CN201310370Y - Large mining height shield hydraulic support - Google Patents

Large mining height shield hydraulic support Download PDF

Info

Publication number
CN201310370Y
CN201310370Y CNU2008202388098U CN200820238809U CN201310370Y CN 201310370 Y CN201310370 Y CN 201310370Y CN U2008202388098 U CNU2008202388098 U CN U2008202388098U CN 200820238809 U CN200820238809 U CN 200820238809U CN 201310370 Y CN201310370 Y CN 201310370Y
Authority
CN
China
Prior art keywords
support
hinged
hydraulic
jack
face guard
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2008202388098U
Other languages
Chinese (zh)
Inventor
焦承尧
凌文
刘富营
向家雨
高有进
顾大钊
郭昊峰
龚宇
王继生
倪和平
祝炳梁
董江林
于德润
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Shenhua Energy Co Ltd
Zhengzhou Coal Mining Machinery Group Co Ltd
Original Assignee
Zhengzhou Coal Mining Machinery Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Coal Mining Machinery Group Co Ltd filed Critical Zhengzhou Coal Mining Machinery Group Co Ltd
Priority to CNU2008202388098U priority Critical patent/CN201310370Y/en
Application granted granted Critical
Publication of CN201310370Y publication Critical patent/CN201310370Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The utility model discloses a large mining height shield hydraulic support, which comprises a base and a hydraulic double-telescopic vertical column which is arranged on the base, wherein the top end of the hydraulic double-telescopic vertical column is articulated with a needling of a support top beam, the rear portion of the support top beam is articulated with a support shield beam, and the lower portion of the support shield beam is articulated with the base through a connecting bar. The support top beam is an integrated structure, the front portion is a drawer type telescopic beam, the front end of the telescopic beam is articulated with a primary side wall protection plate, the front end of the primary side wall protection plate is articulated with a secondary side wall protection plate, the front end of the secondary side wall protection plate is articulated with a tertiary side wall protection plate, and a balance jack whose cylinder diameter is 280mm is arranged between the support top beam and the support shied beam. The large mining height shield hydraulic support has the advantages that the working resistance of the support is large and can be above 16800KN, the support strength can be above 1.40Mpa which is the maximum tonnage in the world at present, and the height of the hydraulic support is the highest. The large mining height shield hydraulic support is the only one hydraulic support whose height can be 7m in the world at present.

Description

Big mining height hydraulic shield support
Technical field
The utility model relates to the big mining height hydraulic shield support that uses under the mine.
Background technology
Hydraulic shield support is the support apparatus of underground work indispensability.Along with improving constantly of down-hole mechanical extracting level, to the intensity of hydraulic shield support, highly, safety etc. requires more and more higher.Therefore, to combine the hydraulic shield support of adopting be the problem that those skilled in the art study always to the high-yield and high-efficiency that is used for that possesses that yield load is big, supporting height is high, supporting intensity is big.
The utility model content
The utility model purpose is to provide that a kind of yield load is big, supporting intensity and the high hydraulic shield support of support height.
For achieving the above object, the utility model can be taked following technical proposals:
Big mining height hydraulic shield support described in the utility model, it comprises base, is arranged on the Hydraulic Double telescopic column on the described base, described Hydraulic Double telescopic column top and set cap needling are hinged; Set cap rear portion and support caving shield are hinged; Support caving shield bottom is hinged by connecting rod and base; Described set cap is an overall structure, and the front portion is the drawer type extensible canopy, is hinged with the one-level face guard at described extensible canopy front end, is hinged with the secondary face guard at the front end of described one-level face guard, is hinged with the three-stage side protecting plate at the front end of described secondary face guard; Back timber is provided with flexible jack, and described flexible jack push rod is connected with extensible canopy is anterior; The extensible canopy front portion is provided with one-level wall supporting jack, and the push rod of described one-level wall supporting jack is hinged by little four bars and one-level face guard rear portion; The one-level face guard is provided with secondary wall supporting jack, and the push rod of described secondary wall supporting jack and secondary face guard rear portion are hinged; The secondary face guard is provided with the three-stage side protecting jack, and the push rod of described three-stage side protecting jack and three-stage side protecting postlaminar part are hinged; Between set cap and support caving shield, be provided with the balance jack that cylinder diameter is 280mm.
The length of set cap front and back ends is arrived than 2.35: 1 in the needling position that is arranged on the described set cap.
Described base is for opening mark structure in the middle of being rigidly connected.
The both sides side guard board of described set cap and support caving shield is bascule.
Described Hydraulic Double telescopic column is flexible highly to be seven meters, and its hydraulic cylinder cylinder diameter is Φ 500mm.
The utility model advantage is that working resistance of support is big, can reach more than the 16800KN, and supporting intensity reaches more than the 1.40MPa, is present tonnage the biggest in the world, the hydraulic support of maximum height; It is the hydraulic support that present in the world unique supporting height reaches 7m, the column application point is set to 2.35: 1 to back timber front end length and column application point to the top beam rear end length ratio, this ratio is 2.90: 1 after extensible canopy stretches out, when improving support front end support capacity, reduce base front end specific pressure.The effect of regulating support point of resultant force position, improving the Roof Control effect has been played in the setting of balance jack; When top board is more complete, when back timber rear portion pressure was big, balance jack was born pulling force, and will move behind the support force action position, increased the carrying of support rear portion and cut the top ability.Broken when top board, when the anterior pressure of back timber was big, balance jack was born pressure, and with the reach of support force action position, increased the anterior supporting capacity of support.For preventing roof cracking, coal wall caving problem, adopt the long side guard board structure of integral top beam, the back timber front end is provided with telescopic front-axle beam, realizes the timely maintenance control to anterior top board, prevents roof collapse.The extensible canopy front end is provided with three-stage side protecting mechanism, moves with extensible canopy, and the wall supporting height reaches 3.7m; In time the wall supporting jack is stretched out after coal-winning machine has been adopted coal, rib is lived in the face guard supporting, preventing coal wall caving, recoverable again face guard when trying to stop people from fighting each other, three grades protect nation can be folding fully, compact conformation.The connecting rod that support caving shield bottom and base are hinged adopts two front rods, whole back link structure, makes the support resistance to overturning good.Base adopts rigidity split pattern, and middle bay does not have base plate, and base gap bridge back is provided with lifts base mechanism, therefore helps float coal and discharges and lift base.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
The specific embodiment
As shown in the figure, big mining height hydraulic shield support described in the utility model, it comprises base 1, described base 1 is for opening mark structure in the middle of being rigidly connected; Described base 1 is provided with Hydraulic Double telescopic column 2, described Hydraulic Double telescopic column 2 stretches and highly is seven meters, its hydraulic cylinder cylinder diameter is that Φ 500mm Hydraulic Double telescopic column 2 tops and set cap 3 needlings 4 are hinged, and the length of set cap 3 front and back ends is arrived than 2.35: 1 in needling 4 positions; Set cap 3 rear portions and support caving shield 5 are hinged; Support caving shield 5 bottoms are hinged by two front rods 6, whole back link 7 structures and base 1; Described set cap 3 is an overall structure, the front portion is a drawer type extensible canopy 8, be hinged with one-level face guard 9 at described extensible canopy 8 front ends, be hinged with secondary face guard 10, be hinged with three-stage side protecting plate 11 at the front end of described secondary face guard 10 at the front end of described one-level face guard 9; Back timber 3 is provided with flexible jack 12, described flexible jack 12 push rods and 8 anterior connections of extensible canopy; Extensible canopy 8 front portions are provided with one-level wall supporting jack 13, and the push rod of described one-level wall supporting jack 13 is hinged by little four bars and one-level face guard 9 rear portions; One-level face guard 9 is provided with secondary wall supporting jack 14, and the push rod of described secondary wall supporting jack 14 and secondary face guard 10 rear portions are hinged; Secondary face guard 10 is provided with three-stage side protecting jack 15, and the push rod of described three-stage side protecting jack 15 and three-stage side protecting plate 11 rear portions are hinged; Between set cap 3 and support caving shield 5, be provided with the balance jack 16 of cylinder diameter Φ 280mm.Be provided with the side guard board 17,18 of bascule in set cap 3 and support caving shield 5 both sides.

Claims (5)

1, a kind of big mining height hydraulic shield support, it comprises base (1), is arranged on the Hydraulic Double telescopic column (2) on the described base (1), described Hydraulic Double telescopic column (2) top and set cap (3) needling (4) are hinged; Set cap (3) rear portion and support caving shield (5) are hinged; Support caving shield (5) bottom is hinged by two front rods (6), whole back link (7) structure and base (1); It is characterized in that: described set cap (3) is overall structure, the front portion is drawer type extensible canopy (8), be hinged with one-level face guard (9) at described extensible canopy (8) front end, front end at described one-level face guard (9) is hinged with secondary face guard (10), is hinged with three-stage side protecting plate (11) at the front end of described secondary face guard (10); Back timber (3) is provided with flexible jack (12), and described flexible jack (12) push rod is connected with extensible canopy (8) is anterior; Extensible canopy (8) front portion is provided with one-level wall supporting jack (13), and the push rod of described one-level wall supporting jack (13) is hinged by little four bars and one-level face guard (9) rear portion; One-level face guard (9) is provided with secondary wall supporting jack (14), and the push rod of described secondary wall supporting jack (14) and secondary face guard (10) rear portion are hinged; Secondary face guard (10) is provided with three-stage side protecting jack (15), and the push rod of described three-stage side protecting jack (15) and three-stage side protecting plate (11) rear portion are hinged; Between set cap (3) and support caving shield (5), be provided with the balance jack that cylinder diameter is 280mm (16).
2, big mining height hydraulic shield support according to claim 1 is characterized in that: the length of set cap (3) front and back ends is arrived than 2.35: 1 in needling (4) position that is arranged on the described set cap (3).
3, big mining height hydraulic shield support according to claim 1 and 2 is characterized in that: described base (1) is for opening mark structure in the middle of being rigidly connected.
4, big mining height hydraulic shield support according to claim 1 and 2 is characterized in that: the both sides side guard board (17,18) of described set cap (3) and support caving shield (5) is bascule.
5, big mining height hydraulic shield support according to claim 1 and 2 is characterized in that: described Hydraulic Double telescopic column (2) is flexible highly to be seven meters, and its hydraulic cylinder cylinder diameter is Φ 500mm.
CNU2008202388098U 2008-12-16 2008-12-16 Large mining height shield hydraulic support Expired - Lifetime CN201310370Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008202388098U CN201310370Y (en) 2008-12-16 2008-12-16 Large mining height shield hydraulic support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008202388098U CN201310370Y (en) 2008-12-16 2008-12-16 Large mining height shield hydraulic support

Publications (1)

Publication Number Publication Date
CN201310370Y true CN201310370Y (en) 2009-09-16

Family

ID=41107624

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008202388098U Expired - Lifetime CN201310370Y (en) 2008-12-16 2008-12-16 Large mining height shield hydraulic support

Country Status (1)

Country Link
CN (1) CN201310370Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013131318A1 (en) * 2012-03-07 2013-09-12 中煤北京煤矿机械有限责任公司 Two-prop shield hydraulic support for large centre to centre distance and ultra-high working resistance in medium-thickness coal seams
WO2014139195A1 (en) * 2013-03-15 2014-09-18 中国矿业大学 Overall top beam statically indeterminate hydraulic bracket
CN109268052A (en) * 2018-11-23 2019-01-25 中国矿业大学(北京) A kind of scissors fork mechanism drawer type hydraulic support
CN114017088A (en) * 2021-11-01 2022-02-08 国能神东煤炭集团有限责任公司 Hydraulic support with side protection mechanism

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013131318A1 (en) * 2012-03-07 2013-09-12 中煤北京煤矿机械有限责任公司 Two-prop shield hydraulic support for large centre to centre distance and ultra-high working resistance in medium-thickness coal seams
WO2014139195A1 (en) * 2013-03-15 2014-09-18 中国矿业大学 Overall top beam statically indeterminate hydraulic bracket
CN109268052A (en) * 2018-11-23 2019-01-25 中国矿业大学(北京) A kind of scissors fork mechanism drawer type hydraulic support
CN109268052B (en) * 2018-11-23 2024-04-05 中国矿业大学(北京) Drawer type hydraulic support of scissor fork mechanism
CN114017088A (en) * 2021-11-01 2022-02-08 国能神东煤炭集团有限责任公司 Hydraulic support with side protection mechanism
CN114017088B (en) * 2021-11-01 2023-12-22 国能神东煤炭集团有限责任公司 Hydraulic support with side protection mechanism

Similar Documents

Publication Publication Date Title
CN101037945A (en) 6.3 meters high support covering hydraulic support
CN201025051Y (en) Cover type hydraulic supporter
CN201090230Y (en) Fission top beam flexible support
CN201310370Y (en) Large mining height shield hydraulic support
CN104675421A (en) Multifunctional hydraulic support equipment
RU121861U1 (en) TWO-POSITION TWO-POINT HYDRAULIC FASTENERS FOR DESTRUCTION OF A LOW-LOCATED Upper Bundle of a coal seam
CN101519973B (en) Hydraulic bracket with interconnected top and bottom
CN201407057Y (en) Large-mining high-covering type hydraulic bracket
CN200999625Y (en) Cover type hydraulic support
CN202832574U (en) Large mining height hydraulic support
CN101418694B (en) Composite slope guarding hydraulic support and use thereof
CN102251790A (en) Mining and filling integrated hydraulic support enabling double top beams to be coaxially hinged with four connecting rods
CN101270668A (en) Bracket especially for retracement of fully-mechanized mining surface
CN201059162Y (en) Hydro-cylinder lifting type folding derrick
CN101526004B (en) Large inclination-angle low-position top coal hydraulic bracket
CN110094220A (en) A kind of mining two columns guide rod type erosion control tunnel advanced hydraulic support
CN202788899U (en) Large-swing beam structured top coal caving hydraulic support
CN200999623Y (en) Collapsible two stages side protection mechanism
CN208546180U (en) Super large mining high-covering type hydraulic bracket
CN201934115U (en) Ultra-large mining height hydraulic support
CN102900450A (en) Caving coal hydraulic support with large swing beam structure
CN201391321Y (en) Large-dig-angle low-level caving hydraulic support
CN201137500Y (en) Coal mine down-hole split articulation type advanced support bracket
CN206554965U (en) Fully-mechanized mining working automatic moving type lifts canopy
CN202181910U (en) Mining and filling integrated hydraulic support frame with double top beam and four-connecting rod coaxially-hinged

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: ZHENGZHOU MINE MACHINE GROUP CO., LTD.

Free format text: FORMER NAME: ZHENGZHOU COAL MINE MACHINERY GROUP CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: No. 105, Huashan Road, Zhongyuan District, Henan, Zhengzhou: 450013

Patentee after: Zhengzhou Coal Mining Machinery Group Co., Ltd.

Address before: No. 105, Huashan Road, Zhongyuan District, Henan, Zhengzhou: 450013

Patentee before: Zhengzhou Coal Mining Machinery Group Co., Ltd.

ASS Succession or assignment of patent right

Owner name: CHINA SHENHUA ENERGY COMPANY LIMITED

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20110526

Address after: 450013 No. 105, Huashan Road, Zhongyuan District, Henan, Zhengzhou

Co-patentee after: China Shenhua Energy Co., Ltd.

Patentee after: Zhengzhou Coal Mining Machinery Group Co., Ltd.

Address before: 450013 No. 105, Huashan Road, Zhongyuan District, Henan, Zhengzhou

Patentee before: Zhengzhou Coal Mining Machinery Group Co., Ltd.

CX01 Expiry of patent term

Granted publication date: 20090916

CX01 Expiry of patent term