CN201323405Y - Conducting wire preformed armour rod solder strip clamp - Google Patents
Conducting wire preformed armour rod solder strip clamp Download PDFInfo
- Publication number
- CN201323405Y CN201323405Y CNU2008201642918U CN200820164291U CN201323405Y CN 201323405 Y CN201323405 Y CN 201323405Y CN U2008201642918 U CNU2008201642918 U CN U2008201642918U CN 200820164291 U CN200820164291 U CN 200820164291U CN 201323405 Y CN201323405 Y CN 201323405Y
- Authority
- CN
- China
- Prior art keywords
- circular hole
- flunked
- time courses
- studied
- preformed armor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Instructional Devices (AREA)
Abstract
The utility model provides a conducting wire performed armour rod solder strip clamp, which comprises two pressure boards. The two pressure boards are connected through hinges arranged at one ends of the pressure boards, the other ends of the pressure boards are provided with hasps, each of the two pressure boards is provided with an upper semicircle hole and a lower semicircle hole, after the two pressure boards being closed, two semicircle holes approaching each other forms a circle, an upper circle hole is provided with two separable moulds applied to cutting, a lower circle hole is provided with two separable moulds applied to clamping, and both the two kinds of moulds can be replaced by corresponding moulds according to different model numbers of conducting wires. Simple in structure, the utility model can rapidly demount and install conducting wire preformed armour rod solder strips in various standard model numbers, thereby achieving good solder technology, orderly ends, even and decorative intervals between solder strips. In addition, compared with traditional operation method, operation time is massively decreased.
Description
Technical field
The utility model relates to a kind of lead preformed armor rods and studies for a second time courses one has flunked the bar jig, belongs to lead and studies for a second time courses one has flunked power tool class field.
Background technology
Along with the develop rapidly of State Grid's construction, the 110Kv-500kV transmission line length is growing.The develop rapidly of transmission line area coverage, the also corresponding development of urban construction, the outside destroy incident happens occasionally, and causes transmission line impaired, and lead is injured.Accident maintenance and high-quality are repaired corresponding the increasing of lead work, and how fast and high quality is finished conducting wire mending work becomes major issue in the industry.Present charged studying for a second time courses one has flunked in the lead operation, ubiquity shortcomings such as operating time length, processing quality difference.How to shorten the operating time, improve processing quality and finish transmission line wire quickly and easily and study for a second time courses one has flunked the instrument development of operation and become a current problem.
The utility model content
The purpose of this utility model is to overcome the deficiency of above-mentioned existence, and provides the lead preformed armor rods that a kind of operating time is short, processing quality is high to study for a second time courses one has flunked the bar jig.
The utility model is finished by following technical solution: a kind of lead preformed armor rods is studied for a second time courses one has flunked the bar jig, comprises two block pressur plates, and described two block pressur plates connect by the hinge of establishing at one end, and the other end of pressing plate is provided with hasp; All offer upper and lower two semicircle orifices on described two block pressur plates, mutual two close semicircle orifices constitute a circular hole after the two block pressur plate closures; Discerptible two cutting moulds are equipped with at the described circular hole place of going up, and discerptible two clamping moulds are equipped with at following circular hole place, and above-mentioned two kinds of moulds all can be replaced by the mould that adapts according to the difference of wire type.
An auxiliary device that tightens all is equipped with both sides at described upper and lower circular hole place, and this is auxiliary to tighten device and comprise screw and screw bar, and this is auxiliary to tighten lead that device is used for that the circular hole place is clamped and further add and fasten.
Tape measure is equipped with in the described circular hole outside, is used to measure study for a second time courses one has flunked bar mounting center point.
One termination of described down circular hole is the circular hole that a diameter enlarges, and this reaming can be studied for a second time courses one has flunked bar with preformed armor rods, and that diameter is installed is identical, and the degree of depth is 5 to 10 millimeters, and can locate every preformed armor rods and study for a second time courses one has flunked bar.
Blade is equipped with in a described end of going up circular hole, and knife number can be studied for a second time courses one has flunked the adjustment of bar number of share of stock according to preformed armor rods.
Described two block pressur plates form by high-strength nylon materials processing.
The beneficial effects of the utility model are: project organization is simple, can study for a second time courses one has flunked bar with the lead preformed armor rods that various standard models are installed by fast quick-detach, and repair technology is good, and the termination is neat, and it is evenly attractive in appearance to study for a second time courses one has flunked the bar mutual spacing; Activity duration is compared with former traditional operation mode and significantly reduces.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
Fig. 2 is the rearview of Fig. 1.
Fig. 3 is the schematic diagram of the blade in the utility model.
Embodiment
Below in conjunction with accompanying drawing the utility model is described in detail.
Referring to Fig. 1, Fig. 2 and Fig. 3, the lead preformed armor rods is studied for a second time courses one has flunked the bar jig, comprises two block pressur plates, and described two block pressur plates connect by the hinge of establishing at one end 4, and the other end of pressing plate is provided with hasp 3; All offer upper and lower two semicircle orifices on described two block pressur plates, mutual two close semicircle orifices constitute a circular hole after the two block pressur plate closures; Discerptible two cuttings mould 1 is equipped with at the described circular hole place of going up, and discerptible two clampings mould 2 is equipped with at following circular hole place; A described termination of circular hole down is the circular hole that a diameter enlarges, and the circular hole degree of depth of this enlarged-diameter is 5 to 10 millimeters; Blade 7 is equipped with in a described end of going up circular hole; The one auxiliary device 5 that tightens all is housed in both sides, upper and lower circular hole place, and this is auxiliary to tighten device and comprises screw and screw bar; Tape measure 6 is equipped with in the circular hole outside; Described two block pressur plates form by high-strength nylon materials processing.
The utility model is when concrete the use, the operating personnel can enter the conducting wire mending setting by rope ladder or hard ladder, load onto the lead preformed armor rods and study for a second time courses one has flunked the cutting mould 1 at the last circular hole place of bar jig, blade 7 is aimed at the preformed armor rods that needs to dismantle study for a second time courses one has flunked the bar termination, to the termination direction exert oneself push-tight and and preformed armor rods study for a second time courses one has flunked bar around to reverse rotation, fast a whole set of preformed armor rods being studied for a second time courses one has flunked bar changes pine, takes off old preformed armor rods with hand continuation rotation and studies for a second time courses one has flunked bar, and dismantlement work is finished.
When new preformed armor rods need being installed studying for a second time courses one has flunked bar, with lead need repair handle clean, leveling after, the tape measure 6 of studying for a second time courses one has flunked the bar jig with the lead preformed armor rods is measured and is repaired dot center, loads onto the clamping mould 2 that the lead preformed armor rods is studied for a second time courses one has flunked the following circular hole place of bar jig, holding clamp.A whole set of lead preformed armor rods is studied for a second time courses one has flunked bar be wrapped on the lead, arrangement is inserted into behind Shunping County and clamps with in the mould 2, firmly compresses and studies for a second time courses one has flunked bar around to rotation along the lead preformed armor rods to the hole direction.Take off jig, installation lead preformed armor rods is studied for a second time courses one has flunked bar work and is finished.
Claims (7)
1, the lead preformed armor rods is studied for a second time courses one has flunked the bar jig, it is characterized in that it comprises two block pressur plates, and described two block pressur plates connect by the hinge of establishing at one end (4), and the other end of pressing plate is provided with hasp (3); All offer upper and lower two semicircle orifices on described two block pressur plates, mutual two close semicircle orifices constitute a circular hole after the two block pressur plate closures; Discerptible two cuttings mould (1) is equipped with at the described circular hole place of going up, and discerptible two clampings mould (2) is equipped with at following circular hole place.
2, lead preformed armor rods according to claim 1 is studied for a second time courses one has flunked the bar jig, it is characterized in that both sides, described upper and lower circular hole place all are equipped with an auxiliary device (5) that tightens, and this is auxiliary to tighten device and comprise screw and screw bar.
3, lead preformed armor rods according to claim 1 is studied for a second time courses one has flunked the bar jig, it is characterized in that outside the described circular hole tape measure (6) being housed.
4, lead preformed armor rods according to claim 1 and 2 is studied for a second time courses one has flunked the bar jig, it is characterized in that a described termination of circular hole down is the circular hole that a diameter enlarges.
5, lead preformed armor rods according to claim 4 is studied for a second time courses one has flunked the bar jig, and the circular hole degree of depth that it is characterized in that described enlarged-diameter is 5 to 10 millimeters.
6, lead preformed armor rods according to claim 1 and 2 is studied for a second time courses one has flunked the bar jig, it is characterized in that blade (7) is equipped with in an end of described last circular hole.
7, lead preformed armor rods according to claim 1 is studied for a second time courses one has flunked the bar jig, it is characterized in that described two block pressur plates form by high-strength nylon materials processing.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008201642918U CN201323405Y (en) | 2008-09-17 | 2008-09-17 | Conducting wire preformed armour rod solder strip clamp |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008201642918U CN201323405Y (en) | 2008-09-17 | 2008-09-17 | Conducting wire preformed armour rod solder strip clamp |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201323405Y true CN201323405Y (en) | 2009-10-07 |
Family
ID=41160777
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2008201642918U Expired - Fee Related CN201323405Y (en) | 2008-09-17 | 2008-09-17 | Conducting wire preformed armour rod solder strip clamp |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201323405Y (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103022936A (en) * | 2012-11-20 | 2013-04-03 | 山西省电力公司阳泉供电公司 | Preformed armor rod twined assist device |
CN112968412A (en) * | 2021-03-22 | 2021-06-15 | 国网河南省电力公司许昌供电公司 | All-insulation phase color preformed armor rod |
-
2008
- 2008-09-17 CN CNU2008201642918U patent/CN201323405Y/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103022936A (en) * | 2012-11-20 | 2013-04-03 | 山西省电力公司阳泉供电公司 | Preformed armor rod twined assist device |
CN112968412A (en) * | 2021-03-22 | 2021-06-15 | 国网河南省电力公司许昌供电公司 | All-insulation phase color preformed armor rod |
CN112968412B (en) * | 2021-03-22 | 2022-07-29 | 国网河南省电力公司许昌供电公司 | All-insulation phase color preformed armor rod |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203626366U (en) | Bracing wire back binding fastening tool | |
CN201323405Y (en) | Conducting wire preformed armour rod solder strip clamp | |
CN209981482U (en) | Self-locking type grounding wire clamp | |
CN203091806U (en) | Drill jig working platform of cross-beam tube of engine supporting beam | |
CN202333527U (en) | Portable multipurpose electric construction tool | |
CN202162411U (en) | Portable hand bench drill | |
CN201685197U (en) | Manual tongs for shearing and clamping | |
CN201118146Y (en) | Clamp type hot-line work fixture | |
CN206794455U (en) | Copper bar bending device | |
CN201889378U (en) | Cutting machine for steel strand | |
CN205846603U (en) | A kind of cable stripping cable pincers | |
CN214321919U (en) | Drilling equipment is used in iron fence processing | |
CN204954773U (en) | Portable multi -purpose construction tool | |
CN211351017U (en) | A auxiliary fixtures for parallel groove clamp installation | |
CN104369133B (en) | A kind of wire harness plug test fixed jig | |
CN206869392U (en) | Girder steel connection end aligns welding tooling | |
CN211027910U (en) | Tension spring bending tool | |
CN201740699U (en) | Clamp special for tensile machine | |
CN205057376U (en) | A fixing device for steel wire butt welding | |
CN210350612U (en) | A quick assembly disassembly instrument for quadripartion conductor spacer | |
CN217571818U (en) | Portable fixing clamp | |
CN206382547U (en) | Dead head positioning-cutting device | |
CN206124024U (en) | Rubber is PLC screw rod automatic demoulding device for product | |
CN216489429U (en) | Special wire clamping tool for insulated wire | |
CN215817245U (en) | Power supply and utilization power transmission and distribution line tightening device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20091007 Termination date: 20100917 |