
Embodiment
The utility model is described in further detail below in conjunction with the drawings and specific embodiments, is not the restriction to the utility model protection domain:
Embodiment 1
A kind of desulfurizing spray gun for pretreating molten iron, as shown in Figure 1: gun body 1 is fixedly connected with skeleton 3, and the outer wall of gun body 1 is cast with refractory materials outer lining 2, and skeleton 3 is embedded in the refractory materials outer lining 2, transport pipe 4 places in the gun body 1, and the top of vaporizing chamber 5 communicates with the end of transport pipe 4; The combined shaped that is shaped as round platform and cylinder of vaporizing chamber 5, the end of vaporizing chamber 5 are the spray gun lower part outlet, and the sidewall of vaporizing chamber 5 is provided with 4~6 spray gun sidepiece outlets 6.
Described spray gun sidepiece outlet 6 is a circular port, and spray gun sidepiece outlet 6 is uniformly distributed in the equal-height position on top, vaporizing chamber 5 lower surface, and the medullary ray of spray gun sidepiece outlet 6 and the minimum angle of contour plane are 30 °~60 °.
Embodiment 2
A kind of desulfurizing spray gun for pretreating molten iron, as shown in Figure 2: being shaped as of vaporizing chamber 5 is cylindric, and the end of vaporizing chamber 5 is the spray gun lower part outlet, and the sidewall of vaporizing chamber 5 is provided with 6~12 spray gun sidepiece outlets 6.Spray gun sidepiece outlet 6 is a flared hole, and spray gun sidepiece outlet 6 is uniformly distributed in the not equal-height position on top, vaporizing chamber 5 lower surface, and the medullary ray of spray gun sidepiece outlet 6 and the minimum angle of contour plane are 30 °~60 °.
All the other are with embodiment 1.
Embodiment 3
A kind of desulfurizing spray gun for pretreating molten iron, as shown in Figure 3: the spray gun sidepiece exports 6 up, and the minimum angle of its medullary ray and contour plane also is 30 °~60 °.
All the other are with embodiment 2.
Embodiment 4
A kind of desulfurizing spray gun for pretreating molten iron, the sidewall of vaporizing chamber 5 are provided with 2~4 spray gun sidepiece outlets 6, and spray gun sidepiece outlet 6 is a slotted eye; Spray gun sidepiece outlet 6 is uniformly distributed in the equal-height position on top, vaporizing chamber 5 lower surface, and the medullary ray of spray gun sidepiece outlet 6 and the minimum angle of contour plane are 0~30 °.
All the other are with embodiment 1.
Embodiment 5
A kind of desulfurizing spray gun for pretreating molten iron, the sidewall of vaporizing chamber 5 are provided with 4~8 spray gun sidepiece outlets 6, and spray gun sidepiece outlet 6 is a square opening; Spray gun sidepiece outlet 6 is uniformly distributed in the not equal-height position on top, vaporizing chamber 5 lower surface, and the medullary ray of spray gun sidepiece outlet 6 and the minimum angle of contour plane are 0~30 °.
All the other are with embodiment 1.
This embodiment has vaporizing chamber 5 at transport pipe 4 ends, and outlet is divided into lower part outlet and sidepiece outlet, and gas can be overflowed by lower part outlet and sidepiece outlet 6 simultaneously in the vaporizing chamber 5, and is rational in infrastructure; Gas exports 6 with continuous small bubbles form effusion at sidepiece, reduced the pressure of lower part outlet, bottom gas evolution amount reduces, the effusion bubble volume is little, the bubble floating time is long, specific surface area is big, help the dissolving of magnesium steam in molten iron, help improving sorbent utilization and blowing desulfurization efficient.
Therefore, the utlity model has characteristics rational in infrastructure, that sorbent utilization is high and desulfuration efficiency is high; Gas is in molten iron Overflow evenly, bubble is continuous, so spray gun is stable in the winding-up process, liquid fluctuating is little and spraying state is few, to the production environment shadow Ring little.

Claims (3)

1, a kind of desulfurizing spray gun for pretreating molten iron, it is characterized in that gun body [1] and skeleton [3] are fixedly connected, the outer wall of gun body [1] is cast with refractory materials outer lining [2], skeleton [3] is embedded in the refractory materials outer lining [2], transport pipe [4] places in the gun body [1], and the top of vaporizing chamber [5] communicates with the end of transport pipe [4]; The combined shaped that is shaped as round platform and cylinder of vaporizing chamber [5] or cylindric, the end of vaporizing chamber [5] is the spray gun lower part outlet, the sidewall of vaporizing chamber [5] is provided with 2~12 spray gun sidepiece outlets [6].
2, desulfurizing spray gun for pretreating molten iron according to claim 1, it is characterized in that described spray gun sidepiece outlet [6] is uniformly distributed in the contour of vaporizing chamber [5] top, lower surface or equal-height position not, the medullary ray of spray gun sidepiece outlet [6] and the minimum angle of contour plane are 0~60 °.
3, desulfurizing spray gun for pretreating molten iron according to claim 1 and 2 is characterized in that described spray gun sidepiece outlet [6] or for circular port or for slotted eye or for flared hole or be square opening.
CNU2008202305964U 2008-12-25 2008-12-25 Hot metal pretreatment desulphurization lance Expired - Fee Related CN201351169Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008202305964U CN201351169Y (en) 2008-12-25 2008-12-25 Hot metal pretreatment desulphurization lance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008202305964U CN201351169Y (en) 2008-12-25 2008-12-25 Hot metal pretreatment desulphurization lance

Publications (1)

Publication Number Publication Date
CN201351169Y true CN201351169Y (en) 2009-11-25

Family

ID=41374555

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008202305964U Expired - Fee Related CN201351169Y (en) 2008-12-25 2008-12-25 Hot metal pretreatment desulphurization lance

Country Status (1)

Country Link
CN (1) CN201351169Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103642984A (en) * 2013-12-24 2014-03-19 辽宁新邦科技有限公司 Cyclonic side-escaping type desulphurization spraying gun
CN103667596A (en) * 2013-12-24 2014-03-26 辽宁新邦科技有限公司 High-thermal-shock-resistant desulfurization device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103642984A (en) * 2013-12-24 2014-03-19 辽宁新邦科技有限公司 Cyclonic side-escaping type desulphurization spraying gun
CN103667596A (en) * 2013-12-24 2014-03-26 辽宁新邦科技有限公司 High-thermal-shock-resistant desulfurization device

Similar Documents

Publication Publication Date Title
CN104388624B (en) Direct injection molten iron desulphurization spray gun
CN201351169Y (en) Hot metal pretreatment desulphurization lance
CN107513598B (en) A kind of molten iron tank deck bottom composite blowing sulfur method
CN104561452B (en) Dust the device and method of single mouth vacuum deaeration refining molten steel at a kind of end
CN109777920A (en) A kind of converter tapping injection refining sulfur method and device
CN101445860A (en) Magnesia mixture desulphurization spray gun for molten iron pretreatment
CN102424879A (en) Double-nozzle outlet rotary desulfurization spray gun
CN104711395B (en) High-performance spray gun for molten iron injection pretreatment
CN208238529U (en) metallurgical furnace
CN204111801U (en) Molten iron external refining pretreatment desulfurizing spray magnesium rifle
CN202808862U (en) Desulfuration spray gun
CN202380011U (en) Double-nozzle rotary desulfurization spray gun
CN103114174B (en) Blowing desulfurization method for molten iron of torpedo ladle
CN109112247A (en) Composite blowing iron melt desulfurizing agent and its sulfur removal technology
CN213142149U (en) Device for improving absorption rate of blowing granular nodulizer
CN104894325A (en) Compound jetting and step-by-step jetting desulfurization spray gun for molten iron mixed jetting or online mixing
CN102181608A (en) Molten iron desulfuration slag spray modification process
CN202380012U (en) Swing type molten iron predesulfuration lance
CN2873792Y (en) External pretreating jet gun for molten iron furnace
CN201459176U (en) Nodulized powder spray gun
CN202380014U (en) Molten iron desulfurization and agitation spraying gun
CN202390470U (en) Rotary spraying gun for desulfurizing liquid iron by spiral blade
CN102978326A (en) Free style molten iron desulfurization spray gun
CN111690865A (en) Device and method for improving absorption rate of blown granular nodulizer
CN206529492U (en) Porous side-spraying type desulfuration spray gun

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20091125

Termination date: 20101225