CN201330354Y - Narrow gage single-opened switch device - Google Patents

Narrow gage single-opened switch device Download PDF

Info

Publication number
CN201330354Y
CN201330354Y CNU2008202197086U CN200820219708U CN201330354Y CN 201330354 Y CN201330354 Y CN 201330354Y CN U2008202197086 U CNU2008202197086 U CN U2008202197086U CN 200820219708 U CN200820219708 U CN 200820219708U CN 201330354 Y CN201330354 Y CN 201330354Y
Authority
CN
China
Prior art keywords
rail
straight
bend
narrow gage
switch device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008202197086U
Other languages
Chinese (zh)
Inventor
张利刚
姜峰
郭天辉
印丽娜
王志刚
郭健
杨洪波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Angang Group Mining Co Ltd
Original Assignee
Angang Group Mining Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Angang Group Mining Co Ltd filed Critical Angang Group Mining Co Ltd
Priority to CNU2008202197086U priority Critical patent/CN201330354Y/en
Application granted granted Critical
Publication of CN201330354Y publication Critical patent/CN201330354Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Train Traffic Observation, Control, And Security (AREA)

Abstract

The utility model belongs to the technical field of narrow gage railway route equipment of mines, in particular to a narrow gage single-opened switch device, which is characterized in that a rail switch comprises a pair of point rails which are arranged on one side of a deflection stock rail, a pair of straight rails which are connected with the point rails, and a pair of flexible bends which are connected with the point rails, the rail frog comprises a pair of guard rails which are arranged on the inner side of a single rail in the deflection direction of the flexible bends and are arranged on the inner side of a single rail outside the corresponding direction of the stock rail, a fork center which is connected with a single rail outside and in front of the deflection direction of the flexible bends and a single rail inside the corresponding direction of the stock rail, and a pair of wing rails arranged on the outer side of the fork center. The inlet ends of the wing rails are respectively connected with the single rail in the straight rail running direction and the single rail outside the deflection direction of the flexible bends, and a travelling-out end is provided with a hole towards the fork center direction. The utility model satisfies the requirements that a newly-established mine narrow gage railway transportation and existing mine transportation modulation adopt narrow gage rail switches corresponding to 50kg/m steel rails.

Description

The narrow gage single switch device
Technical field
The utility model belongs to mine narrow gauge railway line materials technical field, relates in particular to a kind of narrow gage single switch device.
Background technology
Narrow gauge track switch is an important component part of building on the narrow gauge railway circuit.Rolling stock moves on rail track, often need enter or cross another circuit from a circuit, and this is also the same with standard gage railway, be by the connection of circuit with intersect equipment and realize.The connection of circuit with intersect the basic pattern of equipment and can be divided into three kinds, both track switch class, fixing class and track switch and the fixing combined crosswise class of intersecting.Their kind is a lot, and is also very complicated.The railway switch that adopts in the transportation of mine narrow gauge railway is the narrow gauge track switch that 43kg/m (or below 43kg/m) rail is made at present.Along with industrialized great development, the big steel mill of each of China has not produced the rail of 43kg/m (or 43kg/m is following).Present newly-built mine narrow gauge railway transports and has now the rail that can not adopt 43kg/m (or 43kg/m is following) in the narrow gauge railway transportation transformation of mine, can only be adopted as the 50kg/m rail.And adopt the 50kg/m rail not have corresponding narrow gauge railway track switch.
Summary of the invention
Be the 50kg/m rail at the railway that adopts in the transportation of present mine narrow gauge railway, and there is not the present situation of narrow gauge switch apparatus, the utility model proposes a kind of narrow gage single switch device, adopt the 50kg/m rail, gauge is 900mm, can solve existing locomotive and enter or cross another circuit, carry out safety and travel smoothly from a circuit.
The purpose of this utility model is achieved through the following technical solutions:
Narrow gage single switch device of the present utility model, comprise stock rail, railway switch, railway frog and coupling part between the two, it is characterized in that described stock rail is made up of straight rail section-bend section-lower and straight track section on straight rail in right side and the left side, described railway switch is by the right side tongue that is located at the stock rail inboard, the left side tongue, the right side bend that is connected of right side tongue therewith, the straight rail in left side that tongue is connected is therewith formed, described railway frog is by the wing rail that is connected with the right side bend with the straight rail in described left side respectively, the fork heart that is located at this wing rail lower inside is formed, and lower and straight track section inboard and straight rail inboard, right side about described wing rail are established a guard rail respectively.
The wing rail upstream end in the described fork heart outside is connected with bend offset direction outside single track with described straight rail craspedodrome direction single track respectively, rolls end away from along fork heart direction opening.
Described railway frog two path working edges are that heart rail two working edges intersect the formed angle of cut less than the right angle.
Interval iron and splice bar are adopted in described coupling part, and whole narrow gage single switch is fixed on the sleeper of railway bed by railway spike.
The radius of curvature of described bend section 4 is 30m.
Described frog length is 2450mm, and central body of frog is fixed on the big base plate.
The tongue that described tongue, straight rail, bend, guard rail, the fork heart, wing rail are made by the 50kg/m rail, straight rail, bend, guard rail, the fork heart, wing rail.
Railway switch is the equipment of pilot engine vehicle heading, mainly contains two stock rails, two tip of a root rails, interval iron, various backing plate and connected component and forms.Wherein tongue is the strength member in the railway switch, and tongue is an end of rail to be planed into pointed, makes it closely connected with the working edge of stock rail, and the swing of tongue utilizes switch machine to finish.
Railway frog is to make wheel rim be crossed the equipment of another strand rail by one rail, be positioned at the side line and the main track rail intersection of track switch, in simple turnout, railway frog two path working edges (heart rail two working edges) intersect the formed angle of cut less than the right angle, so also claim end frog.Because the requirement of wheel walking, making railway frog form both sides is wing rail, middle special structure form for the fork heart, and the front portion of wing rail plays the support wheel operation, and the rear portion plays a part the guide car wheel.Minimum range between two wing rails is a throat of frog.In order to reduce to pitch the wearing and tearing of the heart, the guard rail by both sides makes the wheel and the friction of the fork heart be kept to minimum.
The utility model has satisfied the narrow gauge railway transportation of newly-built mine and had the mine transportation now transforms the needs that adopt the corresponding narrow gauge railway track switch of 50kg/m rail.
Description of drawings
Fig. 1 is the utility model structural representation.
The specific embodiment
Further specify the specific embodiment of the present utility model below in conjunction with accompanying drawing.
As shown in Figure 1, narrow gage single switch device of the present utility model, comprise stock rail, railway switch, railway frog and coupling part between the two, it is characterized in that described stock rail is made up of 7 of straight rail section 1-bend section 4-lower and straight track sections on straight rail 8 in right side and the left side, described railway switch is by the right side tongue 9 that is located at the stock rail inboard, left side tongue 2, the right side bend 10 that is connected of right side tongue 9 therewith, the straight rail 3 in left side that tongue 2 is connected is therewith formed, described railway frog is by the wing rail 5 that is connected with right side bend 10 with the straight rail 3 in described left side respectively, the fork heart 12 that is located at these wing rail 5 lower inside is formed, and establishes a guard rail 6 respectively in lower and straight track section 7 inboards and straight rail 8 inboards, right side of described wing rail about 5,11.
Wing rail 5 upstream ends in the described fork heart 12 outsides are connected with bend offset direction outside single track with described straight rail craspedodrome direction single track respectively, roll end away from along the fork heart 12 direction openings.
Described railway frog two path working edges are that heart rail two working edges intersect the formed angle of cut less than the right angle.
The radius of curvature of described bend section 4 is 30m.
Described frog length is 2450mm, and central body of frog is fixed on the big base plate.
The tongue that described tongue, straight rail, bend, guard rail, the fork heart 12, wing rail 5 are made by the 50kg/m rail, straight rail, bend, guard rail, the fork heart, wing rail.
The utility model has satisfied the narrow gauge railway transportation of newly-built mine and had the mine transportation now transforms the needs that adopt the corresponding narrow gauge railway track switch of 50kg/m rail.

Claims (6)

1, a kind of narrow gage single switch device, comprise stock rail, railway switch, railway frog and coupling part between the two, it is characterized in that described stock rail is made up of straight rail section-bend section-lower and straight track section on straight rail in right side and the left side, described railway switch is by the right side tongue that is located at the stock rail inboard, the left side tongue, the right side bend that is connected of right side tongue therewith, the straight rail in left side that tongue is connected is therewith formed, described railway frog is by the wing rail that is connected with the right side bend with the straight rail in described left side respectively, the fork heart that is located at this wing rail lower inside is formed, and lower and straight track section inboard and straight rail inboard, right side about described wing rail are established a guard rail respectively.
2, narrow gage single switch device according to claim 1 is characterized in that the wing rail upstream end in the described fork heart outside is connected with bend offset direction outside single track with described straight rail craspedodrome direction single track respectively, rolls end away from along fork heart direction opening.
3, narrow gage single switch device according to claim 1 is characterized in that described railway frog two path working edges are that heart rail two working edges intersect the formed angle of cut less than the right angle.
4, narrow gage single switch device according to claim 1, the radius of curvature that it is characterized in that described bend is 30m.
5, narrow gage single switch device according to claim 1 is characterized in that described frog length is 2450mm, and central body of frog is fixed on the big base plate.
6, narrow gage single switch device according to claim 1 is characterized in that tongue, straight rail, bend, guard rail, the fork heart, wing rail that described tongue, straight rail, bend, guard rail, the fork heart, wing rail are made by the 50kg/m rail.
CNU2008202197086U 2008-11-25 2008-11-25 Narrow gage single-opened switch device Expired - Fee Related CN201330354Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008202197086U CN201330354Y (en) 2008-11-25 2008-11-25 Narrow gage single-opened switch device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008202197086U CN201330354Y (en) 2008-11-25 2008-11-25 Narrow gage single-opened switch device

Publications (1)

Publication Number Publication Date
CN201330354Y true CN201330354Y (en) 2009-10-21

Family

ID=41223731

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008202197086U Expired - Fee Related CN201330354Y (en) 2008-11-25 2008-11-25 Narrow gage single-opened switch device

Country Status (1)

Country Link
CN (1) CN201330354Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106192610A (en) * 2016-07-12 2016-12-07 芜湖中铁科吉富轨道有限公司 Track three-throw turnout
CN106758565A (en) * 2016-12-31 2017-05-31 张伟 It is a kind of to multiply more formula railway frog and the railway switch with the railway frog
CN108677626A (en) * 2018-04-03 2018-10-19 中铁二院工程集团有限责任公司 A kind of rack rails covering steel-rail rail-road switch mechanism

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106192610A (en) * 2016-07-12 2016-12-07 芜湖中铁科吉富轨道有限公司 Track three-throw turnout
CN106758565A (en) * 2016-12-31 2017-05-31 张伟 It is a kind of to multiply more formula railway frog and the railway switch with the railway frog
CN106758565B (en) * 2016-12-31 2019-10-08 张伟 It is a kind of to multiply more formula railway frog and the railway switch with the railway frog
CN108677626A (en) * 2018-04-03 2018-10-19 中铁二院工程集团有限责任公司 A kind of rack rails covering steel-rail rail-road switch mechanism
CN108677626B (en) * 2018-04-03 2023-09-22 中铁二院工程集团有限责任公司 Rail switch mechanism covered by toothed rail

Similar Documents

Publication Publication Date Title
CN201330353Y (en) Narrow gage cross-over switch device
CN201305797Y (en) Narrow gauge symmetrical turnout device
CN103339011B (en) Conveying arrangement
CN201330355Y (en) Narrow gage rhombic switch device
CN110714445B (en) 1676mm and 1000mm double-track-pitch mantle line switch
CN201330354Y (en) Narrow gage single-opened switch device
CN201738196U (en) Novel crossover turnout
CN102322000A (en) Line rail symmetric three-throw turnout in urban rail traffic engineering
CN105369697B (en) A kind of three-throw turnout
CN102852055B (en) Single turnout for urban rail transit
CN108677626A (en) A kind of rack rails covering steel-rail rail-road switch mechanism
CN202247542U (en) Standard gauge and meter gauge dual-gauge rigid-frog gauge merging device
CN112176784B (en) Three-way set rail turnout of single point rail
CN201372394Y (en) Dual-gauge combined single turnout
CN208533272U (en) Novel urban rail turnout switch
CN111661071B (en) Island type platform structure of subway station with crossing crossover and construction method
CN201280673Y (en) Manganese steel active heart rail assembling frog
CN205223746U (en) Symmetrical three throw turnout
Bugarín et al. Geometry of high-speed turnouts
CN106758565A (en) It is a kind of to multiply more formula railway frog and the railway switch with the railway frog
CN203602971U (en) Semi-linear type split switch
CN1101501C (en) Frog for railway point
CN206887633U (en) A kind of grooved track trouble frog structure
CN208844368U (en) Tenon formula rail is without sound splice
CN206512527U (en) It is a kind of to multiply more formula railway frog and the railway switch with the railway frog

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 114031 Anshan District, Liaoning, No. 219 Road, No. 39, Tiedong

Patentee after: Anshan Iron and Steel Group Mining Co., Ltd.

Address before: 114031 Anshan District, Liaoning, No. 219 Road, No. 39, Tiedong

Patentee before: Anshan Iron & Steel Group Mining Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20091021

Termination date: 20171125