The utility model content
At the deficiency of existing injection boiler, the utility model technological invention people repeatedly tests and studies, and has proposed the novel fixed subcritical pressure pouring boiler furnace that a kind of suitable heavy crude heat extraction is used.
According to fixed subcritical pressure pouring boiler furnace of the present utility model, this fixed subcritical pressure pouring boiler furnace comprises boiler body and boiler accessory system; Boiler body is made up of radiant section, convection section, changeover portion, water-to-water heat exchanger, chimney and sled seat, and the boiler accessory system comprises vapour one water system, combustion system, sampling cooling system, automatic control system; The boiler integral installation is on the sled seat, and shell of radiation chamber is the cylindrical structure that is rolled the more piece assembly welding that forms by steel plate, the liner aluminosilicate refractory fiber; Convection section is positioned in the boiler back end ductwork, in be lined with the furnace lining identical with radiant section; Changeover portion is between radiant section and convection section; Radiant section tube bank in the radiant section is the seamless steel pipe of the high temperature high voltage resistant of 60 φ 89mm * 13mm, and with 180 ° of elbows these steel pipes is connected into tube bank, and tube bank is near furnace lining, back and forth arrangement.
Wherein, the sealing device at the import and export pipe place of radiant section is to compress asbestos cord, the heat-preservation cotton of jumping a queue outward in the sleeve pipe.
Preferably, the import top of changeover portion is that arc, bottom are semicircular structure.
Preferably, heating tube in section of convection chamber is divided into two kinds of finned tube and light pipes; In finned tube, 180 ° of elbows connect into tube bank trapezoidal, that multilayer is parallel, that back and forth arrange with finned tube, and per two rows adopt long radius cross-over connection elbow to connect; Light pipe is used for four layers in the convection section bottom, and the arrangement mode of convection current light pipe is the reciprocal solid matter of level, adopts short-radius bend to connect.
More preferably, radiant section and changeover portion heat-insulation layer adopt 2 layers of general fibre blanket, and lay one deck choke aluminium foil, and flame retardant coating is laid high-purity ceramic fiber folded piece, under lay lightening casting material in the scope; The whole lightening casting material of laying of convection section.
Adopt the boiler of said structure pattern, compact conformation, rationally distributed.By optimal design, improved boiler thermal output, reduced exhaust gas temperature, reduced the boiler manufacture difficulty, easy to maintenance, solved the defective that existing boiler exists, it is moved with security and stability, for providing efficiently, thermodynamic oil extraction process ensures.
The specific embodiment
Below in conjunction with accompanying drawing, the fixed subcritical pressure pouring boiler furnace that the utility model proposes is described in detail.
In Fig. 1 to Fig. 8, the parts that the mark among the figure is represented are as follows respectively:
1 chimney, 2 convection sections, 3 changeover portions, 4 radiant sections, 5 water-to-water heat exchangers, 6 burners, 7 air blasts, 8 switch boards, 9 air compressor machines, 10 supply-water pumps, 11 sled seats, 12 manhole doors, 13 peepholes, 14 every tube, 15 bolts, 16 general fibre felts, 17 choke aluminium foils, 18 high-purity ceramic fiber folded pieces.
Fixed subcritical pressure pouring boiler furnace of the present utility model comprises by boiler body and boiler accessory system two large divisions and forming.Boiler body is the major part of injection boiler, and it is made up of radiant section, convection section, changeover portion, water-to-water heat exchanger, chimney and sled seat etc.The boiler accessory system mainly contains vapour one water system, combustion system, sampling cooling system, automatic control system composition.The boiler integral installation is on the sled seat, and shell of radiation chamber is the cylindrical structure that is rolled the more piece assembly welding that forms by steel plate, the liner aluminosilicate refractory fiber.Convection section is positioned in the boiler back end ductwork, in be lined with the furnace lining identical with radiant section.Changeover portion is between radiant section and convection section.The radiant section tube bank is the seamless steel pipe of the high temperature high voltage resistant of 60 φ 89mm * 13mm, and these steel pipes are connected into tube bank with 180 ° of elbows, tube bank is back and forth arranged near furnace lining, wherein adding the hot water section, to select 55 root timber matter for use be the seamless steel pipe of φ 89mm * 13mm of 20G, and it is the seamless steel pipe of φ 89mm * 13mm of 15CrMoG that vaporizing zone is selected 5 root timber matter for use.
Wherein, the sealing device of radiant section import and export pipe adopts in the sleeve pipe and compresses asbestos cord, the process of the heat-preservation cotton of jumping a queue outward.Arc is adopted on changeover portion import top, and semicircular connected mode is adopted in the bottom.Heating tube in section of convection chamber is divided into two kinds of finned tube and light pipes, with 180 ° of elbows finned tube is connected into tube bank trapezoidal, that multilayer is parallel, that back and forth arrange, and per two rows adopt long radius cross-over connection elbows to connect, and are convenient to blow ash and maintenance.Light pipe is used for four layers in the convection section bottom, and the arrangement mode of convection current light pipe is the reciprocal solid matter of level, adopts short-radius bend to connect.
Additionally, radiant section and changeover portion heat-insulation layer adopt 2 layers of general fibre blanket, and lay one deck choke aluminium foil, and flame retardant coating is laid high-purity ceramic fiber folded piece, under lay lightening casting material in the scope; The whole lightening casting material of laying of convection section.
More specifically, be explained as follows:
By designing and calculating, determined the overall structure and the technological process of boiler, and, boiler has been carried out being optimized design in conjunction with the problem that the oil field The field is occurred, solved the different problems that existing boiler produces when operation.Its technical scheme is:
General structure and structural principle are as shown in fig. 1, this utility model is fixed subcritical pressure pouring boiler furnace, and this boiler comprises chimney 1, convection section 2, changeover portion 3, radiant section 4, water-to-water heat exchanger 5, burner 6, air blast 7, switch board 8, air compressor machine 9, supply-water pump 10 and some little devices.Boiler integral body is installed on the sled seat 11.Radiant section 4 is main heating surfaces of boiler, and convection section 2 is auxiliary heating surfaces of boiler, is arranged in the boiler back end ductwork, and changeover portion 3 is between convection section 2 and radiant section 4, and a semicircle flue gas that plays the connection effect turns to passage.
Please refer to Fig. 2, shell of radiation chamber is the cylindrical structure that is rolled the more piece assembly welding that forms by steel plate, and the liner aluminosilicate refractory fiber avoids furnace heat to loose outward with the protection shell of radiation chamber, to the boiler tube reflecting heat, reduces radiation loss.60 (seamless steel pipes of high temperature high voltage resistant of φ 89mm * 13mm) are arranged in the radiant section, wherein to select 5 root timber matter for use be the seamless steel pipe of 15CrMoG to vaporizing zone, through calculating, evaporation point is near these 5 pipes, these 5 pipes tube wall temperature in actual motion is too high, and booster is used 15CrMoG material pipe easily, can increase pipe intensity greatly, reduce the booster phenomenon.
Please refer to Fig. 3, Fig. 4, the sealing of radiant section gateway pipe and blow-off pipe is adopted in the sleeve and is compressed asbestos cord, the mode of the heat-preservation cotton of jumping a queue outward replaces original mode of welding plate sealing together, the heat-preservation cotton of jumping a queue on end plate, makes the gap location insulation tighter, prevents the flue gas leakage effectively.
Please refer to Fig. 5, Fig. 6, changeover portion convection section and radiant section between, a semicircle flue gas that plays the connection effect turns to passage.Housing is the arcuate structure that is rolled by steel plate, liner castable refractory and alumina silicate fibre.Because changeover portion with radiant section interface flue gas flow rate is big, heat flow density is big, often causes insulation material burning to take off, for overcoming this drawback, we adopt domes.
Please refer to Fig. 7, see that fiery device is positioned at the rear of changeover portion, original square being improved to every tube of seeing fiery device trapezoidally enlarged the visual field every tube 14, can not only observe the flame burning state, can also observe the situation of boiler tube combustion zone and vaporizing zone.Manhole door 12 after the improvement adopts bolt 15 to be connected with peephole 13, is convenient to install, dismantles and maintenance, and the long-term impact that has solved high-temperature flue gas easily causes the damage of fastener (screw thread).
Please refer to Fig. 8, Fig. 9, per two rows of convection section finned tube adopt long radius cross-over connection elbow to connect, and form tube bank trapezoidal, multilayer, parallel, that back and forth arrange.Light pipe is used for four layers in the convection section bottom, and the arrangement mode of convection current light pipe is improved by original stagger arrangement solid matter becomes the reciprocal solid matter of level, adopts short-radius bend to connect.Greatly reduce the welding difficulty, improved welding quality, be convenient to flaw detection, improved the weld bond qualification rate, and make the user easy to maintenance.Soldering opening for light pipe: by former whole be that to be optimized for major part be that the survivor of a murder attempt welds (be welded into and be similar to the walking stick pattern) to dead mouthful of welding of straight tube.
Please refer to Figure 10, radiant section and changeover portion heat-insulation layer adopt 2 layers of general fibre blanket 16, and lay one deck choke aluminium foil 17, and flame retardant coating is laid high-purity ceramic fiber folded piece 18, under lay the lightening casting material in the scope optimal design.And the whole lightening casting material of laying in the convection section.According to than the tiling heat preservation technology, this heat preservation technology can guarantee the boiler casing temperature less than 80 ℃, and has improved boiler evenly heat efficient.
In addition, although the clear in the above technical scheme that the utility model proposes that described in detail, but with reference to preferred embodiment of the present utility model, this area those skilled in the art be appreciated that, under the situation of the spirit and scope of the present utility model that do not deviate from the claims definition, can in form and details, make various modifications.Therefore, all should fall within the protection domain of the present utility model with reference to the various modifications that technical solutions of the utility model are made.