CN201346800Y - Track plate film tool sleeve fixing body of ballast-less track - Google Patents

Track plate film tool sleeve fixing body of ballast-less track Download PDF

Info

Publication number
CN201346800Y
CN201346800Y CNU200820181532XU CN200820181532U CN201346800Y CN 201346800 Y CN201346800 Y CN 201346800Y CN U200820181532X U CNU200820181532X U CN U200820181532XU CN 200820181532 U CN200820181532 U CN 200820181532U CN 201346800 Y CN201346800 Y CN 201346800Y
Authority
CN
China
Prior art keywords
sleeve
self
film tool
screw
fixing body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU200820181532XU
Other languages
Chinese (zh)
Inventor
吴玉林
韩孟国
李晗
常春梅
王玉民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HULUDAO SHOUGANG DONGHUA MACHINERY CO Ltd
Original Assignee
HULUDAO SHOUGANG DONGHUA MACHINERY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HULUDAO SHOUGANG DONGHUA MACHINERY CO Ltd filed Critical HULUDAO SHOUGANG DONGHUA MACHINERY CO Ltd
Priority to CNU200820181532XU priority Critical patent/CN201346800Y/en
Application granted granted Critical
Publication of CN201346800Y publication Critical patent/CN201346800Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Machines For Laying And Maintaining Railways (AREA)

Abstract

The utility model discloses a track plate film tool sleeve fixing body of a ballast-less track; the structure of the fixing body is characterized in that the lower part of a mandrel is provided with a screw, and the middle part is provided with a conical surface; the outside of the mandrel is sleeved with a sealing ring for preventing mortar from entering, an adjusting elastic sleeve for positioning the sleeve, a guide bush and a self-centering elastic sleeve from down to top, and the top is screwed with an adjusting screw; and a washer for pressing the elastic sleeve is arranged between the screw and the self-centering elastic sleeve. The mandrel is sleeved with the elastic washer and fixed on a positioning block of a film tool; the adjusting screw is screwed, so that the self-centering elastic sleeve and the adjusting elastic sleeve expand to the ideal size for fixing the sleeve; after the sleeve is inserted, a track plate is poured; after the track plate is solidified, the fixing body is pulled out; and the pre-embedded sleeve left in the track plate can reach the required precision. The sleeve fixing body is convenient, fast and reliable in pre-embedded sleeve fixation and pulling out, has high positioning precision, and long service life.

Description

Ballastless track boards film tool sleeve pipe fixed body
One, technical field
The utility model relates to a kind of film tool annex of producing ballastless track boards, specifically a kind of ballastless track boards film tool sleeve pipe fixed body.
Two, background technology
Present ballastless track of high-speed railway track plate is provided with service sleeve, utilizes this sleeve pipe to connect the location that rail fastener system is realized rail.This sleeve pipe is embedded in the concrete railway board perpendicularity and has relatively high expectations, and its precision must guarantee by the sleeve pipe fixed body of producing on the used film tool of track plate.Before the utility model proposes, the approximate truncated cone of sleeve pipe fixed body shape and structure on the film tool of production track plate, only the embossing face by the fixed body bottom makes the sleeve pipe location, structures shape has only one place, bottom location and position point area smaller, service sleeve tilts in the track plate easily when concrete perfusion track plate, do not guarantee the positioning accuracy of service sleeve, cause rail fastener system can not make the accurate positioning and fixing of rail.Described sleeve pipe fixed body does not have sealing device is arranged, and between mortar immerses two easily during concrete perfusion, influences the service life of fixed body.
Three, summary of the invention
In order to solve the deficiencies in the prior art, the purpose of this utility model provides a kind of long service life, guarantees the ballastless track boards film tool sleeve pipe fixed body of service sleeve positioning accuracy.
Realize that the technical scheme that the purpose of this utility model adopts is: this sleeve pipe fixed body mainly is made up of adjustment screw, packing ring, self-centering resilient sleeve, guide pin bushing, adjustable elastic cover, sealing ring, axle; The axle bottom is provided with screw rod, there is taper surface at the middle part, and axle is with the sealing ring that prevents that mortar from entering outward from bottom to up, adjustable elastic cover, guide pin bushing, self-centering resilient sleeve that sleeve pipe is played the role of positioning, the top is screwed with the adjustment screw, and the packing ring of the resilient sleeve of pressing is arranged between screw and self-centering resilient sleeve.Axle is fixed on the locating piece of film tool after putting elastic washer, turning the adjustment screw makes self-centering resilient sleeve, adjustable elastic cover expand into the required ideal dimensions of fixed sleeving, plug the perfusion of carrying out the track plate behind the sleeve pipe, extract fixed body after solidifying, the service sleeve of staying in the track plate can reach precision prescribed.
Advantage compared with prior art of the present utility model: the one, because self-centering resilient sleeve and adjustable elastic cover carry out location, two places to sleeve pipe, guaranteed the precision after service sleeve is fixed, rail fastener system can make the accurate positioning and fixing of rail; The 2nd, the O RunddichtringO of axle bottom can prevent that mortar from entering between fixed body and sleeve pipe, prolonged the service life of fixed body.In a word, this sleeve pipe fixed body make service sleeve fix and extract easy to operate, fast and reliable, positioning accuracy height, long service life.
Four, description of drawings
Fig. 1 is the sectional structure chart of the utility model ballastless track boards film tool sleeve pipe fixed body.
Five, the specific embodiment
In the drawings, the utility model ballastless track boards film tool sleeve pipe fixed body mainly is made up of adjustment screw, packing ring, self-centering resilient sleeve, guide pin bushing, adjustable elastic cover, sealing ring, axle; Axle 8 bottoms are provided with screw rod 13, there is taper surface 10 at the middle part, the axle 8 outer sealing rings 6 that prevent that mortar from entering that are with from bottom to up, adjustable elastic cover 5, guide pin bushing 4, self-centering resilient sleeve 3 that sleeve pipe is played the role of positioning, axle 8 tops are screwed with adjusts screw 1, and 3 of screw 1 and self-centering resilient sleeve have the packing ring 2 of the resilient sleeve of pressing.Be with elastic washer 7 on the axle 8 bottom screw rods 13, axle 8 is vertically fixed on the locating piece 12 of film tool 11; Turn and adjust screw 1 and make self-centering resilient sleeve 3, adjustable elastic cover 5 expand into the required ideal dimensions of fixed sleeving 9, plug the perfusion of carrying out the track plate behind the sleeve pipe 9, extract fixed body after solidifying, the service sleeve of staying in the track plate 9 can reach precision prescribed.

Claims (2)

1, a kind of ballastless track boards film tool sleeve pipe fixed body mainly is made up of adjustment screw, packing ring, self-centering resilient sleeve, guide pin bushing, adjustable elastic cover, sealing ring, axle; It is characterized in that: described axle bottom is provided with screw rod (13), there is taper surface (10) at the middle part, the outer sealing ring (6) that prevents mortar and enter that is with from bottom to up of axle (8), adjustable elastic cover (5), guide pin bushing (4), self-centering resilient sleeve (3) that sleeve pipe is played the role of positioning, axle (8) top is screwed with adjusts screw (1), and the packing ring (2) of the resilient sleeve of pressing is arranged between screw (1) and self-centering resilient sleeve (3).
2, ballastless track boards film tool sleeve pipe fixed body as claimed in claim 1, it is characterized in that: be with elastic washer (7) on described axle (8) the bottom screw rod (13), axle (8) is vertically fixed on the locating piece (12) of film tool (11).
CNU200820181532XU 2008-12-24 2008-12-24 Track plate film tool sleeve fixing body of ballast-less track Expired - Fee Related CN201346800Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU200820181532XU CN201346800Y (en) 2008-12-24 2008-12-24 Track plate film tool sleeve fixing body of ballast-less track

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU200820181532XU CN201346800Y (en) 2008-12-24 2008-12-24 Track plate film tool sleeve fixing body of ballast-less track

Publications (1)

Publication Number Publication Date
CN201346800Y true CN201346800Y (en) 2009-11-18

Family

ID=41366278

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU200820181532XU Expired - Fee Related CN201346800Y (en) 2008-12-24 2008-12-24 Track plate film tool sleeve fixing body of ballast-less track

Country Status (1)

Country Link
CN (1) CN201346800Y (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101837609A (en) * 2010-04-29 2010-09-22 曾凡荣 Accurate positioning device for track slabs and embedded sleeves of prefabricated parts of high-speed railway
CN103144190A (en) * 2013-02-28 2013-06-12 中铁八局集团桥梁工程有限责任公司 Plastic sleeve pipe positioning method for double-block sleeper
CN103963159A (en) * 2014-05-07 2014-08-06 浙江省天和建材集团有限公司地铁管片分公司 Fixing and installing mechanism for aluminum mould embedded part
CN103963158A (en) * 2014-05-07 2014-08-06 浙江省天和建材集团有限公司地铁管片分公司 Fixing bracket for aluminum mould embedded part
CN109594436A (en) * 2018-12-11 2019-04-09 上铁芜湖轨道板有限公司 A kind of track and its installation method for non-fragment orbit concrete railway board
CN112025934A (en) * 2020-08-28 2020-12-04 上海城建预制构件有限公司 Fixing device for fastener embedded part in prefabricated part and application method thereof

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101837609A (en) * 2010-04-29 2010-09-22 曾凡荣 Accurate positioning device for track slabs and embedded sleeves of prefabricated parts of high-speed railway
CN103144190A (en) * 2013-02-28 2013-06-12 中铁八局集团桥梁工程有限责任公司 Plastic sleeve pipe positioning method for double-block sleeper
CN103144190B (en) * 2013-02-28 2014-11-26 中铁八局集团桥梁工程有限责任公司 Plastic sleeve pipe positioning method for double-block sleeper
CN103963159A (en) * 2014-05-07 2014-08-06 浙江省天和建材集团有限公司地铁管片分公司 Fixing and installing mechanism for aluminum mould embedded part
CN103963158A (en) * 2014-05-07 2014-08-06 浙江省天和建材集团有限公司地铁管片分公司 Fixing bracket for aluminum mould embedded part
CN109594436A (en) * 2018-12-11 2019-04-09 上铁芜湖轨道板有限公司 A kind of track and its installation method for non-fragment orbit concrete railway board
CN112025934A (en) * 2020-08-28 2020-12-04 上海城建预制构件有限公司 Fixing device for fastener embedded part in prefabricated part and application method thereof
CN112025934B (en) * 2020-08-28 2021-07-13 上海城建预制构件有限公司 Fixing device for fastener embedded part in prefabricated part and application method thereof

Similar Documents

Publication Publication Date Title
CN201346800Y (en) Track plate film tool sleeve fixing body of ballast-less track
CN203636427U (en) Positioning device of automotive engine cylinder body
CN204658020U (en) A kind of knuckle removes gate fixture
CN203092154U (en) Adjustable shock absorption support for thin-wall part processing
CN201881475U (en) Locating shaft for threaded sleeve embedded part of ballastless track board
CN203928941U (en) A kind of spindle taper hole glitch detection frock
CN201355246Y (en) Small prism base for measuring non-fragment track slab
CN204440736U (en) A kind of idioms teaching demonstration board
CN202317742U (en) Centering ring for correcting boring machine fixture
CN206864057U (en) The portable tooth jaw mounting structure of horizontally adjustable movement
CN203642828U (en) Testing fixture device for positioning and accurate measurement of hole position
CN203197611U (en) Large fine-boring hole machining fixture of rail train traction motor base
CN201702278U (en) Self-locking threaded sleeve shell nosing die
CN204354087U (en) A kind of Novel precise mode bicycle repairing frame
CN204248804U (en) A kind of kit installing Jumper
CN204621556U (en) The accurate adjustment detent mechanism of a kind of lathe side lathe bed
CN205245957U (en) Inner hole measuring device with adjustable it is flexible
CN204277502U (en) A kind of leading screw thick stick end clamping and positioning frock
CN203903853U (en) Upper chord adjustment type positioning supporting device for cargo boom of tower crane
CN204590727U (en) Three-dimensional parking device hypotenuse is taken turns
CN203293469U (en) Mold with inclined top guide plate
CN202786989U (en) Ball socket pin disassembling fixture
CN203380762U (en) Special jig for accurately grinding spindle taper holes
CN201620243U (en) Double-size saddle simple adjusting device
CN201110002Y (en) Mechanism for adjusting vertical position of template

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20091118

Termination date: 20131224