CN201318130Y - Railway passenger transport private line bridge wall-proof drilling hole driller support - Google Patents

Railway passenger transport private line bridge wall-proof drilling hole driller support Download PDF

Info

Publication number
CN201318130Y
CN201318130Y CNU2008202411094U CN200820241109U CN201318130Y CN 201318130 Y CN201318130 Y CN 201318130Y CN U2008202411094 U CNU2008202411094 U CN U2008202411094U CN 200820241109 U CN200820241109 U CN 200820241109U CN 201318130 Y CN201318130 Y CN 201318130Y
Authority
CN
China
Prior art keywords
fixed
rig
support bar
passenger transport
drilling hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008202411094U
Other languages
Chinese (zh)
Inventor
聂伟
陈华明
张继光
郝慧洋
张学哲
孙永武
肖本学
方华清
胡洪会
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 11th Bureau Group Co Ltd
South Engineering Co Ltd of China Railway Construction Electrification Bureau Group Co Ltd
China Railway 11th Bureau Group Electric Engineering Co Ltd
Original Assignee
China Railway 11th Bureau Group Co Ltd
China Railway 11th Bureau Group Electric Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 11th Bureau Group Co Ltd, China Railway 11th Bureau Group Electric Engineering Co Ltd filed Critical China Railway 11th Bureau Group Co Ltd
Priority to CNU2008202411094U priority Critical patent/CN201318130Y/en
Application granted granted Critical
Publication of CN201318130Y publication Critical patent/CN201318130Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Processing Of Stones Or Stones Resemblance Materials (AREA)
  • Drilling And Boring (AREA)

Abstract

A railway passenger transport private line bridge wall-proof drilling hole driller support is characterized in that the support comprises a vertical support bar (5) which is fixed on a horizontal base (6) and a transverse support bar (10) which is fixed on a cannula (4) of the vertical support bar, wherein the cannula (4) of the vertical support bar is sleeved on the outside of the vertical support bar (5), and is fixed with a lifting screw bolt (2), a driller clamp (11) is fixedly installed on the transverse screw bolt (10), and a driller base (15) is fixed on the tail end of a transverse adjusting screw bolt (8). The railway passenger transport private line bridge wall-proof drilling hole driller support can be used fast, has accurate drilling, excellent stability and improved safety, can substantially improve working efficiency, and saves funds.

Description

Special line for passenger trains bridge-collision-avoidance wall drill drilling machine support
Technical field
The utility model relates to the engineering construction instrument, is a kind of special line for passenger trains bridge-collision-avoidance wall drill drilling machine support specifically.
Background technology
According to the Ministry of Railways " railway Eleventh Five-Year Plan ", the key task of China railways development at present concentrates on to be accelerated the flourishing railway network, carry forward vigorously the technical equipment modernization and guarantees six broad aspect such as safety of railway traffic.Eleventh Five-Year Plan railway construction scale is big, the height of standard, is to have no precedent on the Chinese Railway development history.In railroad bridge, constructing tunnel process, can the duration of insurance of guaranteeing the quality finish, and the raising labor productivity plays crucial effects to the success or failure of engineering.
Passenger dedicated railway Bridge is that both sides are followed successively by electric power, communication, signal cable groove from outside to inside on the box girder bridge bridge floor.Crashproof wall is a reinforced concrete structure, and thickness is 20 centimeters.Requirement according to the Line for Passenger Transportation construction technology, railway signals equipment is installed in the outside of crashproof wall by circuit without exception on the box bridge, equipment is installed the mode that adopts boring fixed angles base steel plinth on the crashproof wall, this mode has attractive in appearance, firm characteristics, and the problem of therefore bringing is exactly a large amount of bore operation.Crashproof wall is 20 centimeters thick reinforced concrete structures, and reinforcing bar is very close, and the difficulty of boring is well imagined.How innovating on instrument and improve, not only guarantee drilling quality but also the purpose of boosting productivity to reach, is a problem that must solve.
The method of hand held drilling is inadvisable, labour intensity height not only because the vibrations of rig make people's arm ache very soon, and since during rig work hand-held stability not enough, can't guarantee drilling accuracy, not only can't guaranteed efficiency but also can't ensure the quality of products.
Our producer that several families produce rig specially that instituted a survey, finding does not still have a product at the crashproof wall drill of railroad bridge hole at present on the market.Though have some manufacturer production to have the rig of support, concerning the construction of the special railway of visitor and inapplicable.
Summary of the invention
The purpose of this utility model provide a kind of can be efficiently, the stable rig support in special line for passenger trains bridge-collision-avoidance wall drill hole of finishing.
Described special line for passenger trains bridge-collision-avoidance wall drill drilling machine support is characterized in that: it is made of the cross support arm of being fixed in the perpendicular pole on the horizontal base and be fixed on the perpendicular rod bush, and described perpendicular pole sleeve pipe is placed in outside the perpendicular pole and with lifting screw and fixes; Described cross support arm going up fixedly is equipped with the rig clip, and the end of laterally adjusting screw rod is fixed with the rig seat, and the rig seat is arranged in the rig clip.
Lifting nut fixedly is housed respectively on the top of perpendicular pole and cross support arm and laterally adjusts nut, described lifting nut is connected with the horizontal screw flight of adjusting with lifting screw respectively with the horizontal nut of adjusting.
The Height Adjustment handle is equipped with on the top of described lifting screw, and the head end of laterally adjusting screw rod is equipped with horizontal adjustment handle.
Described perpendicular pole of being fixed on the base can have single or many, and the quantity of cross support arm is corresponding with perpendicular pole.
Through experiment repeatedly, the utlity model has following characteristics:
1. light.Weight support frame has only about 30 kilograms, and containing rig also only has 35 kilograms, is easy to loading and unloading and transportation;
2. stability is high when holing.Because base is stuck in the cable channel, so relatively more firm; Thereby guaranteed the accuracy of bore position;
3. drillhole height is easy to regulate.Regulating center bolt is the liftable rig;
4. used this support, rig does not directly contact with constructor's health, thereby has improved the safety of bore operation;
5. constructor's labour intensity has been reduced to minimum;
6. saving fund reduces labor cost, has improved operating efficiency, has significantly shortened the duration.
Performance analysis:
Carry out benefit calculation at hand-held boring with using this support dual mode of holing below.
Signalling arrangement mounting points every kilometer one place approximately on the box girder for passenger special line bridge, for example: every place needs drilling hole amount be: 8 in φ 50mm hole, 24 in φ 25mm hole.According to site test results, adopt hand-held every φ 50mm hole of holing to need 50 minutes approximately, φ 25mm hole needs 30 minutes approximately, and every place needs 1120 minutes (2.3 work day) altogether; The boring of employing support, every φ 50mm hole needs 30 minutes approximately, and φ 25mm hole needs 15 minutes approximately, and every place needs 600 minutes (1.25 work day) altogether.Specifically see the following form:
Figure Y20082024110900051
According to data computation in the form, human cost is amounted in the boring of every place: 736 yuan of hand-helds, 225 yuan of stent-types.Adopt after the support, human cost has directly been reduced by 70%, whole numeral is very considerable.
With the special engineering of Zheng Xi visitor is example, and about 180 places of shared signal equipment mounting points adopt after this support on the bridge, get final product more than 10 ten thousand yuan of direct saving funds.Moreover, it has also saved the time of half nearly for us, for carrying out follow-up work smoothly, guaranteeing that opening the duration provides temporal guarantee.
Description of drawings
Fig. 1 is the utility model structural representation.
Among the figure: 1-Height Adjustment handle, the 2-lifting screw, the 3-lifting nut, the perpendicular rod bush of 4-, 5-erects pole, 6-base, 7-are laterally adjusted handle, and 8-laterally adjusts screw rod, and 9-laterally adjusts nut, 10-cross support arm, 11-rig clip, 12-rig, 13-rig handle, 14-hollow boring bit.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is further specified: special line for passenger trains bridge-collision-avoidance wall drill drilling machine support as shown in fig. 1, it is characterized in that: it is by the perpendicular pole 5 of being fixed on the horizontal base 6, erect cross support arm 10 formations of propping up on the rod bush 4 with being fixed in, a described perpendicular rod bush 4 is placed in to erect outside the pole 5 and with lifting screw 2 and fixes; On the described cross support arm 10 rig clip 11 is housed fixedly, the end of laterally adjusting screw rod 8 is fixed with rig seat 15, and in use, rig 12 just is positioned in rig seat 15 and the rig clip 11, and rig 12 therein can be movable.
Lifting nut 3 and horizontal adjustment nut 9 fixedly are housed respectively on the top of perpendicular pole 5 and cross support arm 10, and described lifting nut 3 and the horizontal nut 9 of adjusting are threaded with lifting screw 2 and the horizontal screw rod 8 of adjusting respectively.Height Adjustment handle 1 is equipped with on the top of described lifting screw 2, and the head end of laterally adjusting screw rod 8 is equipped with horizontal adjustment handle 7.
It is as follows to use this support to carry out the process in crashproof wall drill hole:
On crashproof wall, mark the position of boring, determine the size of boring, select the drill bit of respective model.Because the purposes difference of boring, so the size of boring is also different, the bolt hole is φ 25mm, and through wires hole is φ 50mm.In hollow boring bit 14 positions at the first-class required drill bit of rig 12 front ends.
Support is placed in the cable channel, and rotation Height Adjustment handle 1 is with the drill bit bore position.Should guarantee that the rig support has a smooth working platform, drill bit is perpendicular to the boring plane.
Open generator, closed rig switch.
Handle 7 is laterally adjusted in rotation, advances drilling depth gradually, until boring saturating crashproof wall.As previously mentioned, crashproof wall is a reinforced concrete structure, and reinforcing bar is very close, and it is impossible thinking to avoid fully, thus boring the time run into reinforcing bar can not be irritable, slowly rotating handles slowly advances.
At last rig is withdrawed from residual concrete in the cleaning hollow boring bit.

Claims (4)

1, a kind of special line for passenger trains bridge-collision-avoidance wall drill drilling machine support, it is characterized in that: it is by the perpendicular pole (5) of being fixed on the horizontal base (6), constitute with the cross support arm (10) of being fixed on the perpendicular rod bush (4), it is outer and fixing with lifting screw (2) that a described perpendicular rod bush (4) is placed in perpendicular pole (5); Described cross support arm (10) going up fixedly is equipped with rig clip (11), and the end of laterally adjusting screw rod (8) is fixed with rig seat (15), and rig seat (15) is arranged in rig clip (11).
2, special line for passenger trains bridge-collision-avoidance wall drill drilling machine support according to claim 1, it is characterized in that: lifting nut (3) fixedly is housed respectively on the top of perpendicular pole (5) and cross support arm (10) and laterally adjusts nut (9), described lifting nut (3) and the horizontal nut (9) of adjusting are threaded with lifting screw (2) and the horizontal screw rod (8) of adjusting respectively.
3, special line for passenger trains bridge-collision-avoidance wall drill drilling machine support according to claim 1 and 2, it is characterized in that: Height Adjustment handle (1) is equipped with on the top of described lifting screw (2), and the head end of laterally adjusting screw rod (8) is equipped with horizontal adjustment handle (7).
4, special line for passenger trains bridge-collision-avoidance wall drill drilling machine support according to claim 1, it is characterized in that: described perpendicular pole (5) of being fixed on the base (6) can have single or many, and the quantity of cross support arm (10) is corresponding with perpendicular pole (5).
CNU2008202411094U 2008-12-30 2008-12-30 Railway passenger transport private line bridge wall-proof drilling hole driller support Expired - Fee Related CN201318130Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008202411094U CN201318130Y (en) 2008-12-30 2008-12-30 Railway passenger transport private line bridge wall-proof drilling hole driller support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008202411094U CN201318130Y (en) 2008-12-30 2008-12-30 Railway passenger transport private line bridge wall-proof drilling hole driller support

Publications (1)

Publication Number Publication Date
CN201318130Y true CN201318130Y (en) 2009-09-30

Family

ID=41196896

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008202411094U Expired - Fee Related CN201318130Y (en) 2008-12-30 2008-12-30 Railway passenger transport private line bridge wall-proof drilling hole driller support

Country Status (1)

Country Link
CN (1) CN201318130Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106335033A (en) * 2016-08-24 2017-01-18 浙江宏泰工程项目管理有限公司 Lifting, shock-isolating and falling-preventing perforating machine provided with telescope for building detection
CN110159191A (en) * 2019-05-30 2019-08-23 国网河南省电力公司内乡县供电公司 The device of wired pipe is excavated under a kind of road surface

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106335033A (en) * 2016-08-24 2017-01-18 浙江宏泰工程项目管理有限公司 Lifting, shock-isolating and falling-preventing perforating machine provided with telescope for building detection
CN110159191A (en) * 2019-05-30 2019-08-23 国网河南省电力公司内乡县供电公司 The device of wired pipe is excavated under a kind of road surface

Similar Documents

Publication Publication Date Title
CN205689147U (en) A kind of drilling rod automatically is unloaded mechanism
CN213336874U (en) Special sampling drill bit of high accuracy geological survey
CN201318130Y (en) Railway passenger transport private line bridge wall-proof drilling hole driller support
CN202165096U (en) Tunnel steel arch frame jacking device
CN103028756A (en) Portable gantry electromagnetic drill
CN107762420A (en) A kind of shock-absorbing type portable sampling drill based on Internet of Things
WO2021169222A1 (en) Mine exploration assisting machine
CN103670286A (en) All-dimensional moving base seat for steel pylon composite foundation anchoring drill rig
CN214749008U (en) Geological survey drilling equipment
CN103382813B (en) Bottom anchor drilling machine support
CN105881660B (en) Efficient container wood floor hole-drilling system
CN202291507U (en) Portable self-positioning electric hand drill
CN205506452U (en) A secondary is got core and is configure for ground stress test
CN106050125B (en) A kind of portable all-hydraulic engineering investigation drilling machine
CN205172430U (en) Portable down -hole drill
CN104373040A (en) Mining drilling indicating and steadying device
CN210003230U (en) Coal mine geological drilling sampling device
CN213116355U (en) Steel arch frame lock foot stock angle positioning support
CN205638219U (en) Deep hole portable drilling rig of can taking a sample suitable for steep mountain region
CN209637764U (en) Three arm rock drilling jumbos stablize rack
CN103042251B (en) Electric hand drill vertical perforating auxiliary electrical drilling cramp
CN209145499U (en) A kind of quick geology exploratory drilling rig
CN108487873B (en) Rock sample coring device based on joint robot
CN205532330U (en) Tunnel well drilling impels support
CN213450370U (en) Rock core sampling device for geological prospecting

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20091016

Address after: 347, Zhongshan Road, Wuchang District, Hubei, Wuhan Province, 430071

Co-patentee after: The Electrical Service Engineering Co., Ltd. of China Railway 11th Group

Patentee after: China Railway eleven Bureau Group Co., Ltd.

Co-patentee after: Nanfang Engineering Co., Ltd. of China Railway Construction Electrification Bureau Group Co., Ltd.

Address before: 347, Zhongshan Road, Wuchang District, Hubei, Wuhan Province, 430071

Co-patentee before: The Electrical Service Engineering Co., Ltd. of China Railway 11th Group

Patentee before: China Railway eleven Bureau Group Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090930

Termination date: 20171230