CN201326274Y - Through hole gap plugging film - Google Patents

Through hole gap plugging film Download PDF

Info

Publication number
CN201326274Y
CN201326274Y CNU200820214050XU CN200820214050U CN201326274Y CN 201326274 Y CN201326274 Y CN 201326274Y CN U200820214050X U CNU200820214050X U CN U200820214050XU CN 200820214050 U CN200820214050 U CN 200820214050U CN 201326274 Y CN201326274 Y CN 201326274Y
Authority
CN
China
Prior art keywords
slit
shutoff film
vestige
circular
auxiliary material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU200820214050XU
Other languages
Chinese (zh)
Inventor
岩崎辰之
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
AIBOKE CONSTRUCTION EQUIPMENT DESIGN (SHENZHEN) Co Ltd
Original Assignee
AIBOKE CONSTRUCTION EQUIPMENT DESIGN (SHENZHEN) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by AIBOKE CONSTRUCTION EQUIPMENT DESIGN (SHENZHEN) Co Ltd filed Critical AIBOKE CONSTRUCTION EQUIPMENT DESIGN (SHENZHEN) Co Ltd
Priority to CNU200820214050XU priority Critical patent/CN201326274Y/en
Application granted granted Critical
Publication of CN201326274Y publication Critical patent/CN201326274Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Protection Of Pipes Against Damage, Friction, And Corrosion (AREA)

Abstract

The utility model provides a through hole gap plugging film, which comprises an auxiliary material (15) which is coated with waterproof bond, wherein, the surface of the auxiliary material (15) is provided with a circular trace (21), and the diameter of the circular trace (21) is larger than the outer diameter of a tubing (13), and the internal area which is surrounded by the circular trace (21) is provided with a tubing adherence part (22), and an internal incision (24) is arranged between the tubing adherence parts (22); the gap plugging film is also provided with an outer incision (23), and the outer incision (23) is communicated with one of the internal incisions (24). The gap plugging film is used for filling the holes of the tubing, and reduces the aerial operation frequency, saves the work hours, saves the cost, improves the security, and has favorable tightness.

Description

Through hole slit shutoff film
Technical field
The utility model relates to a kind of finishing servicing unit of building, and particularly a kind of floor connects emptying aperture and fills the building servicing unit.
Background technology
Connect in the engineerings such as plumbing, air-conditioning, electric, coal gas floor pipeline around during the emptying aperture filling and repairing, traditional method is as follows:
Specifically describe with Fig. 1:
Pipe arrangement 33 connects floor 31 by connecting emptying aperture 32, can the space occur between pipe arrangement 33 and floor 31, for safety and attractive in appearance, need fill up the space that occurs.
Earlier plywood 34 according to one-tenth a certain size, big wisp plywood 34 according to pipe arrangement 33 is split into needed bore, when pipe arrangement 33 pass from the perforation emptying aperture 32 of floor fixing after, plywood 34 is withstood on the bottom of floor 31, for fixing plywood 34 usefulness bracing frames 35 withstand, because the inhomogeneities of floor 31 and plywood 34 is rigid, cause plywood 34 closely to gather with floor 31, after the concrete mortar 36 that is used for repairing is poured into floor perforation emptying aperture 32, the part of concrete mortar 36 and moisture will flow into space 37 along the space, 38, plywood 34 sticks together with regard to easy and concrete mortar 36, brings great trouble for the dismounting of plywood 34.
In addition because the hardness problem of plywood 34, make plywood 34 can't with floor 31 close adhesion, in conjunction with imperfect, defective, leak will appear, passage is provided for the gas leakage of leaking.
Since 34 openings of plywood footpath size be greater than the bore of pipe arrangement 33, will inevitably between pipeline 33 and plywood 34 space appear, concrete mortar 36 can flow down along the space, stays on the pipe arrangement 33, and is not attractive in appearance, makes troubles to cleaning.
This way needs two talents to finish, and wastes man-hour.The dismounting of plywood increases the work high above the ground frequency, reduces safety.Also have, the processing plywood need be spent a lot of times.
The utility model content
In order to overcome above-mentioned the deficiencies in the prior art, the utility model provides a kind of through hole slit shutoff film.
The technical scheme that its technical problem that solves the utility model adopts is: a kind of through hole slit shutoff film, this slit shutoff film comprises and scribbles the water-resistant adhesives auxiliary material, described auxiliary material surface is provided with circular vestige, the diameter of this circle vestige is bigger slightly than the external diameter of pipe arrangement, the interior zone that described circular vestige surrounded is provided with the pipe arrangement paste section, described pipe arrangement is provided with internal incision between the paste section, this slit shutoff film also is provided with an external undercut, and described external undercut communicates with one of them internal incision.
The scheme that the utility model solves further technical problem is: the one side that described auxiliary material scribble water-resistant adhesives is provided with topping.
The scheme that the utility model solves further technical problem is: described topping is release liners or mould release membrance.
The scheme that the utility model solves further technical problem is: the one side that described auxiliary material are not provided with topping is provided with fid, and the surface of described fid is provided with same auxiliary material.
The scheme that the utility model solves further technical problem is: the circular vestige inside center of described slit shutoff film is provided with a round otch.
The scheme that the utility model solves further technical problem is: the distribution situation of described pipe arrangement paste section is: evenly distribute eight.
The scheme that the utility model solves further technical problem is: described circular vestige is two or more concentric circles vestiges.
The scheme that the utility model solves further technical problem is: when described circular concentric vestige is three or three when above, described internal incision length is less than the radius of the circular concentric vestige of maximum.
Compared to prior art, through hole of the present utility model slit shutoff film does not need to remove, and has removed and has removed the trouble that board brings.The auxiliary material in intermediate layer closely contact with floor with pipe arrangement by water-resistant adhesives with the fid of lower floor, can not stay the space concrete mortar is flowed down along the space.The filling that utilizes through hole of the present utility model slit shutoff film to carry out space between floor and the pipe arrangement only needs one man operation to get final product, and has saved man-hour.
Description of drawings
Fig. 1 is the job practices simplified schematic diagram of filling up floor and pipe arrangement space of prior art.
Fig. 2 is the job practices simplified schematic diagram that through hole of the present utility model slit shutoff film is filled up floor and pipe arrangement space.
Fig. 3 is the front view of through hole of the present utility model slit shutoff film.
Fig. 4 is that first of through hole of the present utility model slit shutoff film is expanded front view.
Fig. 5 is that first of through hole of the present utility model slit shutoff film is expanded back elevation.
Fig. 6 is that second of through hole of the present utility model slit shutoff film is expanded front view.
Fig. 7 is that second of through hole of the present utility model slit shutoff film is expanded back elevation.
Fig. 8 is that the 3rd of through hole of the present utility model slit shutoff film is expanded front view.
Fig. 9 is that the 4th of through hole of the present utility model slit shutoff film is expanded front view.
The specific embodiment
Following content be in conjunction with concrete preferred implementation to further describing that the utility model is done, can not assert that concrete enforcement of the present utility model is confined to these explanations.For the utility model person of an ordinary skill in the technical field, under the prerequisite that does not break away from the utility model design, can also make some simple deduction or replace, all should be considered as belonging to protection domain of the present utility model.
Through hole of the present utility model slit shutoff film is formed by three layers, and the intermediate layer is auxiliary material 15, and the upper strata is a topping, and lower floor is a fid 16, scribble on the auxiliary material 15 can be bonding with cement floor water-resistant adhesives.The shape of the periphery of this trilaminate material is generally square, also can select circular vestige, rectangle or other generic graphic.Described topping is selected release liners or mould release membrance for use, and release liners is commonly called as silicone oil paper, perhaps separate paper.The auxiliary material in described intermediate layer so long as material that can be crooked, folded can, can be foam films, perhaps cloth, paper, plastics or the like.The fid of described lower floor can use aluminium foil, also can adopt asbestos material to replace.Consider preferred the use as similar nonflammable materials such as aluminium foils from fireproof performance.
Rolling in the centre of fid has circular vestige 21, preferred two or more concentric circles vestige, can be a plurality of concentric circles vestiges, the circular vestige that is rolled does not roll fid yet, the diameter of circular vestige and the external diameter of existing pipe arrangement matches and bigger slightly than the external diameter of existing pipe arrangement.
Choose two or more diameter of circular vestige, and the diameter of being got distributes symmetrically, three layers along institute cut-off footpath with described slit shutoff film are rolled, with formation internal incision 24 and pipe arrangement paste section 22.And from diameter, appoint and get a radius, roll from the center to the edge along this radial direction three layers, with formation external undercut 23 this slit shutoff film.
When described concentric circles vestige was two or more, preferred three, the institute's cut-off directly diameter than maximum concentric circles vestige was little.Because when diameter of a circle is big, area around circular will reduce accordingly, the pressure that circular peripheral part unit area is born will increase, if the diameter vestige that is shut out is littler than the diameter of maximum concentric circles vestige, can help to bear a part of pressure.
Be provided with a roundlet at the circular vestige of slit shutoff film center, along this roundlet three layers rolled, to form round otch 25, form the lobe shape and structure between circular vestige 21 and the circle otch 25, described lobe shape and structure is a triangle, and is trapezoidal or fan-shaped, is preferably 1/8th or the sixth annulus.
Below in conjunction with Fig. 2 job practices of the present utility model is explained:
For the coal gas that connects levels or adjacent room is installed; water pipe; the pipe arrangement 13 of electric grade; on floor 11, be equipped with emptying aperture 12; at first tear the topping above the auxiliary material 15; open the breach of slit shutoff film; (this breach be described get radial direction three layers of this slit shutoff film are rolled formed breach from the center to the edge) along a certain with slit shutoff Membrane cover on the pipe arrangement 13 that connects floor 11; being coated with the bottom that the one side that is brushed with water-resistant adhesives clings to floor 11; the lobe shape structure that is coated with the auxiliary material 15 that are brushed with water-resistant adhesives is clung on the pipe arrangement 13; the periphery of auxiliary material 15 and floor 11 are close to; like this, the bottom of the perforation emptying aperture 12 of floor 11 is just by complete closed.
Water mending concrete mortar 14 from the top of floor 11 then, because the bottom by complete closed, so concrete mortar just can not be dirty along the space, reaches the effect of filling.
The way of water-resistant adhesives does not have ad hoc fashion, but water-resistant adhesives must be to have strong bonding force, its kind must be the glue that can be close to concrete usually, when the filling and repairing concrete mortar, can not cause glue to separate because containing moisture, the adhesive of rubber-type, the gum-type adhesive also can use.
Be provided with a roundlet at the circular vestige of slit shutoff film center, three layers rolled,, form the lobe shape and structure between circular vestige 21 and the circle otch 25, according to the pipe arrangement caliber size, prefabricated the finishing of elder generation of factory to form round otch 25 along this roundlet.The roundlet roll mark is set in the centre, makes fan-shaped part become 1/8th circular ring structures, be convenient to their separation.
The auxiliary material 15 that the utility model uses have characteristics folding, good bending property, can with the concrete floor close adhesion, moisture is leakiness not, the concrete mortar of repairing is attractive in appearance; Also have, fire proofing materials such as the aluminium foil that uses in the fid 16, asbestos for the place that the requirement of fire prevention benchmark is arranged, have very significantly reasonability; This slit shutoff film is provided with otch, is installed on the pipe arrangement very convenient.
The utlity model has good closure, the deficiency of filling for the pipe arrangement emptying aperture, defective and going up downstairs of causing, the gas poisoning between the neighbours is leaked, and fire spread, noise or the like have the effect of preventing.
The utility model does not need dismounting, reduces the work high above the ground frequency, improves safety.Be that a kind of emptying aperture very easily seals patching material.

Claims (9)

1. through hole slit shutoff film, it is characterized in that: this slit shutoff film comprises the auxiliary material (15) that scribble water-resistant adhesives, described auxiliary material (15) surface is provided with circular vestige (21), the diameter of this circle vestige (21) is bigger slightly than the external diameter of pipe arrangement (13), the interior zone that described circular vestige (21) is surrounded is provided with pipe arrangement paste section (22), be provided with internal incision (24) between the described pipe arrangement paste section (22), this slit shutoff film also is provided with an external undercut (23), and described external undercut (23) communicates with one of them internal incision (24).
2. shutoff film in slit according to claim 1 is characterized in that: the one side that described auxiliary material (15) scribble water-resistant adhesives is provided with topping, and described topping is release liners or mould release membrance.
3. shutoff film in slit according to claim 2 is characterized in that: the one side that described auxiliary material (15) are not provided with topping is provided with fid (16), and the surface of described fid (16) is provided with same auxiliary material (15).
4. shutoff film in slit according to claim 1 is characterized in that: circular vestige (21) inside center of described slit shutoff film is provided with a round otch (25).
5. shutoff film in slit according to claim 2 is characterized in that: circular vestige (21) inside center of described slit shutoff film is provided with a round otch (25).
6. shutoff film in slit according to claim 3 is characterized in that: circular vestige (21) inside center of described slit shutoff film is provided with a round otch (25).
7. according to any one the described slit shutoff film in the claim 1 to 6, it is characterized in that: the distribution situation of described pipe arrangement paste section (22) is: evenly distribute eight.
8. shutoff film in slit according to claim 7 is characterized in that: described circular vestige is two or more concentric circles vestiges.
9. shutoff film in slit according to claim 8 is characterized in that: when described circular concentric vestige is three or three when above, described internal incision (24) length is less than the radius of the circular concentric vestige of maximum.
CNU200820214050XU 2008-11-28 2008-11-28 Through hole gap plugging film Expired - Lifetime CN201326274Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU200820214050XU CN201326274Y (en) 2008-11-28 2008-11-28 Through hole gap plugging film

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU200820214050XU CN201326274Y (en) 2008-11-28 2008-11-28 Through hole gap plugging film

Publications (1)

Publication Number Publication Date
CN201326274Y true CN201326274Y (en) 2009-10-14

Family

ID=41178247

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU200820214050XU Expired - Lifetime CN201326274Y (en) 2008-11-28 2008-11-28 Through hole gap plugging film

Country Status (1)

Country Link
CN (1) CN201326274Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102936954A (en) * 2012-11-28 2013-02-20 深圳市鹏城建筑集团有限公司 Method and structure for plugging pipeline floor hole

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102936954A (en) * 2012-11-28 2013-02-20 深圳市鹏城建筑集团有限公司 Method and structure for plugging pipeline floor hole

Similar Documents

Publication Publication Date Title
CN106120873B (en) A kind of construction method of pile-raft foundation pre-installed and inverted adhered composite high-molecular waterproof roll
CN101914927B (en) Waterproof system for basement bottom board and wall surface and construction method thereof
CN201326274Y (en) Through hole gap plugging film
KR200405387Y1 (en) Waterproof sheet using glass fiber of meshand
CN111473165A (en) Waterproof structure of superimposed sheet and PVC water piping connection department
CN206971581U (en) A kind of water-proofing treatment system of joint of plate perforating pipe position
CN106381936B (en) A kind of wall water hole water proof structure and construction method
KR101951798B1 (en) Eco-friendly composite waterproofing method
CN206708563U (en) A kind of water proof structure of Pipeline Crossing Program floor
CN107419857A (en) Built-up roofing Durchgangshohle node and its construction method
CN109319320A (en) Steel oil tank inner lining structure and liner reforming technology
CN208803496U (en) A kind of car ramp and basement main body handover seam node structure
CN101591916A (en) There is not back cover concrete casing construction water shutoff capsule under water
CN113775197A (en) Construction method for plugging and preventing leakage of concrete outer wall through-wall bolt hole
CN209741929U (en) Continuous wall encircles to construction joint waterproof construction
CN212174867U (en) Polyurethane waterproofing membrane
CN110905137B (en) Stifled formula waterproof system that draws
CN208805325U (en) A kind of watertight test system at piping lane straight cut
CN113236870A (en) Seepage-proofing construction process for valve well
CN207244872U (en) A kind of basement high building and annex intersection roof deformation crack structure
CN206784434U (en) A kind of basement waterproofing drainage structure
CN207110081U (en) Buildings waterproof standard component
CN205935523U (en) Leak protection structure of bathroom floor seepage maintenance
CN205975704U (en) Basement wall structure
CN215889437U (en) Concrete outer wall through-wall bolt hole plugging and anti-seepage construction structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: 518000, Guangdong, Shenzhen, Baoan District Xixiang Avenue and Qianjin Road intersection, Bao Yun Da logistics information building 14 layer

Patentee after: Aiboke Construction Equipment Design (Shenzhen) Co., Ltd.

Address before: 518000, Guangdong, Shenzhen, Baoan District, Xixiang street, the Peach Garden science and Technology Innovation Park B building 4 hatch room

Patentee before: Aiboke Construction Equipment Design (Shenzhen) Co., Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20091014