CN201323405Y - Conducting wire preformed armour rod solder strip clamp - Google Patents

Conducting wire preformed armour rod solder strip clamp Download PDF

Info

Publication number
CN201323405Y
CN201323405Y CNU2008201642918U CN200820164291U CN201323405Y CN 201323405 Y CN201323405 Y CN 201323405Y CN U2008201642918 U CNU2008201642918 U CN U2008201642918U CN 200820164291 U CN200820164291 U CN 200820164291U CN 201323405 Y CN201323405 Y CN 201323405Y
Authority
CN
China
Prior art keywords
circular hole
flunked
time courses
studied
preformed armor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008201642918U
Other languages
Chinese (zh)
Inventor
孙云峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiaxing Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
Jiaxing Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiaxing Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical Jiaxing Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority to CNU2008201642918U priority Critical patent/CN201323405Y/en
Application granted granted Critical
Publication of CN201323405Y publication Critical patent/CN201323405Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Instructional Devices (AREA)

Abstract

The utility model provides a conducting wire performed armour rod solder strip clamp, which comprises two pressure boards. The two pressure boards are connected through hinges arranged at one ends of the pressure boards, the other ends of the pressure boards are provided with hasps, each of the two pressure boards is provided with an upper semicircle hole and a lower semicircle hole, after the two pressure boards being closed, two semicircle holes approaching each other forms a circle, an upper circle hole is provided with two separable moulds applied to cutting, a lower circle hole is provided with two separable moulds applied to clamping, and both the two kinds of moulds can be replaced by corresponding moulds according to different model numbers of conducting wires. Simple in structure, the utility model can rapidly demount and install conducting wire preformed armour rod solder strips in various standard model numbers, thereby achieving good solder technology, orderly ends, even and decorative intervals between solder strips. In addition, compared with traditional operation method, operation time is massively decreased.

Description

The lead preformed armor rods is studied for a second time courses one has flunked the bar jig
Technical field
The utility model relates to a kind of lead preformed armor rods and studies for a second time courses one has flunked the bar jig, belongs to lead and studies for a second time courses one has flunked power tool class field.
Background technology
Along with the develop rapidly of State Grid's construction, the 110Kv-500kV transmission line length is growing.The develop rapidly of transmission line area coverage, the also corresponding development of urban construction, the outside destroy incident happens occasionally, and causes transmission line impaired, and lead is injured.Accident maintenance and high-quality are repaired corresponding the increasing of lead work, and how fast and high quality is finished conducting wire mending work becomes major issue in the industry.Present charged studying for a second time courses one has flunked in the lead operation, ubiquity shortcomings such as operating time length, processing quality difference.How to shorten the operating time, improve processing quality and finish transmission line wire quickly and easily and study for a second time courses one has flunked the instrument development of operation and become a current problem.
The utility model content
The purpose of this utility model is to overcome the deficiency of above-mentioned existence, and provides the lead preformed armor rods that a kind of operating time is short, processing quality is high to study for a second time courses one has flunked the bar jig.
The utility model is finished by following technical solution: a kind of lead preformed armor rods is studied for a second time courses one has flunked the bar jig, comprises two block pressur plates, and described two block pressur plates connect by the hinge of establishing at one end, and the other end of pressing plate is provided with hasp; All offer upper and lower two semicircle orifices on described two block pressur plates, mutual two close semicircle orifices constitute a circular hole after the two block pressur plate closures; Discerptible two cutting moulds are equipped with at the described circular hole place of going up, and discerptible two clamping moulds are equipped with at following circular hole place, and above-mentioned two kinds of moulds all can be replaced by the mould that adapts according to the difference of wire type.
An auxiliary device that tightens all is equipped with both sides at described upper and lower circular hole place, and this is auxiliary to tighten device and comprise screw and screw bar, and this is auxiliary to tighten lead that device is used for that the circular hole place is clamped and further add and fasten.
Tape measure is equipped with in the described circular hole outside, is used to measure study for a second time courses one has flunked bar mounting center point.
One termination of described down circular hole is the circular hole that a diameter enlarges, and this reaming can be studied for a second time courses one has flunked bar with preformed armor rods, and that diameter is installed is identical, and the degree of depth is 5 to 10 millimeters, and can locate every preformed armor rods and study for a second time courses one has flunked bar.
Blade is equipped with in a described end of going up circular hole, and knife number can be studied for a second time courses one has flunked the adjustment of bar number of share of stock according to preformed armor rods.
Described two block pressur plates form by high-strength nylon materials processing.
The beneficial effects of the utility model are: project organization is simple, can study for a second time courses one has flunked bar with the lead preformed armor rods that various standard models are installed by fast quick-detach, and repair technology is good, and the termination is neat, and it is evenly attractive in appearance to study for a second time courses one has flunked the bar mutual spacing; Activity duration is compared with former traditional operation mode and significantly reduces.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
Fig. 2 is the rearview of Fig. 1.
Fig. 3 is the schematic diagram of the blade in the utility model.
Embodiment
Below in conjunction with accompanying drawing the utility model is described in detail.
Referring to Fig. 1, Fig. 2 and Fig. 3, the lead preformed armor rods is studied for a second time courses one has flunked the bar jig, comprises two block pressur plates, and described two block pressur plates connect by the hinge of establishing at one end 4, and the other end of pressing plate is provided with hasp 3; All offer upper and lower two semicircle orifices on described two block pressur plates, mutual two close semicircle orifices constitute a circular hole after the two block pressur plate closures; Discerptible two cuttings mould 1 is equipped with at the described circular hole place of going up, and discerptible two clampings mould 2 is equipped with at following circular hole place; A described termination of circular hole down is the circular hole that a diameter enlarges, and the circular hole degree of depth of this enlarged-diameter is 5 to 10 millimeters; Blade 7 is equipped with in a described end of going up circular hole; The one auxiliary device 5 that tightens all is housed in both sides, upper and lower circular hole place, and this is auxiliary to tighten device and comprises screw and screw bar; Tape measure 6 is equipped with in the circular hole outside; Described two block pressur plates form by high-strength nylon materials processing.
The utility model is when concrete the use, the operating personnel can enter the conducting wire mending setting by rope ladder or hard ladder, load onto the lead preformed armor rods and study for a second time courses one has flunked the cutting mould 1 at the last circular hole place of bar jig, blade 7 is aimed at the preformed armor rods that needs to dismantle study for a second time courses one has flunked the bar termination, to the termination direction exert oneself push-tight and and preformed armor rods study for a second time courses one has flunked bar around to reverse rotation, fast a whole set of preformed armor rods being studied for a second time courses one has flunked bar changes pine, takes off old preformed armor rods with hand continuation rotation and studies for a second time courses one has flunked bar, and dismantlement work is finished.
When new preformed armor rods need being installed studying for a second time courses one has flunked bar, with lead need repair handle clean, leveling after, the tape measure 6 of studying for a second time courses one has flunked the bar jig with the lead preformed armor rods is measured and is repaired dot center, loads onto the clamping mould 2 that the lead preformed armor rods is studied for a second time courses one has flunked the following circular hole place of bar jig, holding clamp.A whole set of lead preformed armor rods is studied for a second time courses one has flunked bar be wrapped on the lead, arrangement is inserted into behind Shunping County and clamps with in the mould 2, firmly compresses and studies for a second time courses one has flunked bar around to rotation along the lead preformed armor rods to the hole direction.Take off jig, installation lead preformed armor rods is studied for a second time courses one has flunked bar work and is finished.

Claims (7)

1, the lead preformed armor rods is studied for a second time courses one has flunked the bar jig, it is characterized in that it comprises two block pressur plates, and described two block pressur plates connect by the hinge of establishing at one end (4), and the other end of pressing plate is provided with hasp (3); All offer upper and lower two semicircle orifices on described two block pressur plates, mutual two close semicircle orifices constitute a circular hole after the two block pressur plate closures; Discerptible two cuttings mould (1) is equipped with at the described circular hole place of going up, and discerptible two clampings mould (2) is equipped with at following circular hole place.
2, lead preformed armor rods according to claim 1 is studied for a second time courses one has flunked the bar jig, it is characterized in that both sides, described upper and lower circular hole place all are equipped with an auxiliary device (5) that tightens, and this is auxiliary to tighten device and comprise screw and screw bar.
3, lead preformed armor rods according to claim 1 is studied for a second time courses one has flunked the bar jig, it is characterized in that outside the described circular hole tape measure (6) being housed.
4, lead preformed armor rods according to claim 1 and 2 is studied for a second time courses one has flunked the bar jig, it is characterized in that a described termination of circular hole down is the circular hole that a diameter enlarges.
5, lead preformed armor rods according to claim 4 is studied for a second time courses one has flunked the bar jig, and the circular hole degree of depth that it is characterized in that described enlarged-diameter is 5 to 10 millimeters.
6, lead preformed armor rods according to claim 1 and 2 is studied for a second time courses one has flunked the bar jig, it is characterized in that blade (7) is equipped with in an end of described last circular hole.
7, lead preformed armor rods according to claim 1 is studied for a second time courses one has flunked the bar jig, it is characterized in that described two block pressur plates form by high-strength nylon materials processing.
CNU2008201642918U 2008-09-17 2008-09-17 Conducting wire preformed armour rod solder strip clamp Expired - Fee Related CN201323405Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008201642918U CN201323405Y (en) 2008-09-17 2008-09-17 Conducting wire preformed armour rod solder strip clamp

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008201642918U CN201323405Y (en) 2008-09-17 2008-09-17 Conducting wire preformed armour rod solder strip clamp

Publications (1)

Publication Number Publication Date
CN201323405Y true CN201323405Y (en) 2009-10-07

Family

ID=41160777

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008201642918U Expired - Fee Related CN201323405Y (en) 2008-09-17 2008-09-17 Conducting wire preformed armour rod solder strip clamp

Country Status (1)

Country Link
CN (1) CN201323405Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103022936A (en) * 2012-11-20 2013-04-03 山西省电力公司阳泉供电公司 Preformed armor rod twined assist device
CN112968412A (en) * 2021-03-22 2021-06-15 国网河南省电力公司许昌供电公司 All-insulation phase color preformed armor rod

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103022936A (en) * 2012-11-20 2013-04-03 山西省电力公司阳泉供电公司 Preformed armor rod twined assist device
CN112968412A (en) * 2021-03-22 2021-06-15 国网河南省电力公司许昌供电公司 All-insulation phase color preformed armor rod
CN112968412B (en) * 2021-03-22 2022-07-29 国网河南省电力公司许昌供电公司 All-insulation phase color preformed armor rod

Similar Documents

Publication Publication Date Title
CN203626366U (en) Bracing wire back binding fastening tool
CN201323405Y (en) Conducting wire preformed armour rod solder strip clamp
CN209981482U (en) Self-locking type grounding wire clamp
CN203091806U (en) Drill jig working platform of cross-beam tube of engine supporting beam
CN202333527U (en) Portable multipurpose electric construction tool
CN202162411U (en) Portable hand bench drill
CN201685197U (en) Manual tongs for shearing and clamping
CN201118146Y (en) Clamp type hot-line work fixture
CN206794455U (en) Copper bar bending device
CN201889378U (en) Cutting machine for steel strand
CN205846603U (en) A kind of cable stripping cable pincers
CN214321919U (en) Drilling equipment is used in iron fence processing
CN204954773U (en) Portable multi -purpose construction tool
CN211351017U (en) A auxiliary fixtures for parallel groove clamp installation
CN104369133B (en) A kind of wire harness plug test fixed jig
CN206869392U (en) Girder steel connection end aligns welding tooling
CN211027910U (en) Tension spring bending tool
CN201740699U (en) Clamp special for tensile machine
CN205057376U (en) A fixing device for steel wire butt welding
CN210350612U (en) A quick assembly disassembly instrument for quadripartion conductor spacer
CN217571818U (en) Portable fixing clamp
CN206382547U (en) Dead head positioning-cutting device
CN206124024U (en) Rubber is PLC screw rod automatic demoulding device for product
CN216489429U (en) Special wire clamping tool for insulated wire
CN215817245U (en) Power supply and utilization power transmission and distribution line tightening device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20091007

Termination date: 20100917