CN201314936Y - Exit logic comprehensive tester for relay protector - Google Patents

Exit logic comprehensive tester for relay protector Download PDF

Info

Publication number
CN201314936Y
CN201314936Y CNU2008202144182U CN200820214418U CN201314936Y CN 201314936 Y CN201314936 Y CN 201314936Y CN U2008202144182 U CNU2008202144182 U CN U2008202144182U CN 200820214418 U CN200820214418 U CN 200820214418U CN 201314936 Y CN201314936 Y CN 201314936Y
Authority
CN
China
Prior art keywords
comprehensive tester
logic
input circuit
exit
outlet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2008202144182U
Other languages
Chinese (zh)
Inventor
顾建军
陈燕林
季京
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Nantong Power Supply Co of Jiangsu Electric Power Co Ltd
Original Assignee
Nantong Power Supply Co of Jiangsu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nantong Power Supply Co of Jiangsu Electric Power Co Ltd filed Critical Nantong Power Supply Co of Jiangsu Electric Power Co Ltd
Priority to CNU2008202144182U priority Critical patent/CN201314936Y/en
Application granted granted Critical
Publication of CN201314936Y publication Critical patent/CN201314936Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Testing Electric Properties And Detecting Electric Faults (AREA)

Abstract

The utility model discloses an exit logic comprehensive tester for a relay protector. The exit logic comprehensive tester comprises a comprehensive tester output contact input circuit, and an electric state analog input circuit, wherein the comprehensive tester output contact input circuit and the electric state analog input circuit are connected with a relay protector to be tested and an automatic device; the delay protector and the automatic device are connected with a common input loop of the comprehensive tester through a fixed logic exit and are connected with a time sequence selection input loop of the comprehensive tester through a time sequence logic exit; and the common input loop and the time sequence selection input loop of the comprehensive tester are connected with an exit logic light signal memory circuit. The exit logic comprehensive tester has the advantages of reasonable structure and good work efficiency.

Description

Relay protection outlet logic comprehensive tester
Technical field:
The utility model relates to a kind of relay protection outlet logic comprehensive tester.
Background technology:
Modern comprehensive automation electric substation's relay protection and automation equipment function are integrated day by day; increasingly sophisticatedization of core apparatus (as: main transformer protection, bus differential protection and prepared auto restart etc.) outlet action logic; and the conventional device complex structure is difficult to adapt to the needs that develop.
Summary of the invention:
It is a kind of rational in infrastructure that the purpose of this utility model is to provide, the relay protection outlet logic comprehensive tester of good working effect.
Technical solution of the present utility model is:
A kind of relay protection outlet logic comprehensive tester; it is characterized in that: comprise that comprehensive tester leaves the contact input circuit; the electric state simulated measurement input circuit; comprehensive tester is left the contact input circuit; the electric state simulated measurement input circuit is connected with measured relay protection and automation equipment; the fixed point logic outlet of passing through of measured relay protection and automation equipment is opened entry loop with the comprehensive tester routine and is connected; measured relay protection and automation equipment are selected to open entry loop by the sequential logic outlet with the sequential of comprehensive tester and are connected, and the comprehensive tester routine is left entry loop; the sequential of comprehensive tester is selected to open entry loop and is connected with outlet logic wigwag memory circuit.
The utility model is rational in infrastructure, and good working effect continues in electric power infrastructure project and power transformation technology innovation project and to protect and the automated debug field all has broad application prospects.In infrastructure project continues guarantor and automation equipment blocking debugging, can obviously simplify tested device external status tests of simulating wiring workload, improve on-the-spot work efficiency; In the power transformation technology innovation project, before having a power failure, the power transformation operation system just can reasonably not carry out accurately complete logical action outlet test by the various states of tester analogue electrical systems actual motion and to tested device, a large amount of workloads that reduce equipment debugging work when having a power failure, effectively shorten the necessary power failure working time in the debugging of power transformation technology innovation project, reliably reduce security risk.
Description of drawings:
The utility model is described in further detail below in conjunction with drawings and Examples.
Fig. 1 is the configuration diagram of an embodiment of the utility model.
Embodiment:
A kind of relay protection outlet logic comprehensive tester; comprise that comprehensive tester leaves contact input circuit 1; electric state simulated measurement input circuit 2; comprehensive tester is left the contact input circuit; the electric state simulated measurement input circuit is connected with measured relay protection and automation equipment 3; the fixed point logic outlet of passing through of measured relay protection and automation equipment is opened entry loop 4 with the comprehensive tester routine and is connected; measured relay protection and automation equipment are selected to open entry loop 5 by the sequential logic outlet with the sequential of comprehensive tester and are connected, and the comprehensive tester routine is left entry loop; the sequential of comprehensive tester is selected to open entry loop and is connected with outlet logic wigwag memory circuit 6.

Claims (1)

1; a kind of relay protection outlet logic comprehensive tester; it is characterized in that: comprise that comprehensive tester leaves the contact input circuit; the electric state simulated measurement input circuit; comprehensive tester is left the contact input circuit; the electric state simulated measurement input circuit is connected with measured relay protection and automation equipment; the fixed point logic outlet of passing through of measured relay protection and automation equipment is opened entry loop with the comprehensive tester routine and is connected; measured relay protection and automation equipment are selected to open entry loop by the sequential logic outlet with the sequential of comprehensive tester and are connected, and the comprehensive tester routine is left entry loop; the sequential of comprehensive tester is selected to open entry loop and is connected with outlet logic wigwag memory circuit.
CNU2008202144182U 2008-12-04 2008-12-04 Exit logic comprehensive tester for relay protector Expired - Lifetime CN201314936Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008202144182U CN201314936Y (en) 2008-12-04 2008-12-04 Exit logic comprehensive tester for relay protector

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008202144182U CN201314936Y (en) 2008-12-04 2008-12-04 Exit logic comprehensive tester for relay protector

Publications (1)

Publication Number Publication Date
CN201314936Y true CN201314936Y (en) 2009-09-23

Family

ID=41126735

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008202144182U Expired - Lifetime CN201314936Y (en) 2008-12-04 2008-12-04 Exit logic comprehensive tester for relay protector

Country Status (1)

Country Link
CN (1) CN201314936Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103353556A (en) * 2013-06-06 2013-10-16 国家电网公司 Relay protection device pressboard outlet logic detection apparatus
CN108802598A (en) * 2018-05-29 2018-11-13 国网河南省电力公司检修公司 A kind of 1000 kilovolts of extra-high voltage series compensation protection exit loop test methods
CN110542805A (en) * 2018-05-29 2019-12-06 国网河南省电力公司检修公司 comprehensive relay protection outlet loop tester

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103353556A (en) * 2013-06-06 2013-10-16 国家电网公司 Relay protection device pressboard outlet logic detection apparatus
CN103353556B (en) * 2013-06-06 2016-12-28 国家电网公司 Protective relaying device pressing plate outlet logic detection device
CN108802598A (en) * 2018-05-29 2018-11-13 国网河南省电力公司检修公司 A kind of 1000 kilovolts of extra-high voltage series compensation protection exit loop test methods
CN110542805A (en) * 2018-05-29 2019-12-06 国网河南省电力公司检修公司 comprehensive relay protection outlet loop tester

Similar Documents

Publication Publication Date Title
CN103713214A (en) Intelligent transformer station relay protection closed loop test system
CN203981788U (en) A kind of photovoltaic combining inverter automatic detection device
CN102928717A (en) Relay protection tripping matrix test system
CN101102566B (en) A design method and debugging method for mobile phone JTAG debugging interface signals
CN201314936Y (en) Exit logic comprehensive tester for relay protector
CN105182134B (en) A kind of prepared auto restart action logic and switch breaker tripping and closing are delayed definite value verifying attachment
CN201312143Y (en) Measuring and control terminal of signal power supply
CN204065685U (en) A kind of light digital relay protection tester time response verifying attachment
CN103728510B (en) Excitation unit on-site test system and method
CN109900990A (en) A kind of wearable device complete machine current test method
CN203337704U (en) Low-voltage intelligent electric meter electricity-stealing checking device
CN202171628U (en) Protection trip matrix testing device for transformer
CN203149045U (en) Spare power supply auto-switching calibrator
CN202443330U (en) Combination control unit detector
CN102169146A (en) Method for detecting function of frequency converter
CN202257549U (en) Simulated resetting circuit device
CN202758008U (en) Performance testing device of trip outlet contact of relay protection device
CN202083745U (en) Function test device for frequency converter
CN201892712U (en) Automatic test device for lithium battery circuit protection boards
CN204314400U (en) Auto-switch-on integrated tester
CN209102820U (en) A kind of detection system of intelligent breaker protective module
CN103389664B (en) Intelligent electric motor protection and control device
CN102945003B (en) Method for emulation device for converter module
CN205210294U (en) Portable collection terminal Test device
CN205643683U (en) Ampere meter with measurement interface

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: JIANGSU ELECTRIC POWER COMPANY NANTONG POWER SUPPL

Effective date: 20121130

Owner name: STATE GRID CORPORATION OF CHINA

Free format text: FORMER OWNER: NANTONG POWER SUPPLY COMPANY, JIANGSU ELECTRIC POWER CO., LTD.

Effective date: 20121130

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 226006 NANTONG, JIANGSU PROVINCE TO: 100031 XICHENG, BEIJING

TR01 Transfer of patent right

Effective date of registration: 20121130

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee after: State Grid Corporation of China

Patentee after: Jiangsu Electric Power Company

Patentee after: Nantong Power Supply Company, Jiangsu Electric Power Co., Ltd.

Address before: 226006 No. 69 middle Youth Road, Jiangsu, Nantong

Patentee before: Nantong Power Supply Company, Jiangsu Electric Power Co., Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20090923