CN201347547Y - 抽水蓄能电站接地网 - Google Patents

抽水蓄能电站接地网 Download PDF

Info

Publication number
CN201347547Y
CN201347547Y CNU2008202303850U CN200820230385U CN201347547Y CN 201347547 Y CN201347547 Y CN 201347547Y CN U2008202303850 U CNU2008202303850 U CN U2008202303850U CN 200820230385 U CN200820230385 U CN 200820230385U CN 201347547 Y CN201347547 Y CN 201347547Y
Authority
CN
China
Prior art keywords
netting twine
ground connection
grounding
connection netting
grounded screen
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2008202303850U
Other languages
English (en)
Inventor
孙成章
唐健
胡代清
陈秋
杨洪涛
彭福元
冯钢声
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUBEI BAILIANHE PUMPED STORAGE Co Ltd
State Grid Corp of China SGCC
State Grid Xinyuan Co Ltd
Original Assignee
HUBEI BAILIANHE PUMPED STORAGE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUBEI BAILIANHE PUMPED STORAGE Co Ltd filed Critical HUBEI BAILIANHE PUMPED STORAGE Co Ltd
Priority to CNU2008202303850U priority Critical patent/CN201347547Y/zh
Application granted granted Critical
Publication of CN201347547Y publication Critical patent/CN201347547Y/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Sewage (AREA)

Abstract

抽水蓄能电站接地网,涉及一种上、下水库之间,水库和河道之间的接地网。由上水库中的水中接地网,上水库进、出水口处的引出接地网线,引水涵洞中的涵洞接地网线,球阀室中的球阀,地下主厂房中的接地网线,进厂交通网,下游河道中的接地网,母线洞中的接地网线,主变洞中的接地网线,尾水闸门中的接地网线,高压竖井中的接地网线,中控楼和开关站中的接地网线,下水库进、出水口的接地网线和下水库中的接地网构成。本实用新型因地制宜布置接地网,充分利用自然接地体,并适当敷设人工接地体,如水中接地网等,降低了接地网的接地电阻,组成低阻抗,并符合均压要求的接地系统。本实用新型设计科学合理、接地安全。

Description

抽水蓄能电站接地网
技术领域
本实用新型涉及一种上、下水库之间,水库和河道之间的接地网。
背景技术
一般而言,大型水电站接地系统的主要散流体为拦河大坝上游挡水墙的钢筋网(做为自然接地体),相当于一个大面积的矩形垂直接地网,另外,还可在河底布设水平接地网,亦可在两岸布设水平地网。
白莲河抽水蓄能电站由上水库(坝)、下水库(坝)、引水隧洞、地下厂房洞室群、户外开关站(含出线场)、户外管理与生活区以及其它辅助设施和施工临时设施等组成。枢纽布置范围广泛,电站地形、地质、水文等情况非常复杂,接地电阻值要求很低,电站接地装置设计能否满足要求,是关系到电站能否安全运行的重大问题。电站枢纽工程地处花岗岩地区,属高电阻率区域。按DL/T5901-1999《水力发电厂接地设计技术导则》规定,大接地短路电流系统的水电厂接地装置的接地电阻宜符合R≤2000/I的要求。白莲河抽水蓄能电站最大入地短路电流(网内发生500kV单相接地短路故障)为7.5kA,按规范要求,电站接地电阻宜不超过0.267Ω。初步估算接地装置要求的面积约3.5km2。对于白莲河抽水蓄能电站,受制于下库为已建的水库和电站枢纽接地装置面积要达到3.5km2,这是电站接地设计的难点之一。
发明内容
本实用新型的目的是针对上述现状,旨在提供一种能充分利用自然接地体接地,设计科学合理、接地电阻值能满足要求的抽水蓄能电站接地网。
本实用新型目的的实现方式为,抽水蓄能电站接地网,在上水库中有水中接地网,敷设在底板混凝土的面层中或河床岩石上,由地网固定体,上水库进、出水口处的接地网接向上引出接地网线,引出接地网线通过引水涵洞中的涵洞接地网线,涵洞接地网线通过球阀室中的球阀,经向上引出接地网线接地下主厂房中的接地网线,主厂房中的接地网线一路经进厂交通网接下游河道中的接地网,其它的经向上引出接地网线接母线洞中的接地网线,经向上引出接地网线接主变洞中的接地网线,经向上引出接地网线接尾水闸门中的接地网线,接地网线接尾水闸门中的接地网线其中一路通过高压竖井中的接地网线接中控楼和开关站中的接地网线,其它的经尾水涵洞中的接地网线、下水库进、出水口的接地网线与下水库中的接地网。
本实用新型设计科学合理,在电站实际条件下,充分利用厂区低电阻率区域,合理布置接地网,尽可能降低接地网的接地电阻值,组成低阻抗并符合均压要求的接地系统;结合电站的水工枢纽布置和电气设备布置,因地制宜布置接地网,充分利用压力钢管、地下厂房钢筋等自然接地体,并适当敷设人工接地体,如水中接地网等,接地安全。
附图说明
附图是本实用新型结构示意图
具体实施方式
参照附图,在上水库2中有水中接地网3,敷设在底板混凝土的面层中或河床岩石上,由地网固定体1,上水库进、出水口处的接地网3接向上引出接地网线4,引出接地网线4通过引水涵洞中的涵洞接地网线5,涵洞接地网线5通过球阀室6中的球阀,经向上引出接地网线接地下主厂房7中的接地网线,主厂房7中的接地网线一路经进厂交通网17接下游河道18中的接地网19,其它的经向上引出接地网线接母线洞8中的接地网线,经向上引出接地网线接主变洞9中的接地网线,经向上引出接地网线接尾水闸门10中的接地网线,接地网线接尾水闸门10中的接地网线其中一路通过高压竖井11中的接地网线接中控楼12和500KV开关站13中的接地网线,其它的经尾水涵洞14中的接地网线、下水库进、出水口15的接地网线与下水库中的接地网16。
水中接地网3,敷设在底板混凝土的面层中或河床岩石上,是平面接地网,上面是库水,下面是岩石。其它部分的接地装置,如上库地面平台接地网和一些建筑物的接地体,因为散流接地电阻都较大,可忽略不计。
涵洞接地网线5引水隧洞走向布置,接接地网线敷设在隧洞内壁。如引水隧洞是钢筋混凝土衬砌,接接地网线与圈筋搭接;如引水隧洞是钢板衬砌,接接地网线与钢板搭焊。
引水隧洞接地网线是深埋式长管状接地体,为水平管、垂直管、斜管三类管状接地体组合。
集中布置电气设备的主厂房7内有主、副厂房洞、母线洞、主变洞、尾闸洞等,这些厂房洞群接地网线是由埋没在洞壁混凝土中由接地网线组成的深埋式笼形接地网。为了扩大散流效果,还要求接接地网线与岩壁支护锚杆连接。对地下式厂房,厂房洞群接地网是深埋式长方体接地体。厂房中的接地网线中的竖、斜井接地网是埋入式圆管状或板状接地体。
除厂房洞等外,还有一些辅助洞室敷设了接接地网线,如:①交通、排风、电缆竖(斜)井和水力调压井,②交通、通风、排水、电缆水平廊道。竖(斜)井接地网是埋入式圆管状或板状接地体。
还有水平廊道接地网,厂房中的接地网线的水平廊道接地网是深埋式长条状接地体。
尾水涵洞14中的接地网线连接厂房洞群接地网和下水库接地网16,它与涵洞接地网线5相似。尾水隧洞接地网16为水平管、斜管二类管状接地体组合。
屋外开关站13为GIS开关站。500KV开关站13中的接地网线一般敷设在开挖后的回填层中,它是浅埋水平网,网格较密,主要起均压作用。
下水库中的接地网16布置敷设在下库库底河床上,还有部分敷设在下库进、出水口15和下库坝基里。下库水中接地网面积一般较大,是主要的散流接地网。与水中接地网3相似,是平面接地网,上面是库水,下面是岩石。

Claims (6)

1、抽水蓄能电站接地网,其特征在于在上水库中有水中接地网,敷设在底板混凝土的面层中或河床岩石上,由地网固定体,上水库进、出水口处的接地网接向上引出接地网线,引出接地网线通过引水涵洞中的涵洞接地网线,涵洞接地网线通过球阀室中的球阀,经向上引出接地网线接地下主厂房中的接地网线,主厂房中的接地网线一路经进厂交通网接下游河道中的接地网,其它的经向上引出接地网线接母线洞中的接地网线,经向上引出接地网线接主变洞中的接地网线,经向上引出接地网线接尾水闸门中的接地网线,接地网线接尾水闸门中的接地网线其中一路通过高压竖井中的接地网线接中控楼和开关站中的接地网线,其它的经尾水涵洞中的接地网线、下水库进、出水口的接地网线与下水库中的接地网。
2、根据权利要求1所述的抽水蓄能电站接地网,其特征在于引水涵洞接地网线(5)沿引水隧洞走向布置,接地网线敷设在隧洞内壁,涵洞接地网线与圈筋或钢板搭焊。
3、根据权利要求1所述的抽水蓄能电站接地网,其特征在于引水隧洞接地网线(5)是深埋式长管状接地体,为水平管、垂直管、斜管三类管状接地体组合。
4、根据权利要求1所述的抽水蓄能电站接地网,其特征在于厂房洞群中的接地网线是由埋没在洞壁混凝土中接接地网线组成的深埋式笼形接地网。
5、根据权利要求1所述的抽水蓄能电站接地网,其特征在于厂房中的接地网线中的竖、斜井接地网是埋入式圆管状或板状接地体。
6、根据权利要求1所述的抽水蓄能电站接地网,其特征在于厂房中的接地网线的水平廊道接地网是深埋式长条状接地体。
CNU2008202303850U 2008-12-18 2008-12-18 抽水蓄能电站接地网 Expired - Lifetime CN201347547Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008202303850U CN201347547Y (zh) 2008-12-18 2008-12-18 抽水蓄能电站接地网

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008202303850U CN201347547Y (zh) 2008-12-18 2008-12-18 抽水蓄能电站接地网

Publications (1)

Publication Number Publication Date
CN201347547Y true CN201347547Y (zh) 2009-11-18

Family

ID=41367019

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008202303850U Expired - Lifetime CN201347547Y (zh) 2008-12-18 2008-12-18 抽水蓄能电站接地网

Country Status (1)

Country Link
CN (1) CN201347547Y (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102418330A (zh) * 2011-07-29 2012-04-18 黄必录 一种蓄能调峰水电站
CN103166141A (zh) * 2011-12-14 2013-06-19 河南省电力勘测设计院 一种城市220kV全户内变电站的接地网
CN103306250A (zh) * 2013-06-24 2013-09-18 罗雪睿 一种隧道内引水式梯级水电站及其建设方法
CN103362290A (zh) * 2013-07-30 2013-10-23 中水东北勘测设计研究有限责任公司 一种地下厂房电缆出线与排风系统结合布置的竖井
CN107658774A (zh) * 2017-11-15 2018-02-02 河南省水利勘测设计研究有限公司 大型抽水蓄能电站发电电动机机压设备布置结构
CN110195597A (zh) * 2019-06-14 2019-09-03 中国水利水电建设工程咨询西北有限公司 一种适于tbm施工的抽水蓄能硐室及施工方法

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102418330A (zh) * 2011-07-29 2012-04-18 黄必录 一种蓄能调峰水电站
CN103166141A (zh) * 2011-12-14 2013-06-19 河南省电力勘测设计院 一种城市220kV全户内变电站的接地网
CN103166141B (zh) * 2011-12-14 2016-04-06 河南省电力勘测设计院 一种城市220kV全户内变电站的接地网
CN103306250A (zh) * 2013-06-24 2013-09-18 罗雪睿 一种隧道内引水式梯级水电站及其建设方法
CN103306250B (zh) * 2013-06-24 2015-07-22 罗雪睿 一种隧道内引水式梯级水电站及其建设方法
CN103362290A (zh) * 2013-07-30 2013-10-23 中水东北勘测设计研究有限责任公司 一种地下厂房电缆出线与排风系统结合布置的竖井
CN103362290B (zh) * 2013-07-30 2015-04-22 中水东北勘测设计研究有限责任公司 一种地下厂房电缆出线与排风系统结合布置的竖井
CN107658774A (zh) * 2017-11-15 2018-02-02 河南省水利勘测设计研究有限公司 大型抽水蓄能电站发电电动机机压设备布置结构
CN107658774B (zh) * 2017-11-15 2024-02-09 河南省水利勘测设计研究有限公司 大型抽水蓄能电站发电电动机机压设备布置结构
CN110195597A (zh) * 2019-06-14 2019-09-03 中国水利水电建设工程咨询西北有限公司 一种适于tbm施工的抽水蓄能硐室及施工方法
CN110195597B (zh) * 2019-06-14 2024-04-09 中国水利水电建设工程咨询西北有限公司 一种适于tbm施工的抽水蓄能硐室及施工方法

Similar Documents

Publication Publication Date Title
CN201347547Y (zh) 抽水蓄能电站接地网
CN100469980C (zh) 一种自流式地下水库的取水廊道
CN205077453U (zh) 一种面板堆石坝和上游围堰结合的坝体结构
CN102227998A (zh) 农田灌排两用暗管系统
CN105201001A (zh) 一种岩溶地区大型溶洞的复合防渗结构及其施工方法
CN102705006B (zh) 采用井点降水法治理营运隧道水患的方法
CN201933510U (zh) 用于水电工程地下厂房的出线竖井结构
CN205062827U (zh) 一种岩溶地区大型溶洞的复合防渗结构
CN110195597B (zh) 一种适于tbm施工的抽水蓄能硐室及施工方法
CN101446107B (zh) 富水地带水电站地下厂房洞室分层排水结构及其施工方法
CN205259201U (zh) 一种隧洞地下水控排装置
CN105970882B (zh) 解决面板坝施工期坝体反渗水问题的结构及其构造方法
CN205134292U (zh) 高拱坝施工导流洞结构
CN203768881U (zh) 一种山体、坝体廊道渗水排水装置
CN207419417U (zh) 用于引水发电工程的敞开式引水系统
CN204753538U (zh) 地下厂房生态流量小机组布置结构
CN203855944U (zh) 一种地下厂房出线洞结构
CN105155488A (zh) 水电站地下厂房生态流量小机组布置方式及结构
CN204608736U (zh) 一种布置在溶洞内的发电厂房
CN208899441U (zh) 用于水利发电工程的发电厂房布置结构
CN206205109U (zh) 一种水电站地下厂房渗漏排水总管布置结构
CN204608729U (zh) 土坝输水管防渗结构
CN202055256U (zh) 大面积渗水坡面集中引排水装置
CN203160236U (zh) 可采集地源热能的抗浮锚杆
CN105552594A (zh) 一种变电站地网注水渗流降阻装置及方法

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE GRID XINYUAN CO., LTD. HUBEI BAILIANHE PUMPE

Effective date: 20130905

Owner name: STATE ELECTRIC NET CROP.

Free format text: FORMER OWNER: HUBEI BAILIANHE PUMPED STORAGE COMPANY LTD.

Effective date: 20130905

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 438600 HUANGGANG, HUBEI PROVINCE TO: 100031 XICHENG, BEIJING

TR01 Transfer of patent right

Effective date of registration: 20130905

Address after: 100031 Xicheng District, Chang'an Avenue, No. 86,

Patentee after: State Grid Corporation of China

Patentee after: State Grid Xinyuan Co., Ltd.

Patentee after: Hubei Bailianhe Pumped Storage Company Ltd.

Address before: Huanggang City, Hubei province 438600 lotus Township, Luotian County

Patentee before: Hubei Bailianhe Pumped Storage Company Ltd.

CX01 Expiry of patent term

Granted publication date: 20091118

CX01 Expiry of patent term