CN201321722Y - Novel concrete material distributing rod - Google Patents

Novel concrete material distributing rod Download PDF

Info

Publication number
CN201321722Y
CN201321722Y CNU2008202283950U CN200820228395U CN201321722Y CN 201321722 Y CN201321722 Y CN 201321722Y CN U2008202283950 U CNU2008202283950 U CN U2008202283950U CN 200820228395 U CN200820228395 U CN 200820228395U CN 201321722 Y CN201321722 Y CN 201321722Y
Authority
CN
China
Prior art keywords
transition conduit
protective cover
bearing support
material distributing
distributing rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008202283950U
Other languages
Chinese (zh)
Inventor
赵光辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNU2008202283950U priority Critical patent/CN201321722Y/en
Application granted granted Critical
Publication of CN201321722Y publication Critical patent/CN201321722Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model relates to concrete conveying technique used in building construction. The concrete material distributing rod is characterized in that an umbrella-shaped shielding cover is sleeved on a transition tube above a bearing block, and the diameter of the outer edge of the shielding cover is bigger than that of the outer edge of the bearing block. The concrete material distributing rod is simple in structure and practical, and not only improves the work efficiency but also saves man power and material source and reduces the construction cost.

Description

The new concrete boom
Technical field
The utility model relates to the transmission and concrete transmission technology that building operations is used, specifically a kind of boom of delivering concrete.
Background technology
Boom is the transmission and concrete transmission that will the make conventional manual device to the job site.The critical component of this device is a transition conduit, and this transition conduit is erected to be fixed on the body by the bearing block activity, and its upper end is an Active Interface, is connected with the last pipe movable of supplied materials; Its lower end is following fixed interface, fixedlys connected with the pipe that gets rid of of discharging.During construction, hand and get rid of the big rope of Guan Weiduan, concrete is dispensed onto the job site.Since be subjected to the influence of factors such as mechanical shock, the active connection place of transition conduit and last pipeline, ubiquity spillage phenomenon, concrete (claiming mortar again) is easy to fall in the bearing support, causes the destruction to bearing support.So, need often to overhaul and even to change to bearing support, both influenced the operating efficiency of construction, also caused the waste of manpower, financial resources.
The utility model content
The purpose of this utility model is to solve traditional boom and has the flimsy problem of bearing support spare, and a kind of new concrete boom that can prevent effectively that bearing support spare from damaging is provided.
Main improvements of the present utility model are: on the transition conduit above the bearing support, cover is a umbrella protective cover then, and the outer diameter of protective cover is greater than the outer diameter of bearing support.
In the construction, when spillage took place, the mortar that oozes out fell along transition conduit, fell subsequently on the umbrella face of protective cover and along the umbrella face and slided to the edge, fell into ground at last, thereby made the bearing support that is positioned at the protective cover below obtain effective protection.The utility model is simple in structure, practical, has improved operating efficiency, has saved manpower and materials, has reduced construction cost.
Description of drawings
Fig. 1. cross the structural representation of wave duct
Fig. 2. the A-A sectional drawing of Fig. 1
Among the figure, the 1st, last pipeline, the 2nd, last Active Interface, the 3rd, transition conduit, the 4th, protective cover, the 5th, bearing support, the 6th, following fixed interface, 7 get rid of pipe, and the 8th, body.
The specific embodiment
Below in conjunction with embodiment of the present utility model of accompanying drawing narration
Present embodiment is mainly by last pipeline 1, transition conduit 3 with get rid of pipe and 7 be formed by connecting up and down, and the two ends of transition conduit 3 have last Active Interface 2 and following fixed interface 6 respectively, and transition conduit 3 is fixed on the body 8 by bearing support 5 with being straightened.Protective cover 4 is umbrella ringwise, and the interior garden of its annular is socketed on the transition conduit 3, and integrally welded; The diameter in protective cover 4 outer gardens is grown 2 centimetres than the diameter of the bearing support 5 of its below.In case scribbling one deck butter on the upper and lower surface of protective cover 4---mortar forms on protective cover when piling up, and is convenient to cleaning.

Claims (2)

1. concrete placing boom, by last pipeline (1), transition conduit (3) with get rid of pipe (7) and be formed by connecting up and down, there is last Active Interface (2) upper end of transition conduit (3), there is following fixed interface (6) its lower end, transition conduit (3) is fixed on the body (8) by bearing support (5) with being straightened, it is characterized in that: on the transition conduit (3) of bearing support (5) top, a protective cover of umbrella (4) is ringwise arranged, the garden is socketed on the transition conduit (3) in the annular of protective cover; The diameter in the outer garden of protective cover (4) is greater than bearing support (5) diameter of its below.
2. a kind of concrete placing boom according to claim 1 is characterized in that: scribble one deck butter on the upper and lower surface of protective cover (4).
CNU2008202283950U 2008-12-23 2008-12-23 Novel concrete material distributing rod Expired - Fee Related CN201321722Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008202283950U CN201321722Y (en) 2008-12-23 2008-12-23 Novel concrete material distributing rod

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008202283950U CN201321722Y (en) 2008-12-23 2008-12-23 Novel concrete material distributing rod

Publications (1)

Publication Number Publication Date
CN201321722Y true CN201321722Y (en) 2009-10-07

Family

ID=41159108

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008202283950U Expired - Fee Related CN201321722Y (en) 2008-12-23 2008-12-23 Novel concrete material distributing rod

Country Status (1)

Country Link
CN (1) CN201321722Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104603378A (en) * 2012-08-31 2015-05-06 普茨迈斯特工程有限公司 Concrete distributor mast
CN104641058A (en) * 2012-08-02 2015-05-20 普茨迈斯特工程有限公司 Concrete dispensing boom for concrete pumps

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104641058A (en) * 2012-08-02 2015-05-20 普茨迈斯特工程有限公司 Concrete dispensing boom for concrete pumps
CN104641058B (en) * 2012-08-02 2016-09-28 普茨迈斯特工程有限公司 Concrete placing boom for concrete pump
CN104603378A (en) * 2012-08-31 2015-05-06 普茨迈斯特工程有限公司 Concrete distributor mast

Similar Documents

Publication Publication Date Title
CN201321722Y (en) Novel concrete material distributing rod
CN200964565Y (en) Adhesion type anchor for fiber-reinforced plastic dragline
CN208072395U (en) A kind of novel enhanced resistance to plucking facilitates the pile for prestressed pipe of docking
CN205171521U (en) A device that is used for tubular pile stake core to clear up
CN211524184U (en) Supporting device for building construction
CN209620642U (en) Easy device in relation to concrete curing convenient-laying film
CN2813709Y (en) Anchor block
CN211850910U (en) Concrete vibrating spear for building engineering
CN201357292Y (en) Slag scraper for inside welds of spiral steel pipe
CN209669854U (en) A kind of cement-soil composite pile
CN208965543U (en) A kind of environment-friendly type pile crown structure
CN209410857U (en) A kind of " Ω " type reinforcing rib of particle material tank vehicle tank
CN207959740U (en) A kind of greenhouse air blowing type full width snow removing equipment
CN207312377U (en) A kind of big draw box mechanism of novel intelligent movement station
CN207823443U (en) Bind garbage cleaning device in the bar-mat reinforcement completed
CN202347528U (en) Steel tube inserted foundation
CN201490642U (en) PVC threading pipe and pipe joint thereof
CN214783830U (en) Pile hole protection device
CN216277190U (en) Linking type electric pole
CN204112741U (en) A kind of hand-placed concrete device for building
CN215324567U (en) Steel bar excess material storage device
CN209194520U (en) A kind of improvement structure of tubular pole
CN219175207U (en) Building concrete tubular pile protective structure
CN206897332U (en) A kind of mixer drawing mechanism for preventing airborne dust
CN206401847U (en) A kind of electric pipeline fixing device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20091007

Termination date: 20111223