CN201350686Y CNU2008202358317U CN200820235831U CN201350686Y CN 201350686 Y CN201350686 Y CN 201350686Y CN U2008202358317 U CNU2008202358317 U CN U2008202358317U CN 200820235831 U CN200820235831 U CN 200820235831U CN 201350686 Y CN201350686 Y CN 201350686Y
Authority
CN
China
Prior art keywords
wind
guider
switch board
steel band
getting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2008202358317U
Other languages
Chinese (zh)
Inventor
郑能欢
董勉励
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huahan Pipe S & T Co Ltd
Original Assignee
Huahan Pipe S & T Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huahan Pipe S & T Co Ltd filed Critical Huahan Pipe S & T Co Ltd
Priority to CNU2008202358317U priority Critical patent/CN201350686Y/en
Application granted granted Critical
Publication of CN201350686Y publication Critical patent/CN201350686Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Extrusion Moulding Of Plastics Or The Like (AREA)

Abstract

The utility model relates to a winding pipe manufacturing device, which comprises a strip supplying portion, a pipe manufacturing portion, a control cabinet and a movable bottom frame, wherein the strip supplying portion and the pipe manufacturing portion are mutually engaged, and the control cabinet and the movable bottom frame are electrically connected with the strip supplying portion and a driving mechanism of the pipe manufacturing portion. Further, the pipe manufacturing portion includes a feeding device, a winding device, a pipe cutting device and a supporting frame which are arranged on the movable bottom frame, the winding device, the pipe cutting device and the supporting frame are arranged and engaged sequentially, and the feeding device and the winding device are fittingly disposed to realize tangential feeding. The winding pipe manufacturing device can be transported to pipe using sites to manufacture pipes, thereby saving pipe transporting link and pipe transporting costs. Besides, the winding pipe manufacturing device with flexible structure is capable of manufacturing the pipes by adopting composite strips as raw materials and also including complete strip manufacturing and pipe manufacturing portions. Additionally, the winding pipe manufacturing device employing steel strips and plastic granules to manufacture the pipes can meet requirements of manufacturing winding pipes of various calibers.

Description

A kind of winding-pipe production device
Technical field
The utility model relates to a kind of tubing process units, more particularly, relates to a kind of winding-pipe production device.
Background technology
Steel plastic composite wound pipe has found broad application with its good body intensity, rigidity height, performance such as in light weight, and winding pipe production has also realized pipelining.Be arranged on the winding pipe typical production line in the workshop as shown in Figure 1, comprise band production and tubing production two parts.Band production department divides and comprises that steel band feeding device 10 is after coalignment 4 alignments, entering the molten plastic of clamp-oning with extruding machine 6 in the composite die 104 carries out compound, carry out cooling and shaping then on typing platform 13, the band that 12 pairs of productions of Work-feeding means are set in the place ahead of typing platform 13 draws.Tubing production department divides and comprises spiral wind 3, bracing frame 1A, cutting machine 2 and the bracing frame 1 that is disposed in order successively.The composite band of band production part producing is by tangentially entering spiral wind 3, is supported on the bracing frame 1A, 1 through the winding pipe 110 of helically-wound shaped formation, and cutting machine 2 is according to the cut lengths cutting winding pipe 110 of pipe material product.
In the workshop of reality is arranged,, also formed the pipe production line of arranging as shown in Figure 2: the composite strip of band production part producing is wrapped on the composite strip support 100, partly carries out feed to tubing production in order to adapt to the extreme terrain in place, workshop.In order to reduce horizontal floor space, guider 5 is set, realize that composite strip is along tubing production segment axis direction layout.
There is following defective in above-mentioned existing winding tube production line: because production line is arranged in the factory floor, tubing is after factory's manufacturing finishes, and is bulky, causes tubing high from the cost of transportation that manufacturing works are transported to the job site of using tubing, particularly the bassoon diameter pipes is especially true.
For a long time, in the winding pipe manufacturing and use field, though exist the high defective of winding pipe tubing cost of transportation, up to now, the effective way that addresses this problem does not appear as yet.
The utility model content
The technical problems to be solved in the utility model is, a kind of winding-pipe production device is provided, and is implemented in winding pipe and uses the on-the-spot winding pipe of making, and solves the high defective of winding pipe cost of transportation.
The technical scheme that its technical problem that solves the utility model adopts is: construct a kind of winding-pipe production device, comprise the band supply section and the tubing production part that cooperatively interact, the switch board that is electrically connected with this band supply section and tubing production part driving mechanism, this tubing production department divides and comprises feed arrangement, wind, tubing cutter sweep and bracing frame, it is characterized in that, described winding-pipe production device also comprises removable underframe, described feed arrangement, wind, tubing cutter sweep and bracing frame are arranged on the described removable underframe, described wind, tubing cutter sweep and bracing frame are equipped with in proper order, and described feed arrangement and described wind are equipped with the realization tangential admission.
In winding-pipe production device of the present utility model, described feed arrangement, wind, tubing cutter sweep and bracing frame are arranged on the same described removable underframe; Or described feed arrangement, wind, tubing cutter sweep and bracing frame are arranged on the different described removable underframe, different described removable underframe can cooperatively interact, and realize that described wind, tubing cutter sweep and bracing frame cooperate production and described feed arrangement to cooperate with described wind in proper order and realize tangential admission.
In winding-pipe production device of the present utility model, described band supply section comprises the removable composite strip support of the independence that cooperates with described feed arrangement, and described feed arrangement is a Work-feeding means; Described switch board feeder ear is electrically connected with the driving mechanism of described Work-feeding means, wind and tubing cutter sweep, described switch board, Work-feeding means, wind and tubing cutter sweep are arranged on the same described removable underframe, and support frame as described above is arranged on another described removable underframe.
In winding-pipe production device of the present utility model, described band supply section comprises the composite strip support and the guider that matches with it, the contiguous described feed arrangement of the discharge end of this guider, its turnover band direction are along described tubing production axis direction setting partly, and described switch board feeder ear is electrically connected with the driving mechanism of described guider, feed arrangement, wind and tubing cutter sweep; Described feed arrangement is a Work-feeding means, and described switch board, guider, Work-feeding means, wind and tubing cutter sweep are arranged on the same described removable underframe, and support frame as described above is arranged on another described removable underframe.
In winding-pipe production device of the present utility model, described band supply section comprises the steel band section of getting the raw materials ready, guider, soldering and sealing plastic extruder and the garment bag support that cooperates with described feed arrangement, and described feed arrangement is smooth described steel band and is the coalignment of one with steel band and garment bag are chimeric; The contiguous described coalignment of the discharge end of this guider, its turnover band direction are along described tubing production axis direction setting partly, and described switch board feeder ear is electrically connected with the driving mechanism of described guider, feed arrangement, wind, tubing cutter sweep and the steel band section of getting the raw materials ready; The described steel band section of getting the raw materials ready comprises successively the steel band feeding device arranged, cuts welder and storage belting, and discharge end of this storage belting is adjacent with the feed end of this guider; Described soldering and sealing plastic extruder extruding end cooperates layout with described wind; The described steel band section of getting the raw materials ready, switch board, guider, coalignment, wind, soldering and sealing plastic extruder and tubing cutter sweep are arranged on the same described removable underframe, and support frame as described above is arranged on another described removable underframe.
In winding-pipe production device of the present utility model, described switch board comprises first switch board and second switch board, described removable underframe comprises first, second, third removable underframe, described band supply section comprises that the steel band section of getting the raw materials ready, the steel that are arranged on this first removable underframe mould composite log, and described first switch board is arranged on this first removable underframe, its feeder ear is electrically connected with the driving mechanism that the described steel band section of getting the raw materials ready, steel are moulded composite log; The described steel band section of getting the raw materials ready comprises successively the steel band feeding device arranged, cuts welder, storage belting and coalignment, this steel is moulded composite log and is comprised plastics extrusion device, steel-plastic composite mould, typing platform, this plastics extrusion device and this typing platform are arranged in juxtaposition, and this steel-plastic composite mould is positioned at this typing platform feed end and contiguous described coalignment discharge end; Described feed arrangement is a Work-feeding means, and this Work-feeding means is positioned at described typing platform discharge end and is arranged on the described first removable underframe; Described second switch board and described wind and tubing cutter sweep are arranged on the described second removable underframe, and support frame as described above is arranged on the described the 3rd removable underframe.
In winding-pipe production device of the present utility model, described switch board comprises first switch board and second switch board, described removable underframe comprises first, second, third removable underframe, described band supply section comprises the steel band section of getting the raw materials ready, guider, soldering and sealing plastic extruder and the garment bag section of getting the raw materials ready that cooperates with described feed arrangement, and described feed arrangement is smooth steel band and is the coalignment of one with steel band and garment bag are chimeric; The contiguous described feed arrangement of the discharge end of described guider, its turnover band direction are along described tubing production axis direction setting partly, and the described second switch board feeder ear is electrically connected with the driving mechanism of described guider, coalignment, wind, tubing cutter sweep and the steel band section of getting the raw materials ready; The described steel band section of getting the raw materials ready comprises successively the steel band feeding device arranged, cuts welder and storage belting, and discharge end of this storage belting is adjacent with the feed end of this guider; Described soldering and sealing plastic extruder extruding end cooperates layout with described wind; The described steel band section of getting the raw materials ready, second switch board, guider, coalignment, wind, soldering and sealing plastic extruder and tubing cutter sweep are arranged on the described second removable underframe, and support frame as described above is arranged on the described the 3rd removable underframe; The described garment bag section of getting the raw materials ready comprises plastics extrusion device, garment bag mould, typing platform and the Work-feeding means that is arranged on the described first described removable underframe, this plastics extrusion device and this typing platform are arranged in juxtaposition, this garment bag mould is positioned at this typing platform feed end, contiguous this typing platform discharge end of this Work-feeding means feed end, the contiguous described coalignment feed end of this Work-feeding means discharge end.
In winding-pipe production device of the present utility model, described band supply section comprises that the steel band section of getting the raw materials ready that cooperatively interacts and steel mould composite log, this steel band section of getting the raw materials ready comprises successively the steel band feeding device arranged, cuts welder, storage belting and coalignment, this steel is moulded composite log and is comprised plastics extrusion device, steel-plastic composite mould, typing platform and Work-feeding means, this plastics extrusion device and this typing platform are arranged in juxtaposition, this steel-plastic composite mould is positioned at this typing platform feed end and contiguous described coalignment discharge end, contiguous this Work-feeding means feed end of this typing platform discharge end; Described feed arrangement is a guider, and this guider and described Work-feeding means are arranged in juxtaposition, and this guider feed end cooperates with this Work-feeding means discharge end, its discharge end cooperates with described wind feed end; Described switch board feeder ear is electrically connected with the driving mechanism that described steel band section of getting the raw materials ready and steel are moulded composite log, the described steel band section of getting the raw materials ready, steel are moulded composite log, switch board, guider, wind and tubing cutter sweep and are arranged on the same described removable underframe, and support frame as described above is arranged on another described removable underframe.
In winding-pipe production device of the present utility model, described removable underframe is pedestal, container, semitrailer or special-purpose vehicle.
Implement winding-pipe production device of the present utility model, compared with the prior art, its beneficial effect is:
1. winding pipe tubing process units is arranged on movably on pedestal, container, semitrailer or the special-purpose vehicle, can be transported to tubing and makes land used carry out produced on-site, save the tubing transit link, thoroughly solved the high problem of tubing cost of transportation;
2. this winding-pipe production device structure is flexible, and can adopt composite strip is that raw material carries out tubing production, also can comprise complete band production, tubing production two parts, uses steel band and plastic granule to carry out tubing production;
3. can satisfy the winding pipe production of all size caliber.
Description of drawings
The utility model is described in further detail below in conjunction with drawings and Examples, in the accompanying drawing:
Fig. 1 is the existing front view that is arranged on the typical winding tube production line in the workshop.
Fig. 2 is the existing front view that is arranged on the another kind of winding tube production line in the workshop.
Fig. 3 is the schematic diagram of the utility model winding-pipe production device embodiment one.
Fig. 4 is the schematic diagram of the utility model winding-pipe production device embodiment two.
Fig. 5 is the schematic diagram of the utility model winding-pipe production device embodiment three.
Fig. 6 is the schematic diagram of the utility model winding-pipe production device embodiment four.
Fig. 7 is the schematic diagram of the utility model winding-pipe production device embodiment five.
Fig. 8 is the schematic diagram of the utility model winding-pipe production device embodiment six.
The specific embodiment
The utility model winding-pipe production device comprises the band supply section that cooperatively interacts and tubing production part, the switch board and the removable underframe that are electrically connected with driving mechanism in band supply section and the tubing production partly.
Tubing production department divides and comprises feed arrangement, wind, tubing cutter sweep and the bracing frame that is arranged on the removable underframe, wind, tubing cutter sweep and bracing frame are equipped with in proper order, and feed arrangement and wind are equipped with the realization tangential admission.
Above-mentioned feed arrangement, wind, tubing cutter sweep and bracing frame can be arranged on the same removable underframe, also can be arranged on the different removable underframe, as feed arrangement, wind, the tubing cutter sweep is separately positioned on the different removable underframe with bracing frame, or feed arrangement, wind, the tubing cutter sweep is arranged on the same removable underframe, and bracing frame is arranged on another removable underframe or the like, but when being arranged on the different removable underframe, different removable underframe should cooperatively interact, and realize wind, tubing cutter sweep and bracing frame cooperate production and feed arrangement to cooperate the realization tangential admission with wind in proper order.
Band supply section and switch board can be arranged on the removable underframe, also can independent removable setting.
Embodiment one
As shown in Figure 3, in the present embodiment, the band supply section comprises the removable composite strip support 100 of the independence that cooperates with feed arrangement, and feed arrangement is a Work-feeding means 12, and the feeder ear of switch board 8 is electrically connected with the driving mechanism of Work-feeding means 12, wind 3 and tubing cutter sweep 2.Switch board 8, Work-feeding means 12, wind 3 and tubing cutter sweep 2 are arranged on the same removable underframe 14, and bracing frame 1 is arranged on another removable underframe (not shown).
Embodiment two
As shown in Figure 4, band supply section in the present embodiment comprises composite strip support 100 and the guider 5 that matches with it, and the contiguous feed arrangement 12 of the discharge end of guider 5, its turnover band direction are provided with along the axis direction (axis direction of the wind 3 that promptly is disposed in order, tubing cutter sweep 2 and bracing frame 1) of tubing production part.The feeder ear of switch board 8 is electrically connected with the driving mechanism of guider 5, feed arrangement 12, wind 3 and tubing cutter sweep 2, and in the present embodiment, feed arrangement is a Work-feeding means 12.Switch board 8, guider 5, Work-feeding means 12, wind 3 and tubing cutter sweep 2 are arranged on the stand of special-purpose vehicle 11, and bracing frame 1 is arranged on another removable underframe (not shown).
Embodiment three
As shown in Figure 5, in the present embodiment, the band supply section comprises the steel band section of getting the raw materials ready, guider 5, soldering and sealing plastic extruder 61 and the removable garment bag support 101 of the independence that cooperates with feed arrangement, and feed arrangement is smooth steel band and is the coalignment 4 of one with steel band and garment bag are chimeric.The contiguous coalignment 4 of the discharge end of guider 5, the turnover band direction of guider 5 is provided with along the axis direction (axis direction of the wind 3 that promptly is disposed in order, tubing cutter sweep 2 and bracing frame 1) of tubing production part, and the feeder ear of switch board 8 is electrically connected with the driving mechanism of guider 5, coalignment 4, wind 3, tubing cutter sweep 2 and the steel band section of getting the raw materials ready.The steel band section of getting the raw materials ready comprises successively the steel band feeding device 10 arranged, cuts welder 9 and storage belting 7, and the discharge end of storage belting 7 is adjacent with the feed end of guider 5; Soldering and sealing plastic extruder 61 extruding ends cooperate layout with wind 3, the steel band section of getting the raw materials ready, switch board 8, guider 5, coalignment 4, wind 3, soldering and sealing plastic extruder 61 and tubing cutter sweep 2 are arranged on the stand of special-purpose vehicle 11, and bracing frame 1 is arranged on another removable underframe (not shown).
Embodiment four
As shown in Figure 6, in the present embodiment, switch board comprises switch board 8 and switch board 81, and removable underframe comprises the stand of special-purpose vehicle 11, stand and the 3rd removable underframe (not shown) of special-purpose vehicle 11A.The band supply section comprises that the steel band section of getting the raw materials ready, the steel on the stand that is arranged on special-purpose vehicle 11 mould composite log, and switch board 8 is arranged on the stand of special-purpose vehicle 11, its feeder ear is electrically connected with the driving mechanism that the steel band section of getting the raw materials ready, steel are moulded composite log.The steel band section of getting the raw materials ready comprises successively the steel band feeding device 10 arranged, cuts welder 9, storage belting 7 and coalignment 4, steel is moulded composite log and is comprised plastics extrusion device 6, steel-plastic composite mould (not shown), typing platform 13, plastics extrusion device 6 is arranged in juxtaposition with typing platform 13, and steel-plastic composite mould is positioned at the feed end of typing platform 13 and the discharge end of contiguous coalignment 4.Feed arrangement is a Work-feeding means 12, and Work-feeding means 12 is positioned at the discharge end of typing platform 13 and is arranged on the stand of special-purpose vehicle 11.
Switch board 81 is arranged on the stand of special-purpose vehicle 11A with wind 3 and tubing cutter sweep 2, and bracing frame 1 is arranged on the 3rd removable underframe.
Embodiment five
As shown in Figure 7, in the present embodiment, switch board comprises switch board 8 and switch board 81, removable underframe comprises the stand of special-purpose vehicle 11, stand and the 3rd removable underframe (not shown) of special-purpose vehicle 11A, the band supply section comprises the steel band section of getting the raw materials ready, guider 5, soldering and sealing plastic extruder 61 and the garment bag section of getting the raw materials ready that cooperates with feed arrangement, and feed arrangement is smooth steel band and is the coalignment 4 of one with steel band and garment bag are chimeric.
The contiguous coalignment 4 of the discharge end of guider 5, its turnover band direction are provided with along the axis direction (axis direction of the wind 3 that promptly is disposed in order, tubing cutter sweep 2 and bracing frame 1) of tubing production part, and the feeder ear of switch board 81 is electrically connected with the driving mechanism of guider 5, coalignment 4, wind 3, tubing cutter sweep 2 and the steel band section of getting the raw materials ready.The steel band section of getting the raw materials ready comprises successively the steel band feeding device 10 arranged, cuts welder 9 and storage belting 7, and the discharge end of storage belting 7 is adjacent with the feed end of guider 5, and the extruding end of soldering and sealing plastic extruder 61 cooperates layout with wind 3.The steel band section of getting the raw materials ready, switch board 81, guider 5, coalignment 4, wind 3, soldering and sealing plastic extruder 61 and tubing cutter sweep 2 are arranged on the stand of special-purpose vehicle 11A, and bracing frame 1 is arranged on the 3rd removable underframe.
The garment bag section of getting the raw materials ready comprises plastics extrusion device 6, garment bag mould (not shown), typing platform 13 and the Work-feeding means 12 on the stand that is arranged on special-purpose vehicle 11, plastics extrusion device 6 is arranged in juxtaposition with typing platform 13, the garment bag mould is positioned at the feed end of typing platform 13, the discharge end of the contiguous typing of the feed end of Work-feeding means 12 platform 13, the feed end of the contiguous coalignment 4 of the discharge end of Work-feeding means 12.
Embodiment six
As shown in Figure 8, in the present embodiment,
The band supply section comprises that the steel band section of getting the raw materials ready that cooperatively interacts and steel mould composite log.The steel band section of getting the raw materials ready comprises successively the steel band feeding device 10 arranged, cuts welder 9, storage belting 7 and coalignment 4, steel is moulded composite log and is comprised plastics extrusion device 6, steel-plastic composite mould (not shown), typing platform 13 and Work-feeding means 12, plastics extrusion device 6 is arranged in juxtaposition with typing platform 13, steel-plastic composite mould is positioned at the feed end of typing platform 13 and the discharge end of contiguous coalignment 4, the feed end of the contiguous Work-feeding means 12 of discharge end of typing platform 13.Feed arrangement is a guider 5, and guider 5 is arranged in juxtaposition with Work-feeding means 12, and the feed end of guider 5 cooperates with the discharge end of Work-feeding means 12, and the discharge end of guider 5 cooperates with the feed end of wind 3 realizes tangential admission.The feeder ear of switch board 8 is electrically connected with the driving mechanism that steel band section of getting the raw materials ready and steel are moulded composite log.The steel band section of getting the raw materials ready, steel are moulded composite log, switch board 8, guider 5, wind 3 and tubing cutter sweep 2 and are arranged on the stand of special-purpose vehicle 11, and bracing frame 1 is arranged on (not shown) on another removable underframe.
Each building block device in the various embodiments described above is existing equipment, and removable underframe can also adopt movably pedestal, container (as stand time container etc.), semitrailer etc. except that adopting special-purpose vehicle.

Claims (9)

1, a kind of winding-pipe production device, comprise the band supply section and the tubing production part that cooperatively interact, the switch board that is electrically connected with this band supply section and tubing production part driving mechanism, this tubing production department divides and comprises feed arrangement, wind, tubing cutter sweep and bracing frame, it is characterized in that, described winding-pipe production device also comprises removable underframe, described feed arrangement, wind, tubing cutter sweep and bracing frame are arranged on the described removable underframe, described wind, tubing cutter sweep and bracing frame are equipped with in proper order, and described feed arrangement and described wind are equipped with the realization tangential admission.
2, winding-pipe production device as claimed in claim 1 is characterized in that, described feed arrangement, wind, tubing cutter sweep and bracing frame are arranged on the same described removable underframe; Or described feed arrangement, wind, tubing cutter sweep and bracing frame are arranged on the different described removable underframe, different described removable underframe can cooperatively interact, and realize that described wind, tubing cutter sweep and bracing frame cooperate production and described feed arrangement to cooperate with described wind in proper order and realize tangential admission.
3, winding-pipe production device as claimed in claim 2 is characterized in that, described band supply section comprises the removable composite strip support of the independence that cooperates with described feed arrangement, and described feed arrangement is a Work-feeding means; Described switch board feeder ear is electrically connected with the driving mechanism of described Work-feeding means, wind and tubing cutter sweep, described switch board, Work-feeding means, wind and tubing cutter sweep are arranged on the same described removable underframe, and support frame as described above is arranged on another described removable underframe.
4, winding-pipe production device as claimed in claim 2, it is characterized in that, described band supply section comprises the composite strip support and the guider that matches with it, the contiguous described feed arrangement of the discharge end of this guider, its turnover band direction are along described tubing production axis direction setting partly, and described switch board feeder ear is electrically connected with the driving mechanism of described guider, feed arrangement, wind and tubing cutter sweep; Described feed arrangement is a Work-feeding means, and described switch board, guider, Work-feeding means, wind and tubing cutter sweep are arranged on the same described removable underframe, and support frame as described above is arranged on another described removable underframe.
5, winding-pipe production device as claimed in claim 2, it is characterized in that, described band supply section comprises the steel band section of getting the raw materials ready, guider, soldering and sealing plastic extruder and the garment bag support that cooperates with described feed arrangement, and described feed arrangement is smooth described steel band and is the coalignment of one with steel band and garment bag are chimeric; The contiguous described coalignment of the discharge end of this guider, its turnover band direction are along described tubing production axis direction setting partly, and described switch board feeder ear is electrically connected with the driving mechanism of described guider, feed arrangement, wind, tubing cutter sweep and the steel band section of getting the raw materials ready; The described steel band section of getting the raw materials ready comprises successively the steel band feeding device arranged, cuts welder and storage belting, and discharge end of this storage belting is adjacent with the feed end of this guider; Described soldering and sealing plastic extruder extruding end cooperates layout with described wind; The described steel band section of getting the raw materials ready, switch board, guider, coalignment, wind, soldering and sealing plastic extruder and tubing cutter sweep are arranged on the same described removable underframe, and support frame as described above is arranged on another described removable underframe.
6, winding-pipe production device as claimed in claim 2, it is characterized in that, described switch board comprises first switch board and second switch board, described removable underframe comprises first, second, third removable underframe, described band supply section comprises that the steel band section of getting the raw materials ready, the steel that are arranged on this first removable underframe mould composite log, and described first switch board is arranged on this first removable underframe, its feeder ear is electrically connected with the driving mechanism that the described steel band section of getting the raw materials ready, steel are moulded composite log; The described steel band section of getting the raw materials ready comprises successively the steel band feeding device arranged, cuts welder, storage belting and coalignment, this steel is moulded composite log and is comprised plastics extrusion device, steel-plastic composite mould, typing platform, this plastics extrusion device and this typing platform are arranged in juxtaposition, and this steel-plastic composite mould is positioned at this typing platform feed end and contiguous described coalignment discharge end; Described feed arrangement is a Work-feeding means, and this Work-feeding means is positioned at described typing platform discharge end and is arranged on the described first removable underframe;
Described second switch board and described wind and tubing cutter sweep are arranged on the described second removable underframe, and support frame as described above is arranged on the described the 3rd removable underframe.
7, winding-pipe production device as claimed in claim 2, it is characterized in that, described switch board comprises first switch board and second switch board, described removable underframe comprises first, second, third removable underframe, described band supply section comprises the steel band section of getting the raw materials ready, guider, soldering and sealing plastic extruder and the garment bag section of getting the raw materials ready that cooperates with described feed arrangement, and described feed arrangement is smooth steel band and is the coalignment of one with steel band and garment bag are chimeric;
The contiguous described feed arrangement of the discharge end of described guider, its turnover band direction are along described tubing production axis direction setting partly, and the described second switch board feeder ear is electrically connected with the driving mechanism of described guider, coalignment, wind, tubing cutter sweep and the steel band section of getting the raw materials ready; The described steel band section of getting the raw materials ready comprises successively the steel band feeding device arranged, cuts welder and storage belting, and discharge end of this storage belting is adjacent with the feed end of this guider; Described soldering and sealing plastic extruder extruding end cooperates layout with described wind; The described steel band section of getting the raw materials ready, second switch board, guider, coalignment, wind, soldering and sealing plastic extruder and tubing cutter sweep are arranged on the described second removable underframe, and support frame as described above is arranged on the described the 3rd removable underframe;
The described garment bag section of getting the raw materials ready comprises plastics extrusion device, garment bag mould, typing platform and the Work-feeding means that is arranged on the described first described removable underframe, this plastics extrusion device and this typing platform are arranged in juxtaposition, this garment bag mould is positioned at this typing platform feed end, contiguous this typing platform discharge end of this Work-feeding means feed end, the contiguous described coalignment feed end of this Work-feeding means discharge end.
8, winding-pipe production device as claimed in claim 2, it is characterized in that, described band supply section comprises that the steel band section of getting the raw materials ready that cooperatively interacts and steel mould composite log, this steel band section of getting the raw materials ready comprises the steel band feeding device of arranging successively, cut welder, storage belting and coalignment, this steel is moulded composite log and is comprised the plastics extrusion device, steel-plastic composite mould, typing platform and Work-feeding means, this plastics extrusion device and this typing platform are arranged in juxtaposition, this steel-plastic composite mould is positioned at this typing platform feed end and contiguous described coalignment discharge end, contiguous this Work-feeding means feed end of this typing platform discharge end; Described feed arrangement is a guider, and this guider and described Work-feeding means are arranged in juxtaposition, and this guider feed end cooperates with this Work-feeding means discharge end, its discharge end cooperates with described wind feed end; Described switch board feeder ear is electrically connected with the driving mechanism that described steel band section of getting the raw materials ready and steel are moulded composite log, the described steel band section of getting the raw materials ready, steel are moulded composite log, switch board, guider, wind and tubing cutter sweep and are arranged on the same described removable underframe, and support frame as described above is arranged on another described removable underframe.
As the described winding-pipe production device of one of claim 1 to 8, it is characterized in that 9, described removable underframe is pedestal, container, semitrailer or special-purpose vehicle.
CNU2008202358317U 2008-12-26 2008-12-26 Winding pipe manufacturing device Expired - Lifetime CN201350686Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008202358317U CN201350686Y (en) 2008-12-26 2008-12-26 Winding pipe manufacturing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008202358317U CN201350686Y (en) 2008-12-26 2008-12-26 Winding pipe manufacturing device

Publications (1)

Publication Number Publication Date
CN201350686Y true CN201350686Y (en) 2009-11-25

Family

ID=41374074

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008202358317U Expired - Lifetime CN201350686Y (en) 2008-12-26 2008-12-26 Winding pipe manufacturing device

Country Status (1)

Country Link
CN (1) CN201350686Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106584828A (en) * 2016-11-28 2017-04-26 广东亿洋管业科技有限公司 Coiling guide mechanism for coiling wires of net pipe
CN116653311A (en) * 2023-07-31 2023-08-29 河北高大永恒塑料制品有限公司 Full-automatic production line for plastic products

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106584828A (en) * 2016-11-28 2017-04-26 广东亿洋管业科技有限公司 Coiling guide mechanism for coiling wires of net pipe
CN116653311A (en) * 2023-07-31 2023-08-29 河北高大永恒塑料制品有限公司 Full-automatic production line for plastic products
CN116653311B (en) * 2023-07-31 2023-09-26 河北高大永恒塑料制品有限公司 Full-automatic production line for plastic products

Similar Documents

Publication Publication Date Title
CN100380040C (en) Coextruding heat winding structure wall pipe, processing method and method
CN101456253A (en) Winding-pipe production device
CN101480847B (en) Multi-layer co-extrusion film-blowing equipment and multi-layer co-extrusion film-blowing technique
CN102700144A (en) Equipment and production process for forming cellular board by continuous extruding vacuum
CN106287009A (en) Frame-type spiral winding plastic tube and produce equipment and production technology
CN102072365B (en) Method and device for manufacturing plastic composite pipe with flexibly-knitted wire mesh skeleton
CN201350686Y (en) Winding pipe manufacturing device
CN103802341A (en) Winding-welding corrugated steel-plastic pipe equipment and production technology
CN106738984B (en) Continuous hot-pressing plasticizing pipe making machine
CN209257467U (en) Polyethylene glass winding structure wall pipe production system
CN2810959Y (en) Equipment for manufacturing plastic-foaming square bar
CN206093246U (en) Frame type spiral winding plastic tubing and production facility thereof
CN201640099U (en) Metallocene anti-pesticide flower membrane
CN202293359U (en) Three-walled corrugated pipe production equipment
CN212072872U (en) Double-wall corrugated pipe production device
CN102390118A (en) Production device and production method of three-wall corrugated pipe
CN105034338A (en) Surface layer co-extrusion winding pipe production equipment
CN201020786Y (en) Plant fiber gluing forming machine
CN209888111U (en) Double-wall corrugated pipe high-speed production line adopting equidirectional conical double screws
CN108274722A (en) Bellows double layer socket joint is molded flaring module tail portion pressing device online
CN103950215A (en) Device and process for producing steel-plastic winding and welding corrugated pipes
CN203401712U (en) Double-screw extruder for double-layer co-extrusion sheet extruder
CN208841789U (en) A kind of plastic granulator extrusion composite energy-saving tuber
CN203543053U (en) Large-aperture steel wire compound pipeline production system
CN220923235U (en) Three-layer co-extrusion pipe production line suitable for PP and calcium carbonate processing

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Winding-pipe production device

Effective date of registration: 20131118

Granted publication date: 20091125

Pledgee: Hengfeng bank, Limited by Share Ltd, Chengdu branch

Pledgor: Huahan Pipe S & T Co., Ltd.

Registration number: 2013990000865

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
PP01 Preservation of patent right

Effective date of registration: 20140711

Granted publication date: 20091125

RINS Preservation of patent right or utility model and its discharge
PD01 Discharge of preservation of patent

Date of cancellation: 20150111

Granted publication date: 20091125

PP01 Preservation of patent right

Effective date of registration: 20150116

Granted publication date: 20091125

RINS Preservation of patent right or utility model and its discharge
PD01 Discharge of preservation of patent

Date of cancellation: 20150716

Granted publication date: 20091125

PP01 Preservation of patent right

Effective date of registration: 20150716

Granted publication date: 20091125

RINS Preservation of patent right or utility model and its discharge
PD01 Discharge of preservation of patent

Date of cancellation: 20160116

Granted publication date: 20091125

PP01 Preservation of patent right

Effective date of registration: 20160116

Granted publication date: 20091125

RINS Preservation of patent right or utility model and its discharge
CX01 Expiry of patent term

Granted publication date: 20091125

CX01 Expiry of patent term
PD01 Discharge of preservation of patent
PD01 Discharge of preservation of patent

Date of cancellation: 20181226

Granted publication date: 20091125