CN201303001Y - Fast cooling diffusion furnace - Google Patents

Fast cooling diffusion furnace Download PDF

Info

Publication number
CN201303001Y
CN201303001Y CNU2008201595739U CN200820159573U CN201303001Y CN 201303001 Y CN201303001 Y CN 201303001Y CN U2008201595739 U CNU2008201595739 U CN U2008201595739U CN 200820159573 U CN200820159573 U CN 200820159573U CN 201303001 Y CN201303001 Y CN 201303001Y
Authority
CN
China
Prior art keywords
cooling
diffusion furnace
fast cooling
furnace
burner hearth
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008201595739U
Other languages
Chinese (zh)
Inventor
张恩理
娄志林
谢剑刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUNAN TLNZ SOLAR TECHNOLOGY Co Ltd
Original Assignee
HUNAN TLNZ SOLAR TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUNAN TLNZ SOLAR TECHNOLOGY Co Ltd filed Critical HUNAN TLNZ SOLAR TECHNOLOGY Co Ltd
Priority to CNU2008201595739U priority Critical patent/CN201303001Y/en
Application granted granted Critical
Publication of CN201303001Y publication Critical patent/CN201303001Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/50Manufacturing or production processes characterised by the final manufactured product

Landscapes

  • Furnace Details (AREA)

Abstract

A fast cooling diffusion furnace, which solves the problem of slow cooling of the prior diffusion furnace, is characterized in that the furnace hearth has a double-layered heat insulation structure; a cooling air inlet pipe (1) and a solenoid valve are arranged on the upper part of the furnace hearth; air outlets (7) are formed on both lower ends of the furnace hearth; holes (9) are formed on two side surfaces of an annular distribution pipe (8) surrounding the middle part of the inner heat insulating layer (5); and the cooling air can enter a heat insulation interlayer (4) through the holes. The fast cooling diffusion furnace is mainly used for the manufacture of PN junctions of solar cells.

Description

A kind of diffusion furnace of energy fast cooling
Technical field
The utility model relates to a kind of diffusion furnace of energy fast cooling.
Background technology
At present, solar battery sheet forms in the process of PN junction, because arts demand is rapidly heated and lowers the temperature, for guaranteeing heating rate and energy efficiency, heat-insulation layer is thick more good more, but uses too thick heat-insulation layer, can't accomplish that again burner hearth needs fast cooling.If in burner hearth, use wind cooling temperature lowering, can make local temperature inhomogeneous again, bring bad technology consequence to product.The diffusion furnace insulation thickness of producing reduces to 70mm by original 110mm now, some heat-insulating properties have been sacrificed, but the fastest decline temperature can only reach 5 ℃/min, still do not satisfy higher technological requirement, can bring severe energy waste and temperature instability again if reduce insulation layer thickness again.
Summary of the invention
The purpose of this utility model provides a kind of diffusion furnace of energy fast cooling.
The technical scheme that its technical problem that solves the utility model adopts is: for satisfying the technological requirement in the diffusion process, burner hearth is a double-decked insulation, the burner hearth middle upper portion is provided with into cooling tracheae and electromagnetic gas valve, stove is stared at the bottom, two ends and is provided with the gas outlet, when needing fast cooling, open the air inlet electromagnetically operated valve and be blown into compressed air, for guaranteeing that cooling evenly is blown into through ring-like gas-distributing pipe, the annular gas-distributing pipe is around the inner thermal insulating layer middle part, process a lot of apertures in the two sides of ring-like distributing pipe, cooling air is blown into the insulation interlayer by aperture, make the internal furnace fast cooling, when needs are incubated, close electromagnetic gas valve, thus since air inlet/outlet is less and down the air in the interlayer can't flow and have good heat insulation effect, play well energy-conservation and temperature stabilization effect simultaneously.
The beneficial effects of the utility model are, because interlayer is arranged, make the quickening that underspeeds of the utility model temperature, and temperature stabilization, are implemented in the fast cooling in the solar battery sheet production process.
Description of drawings
Fig. 1 is the utility model schematic diagram.
Fig. 2 is annular gas-distributing pipe schematic diagram.
1. advance to cool off tracheae, 2. furnace enclosure, 3. external thermal insulation, 4. insulation interlayer, 5. inner thermal insulating layer, 6. burner hearth end plate, 7. gas outlet, 8. annular gas-distributing pipe, 9. hole.
Embodiment
As seen from Figure 1, Figure 2, the utility model is the technological requirement that satisfies in the diffusion process, burner hearth in the furnace enclosure (2) has double-layer heat insulation interlayer (4), form by external thermal insulation (3) and inner thermal insulating layer (5), burner hearth end plate (6), the burner hearth middle upper portion is provided with into cooling tracheae (1) and electromagnetic gas valve, and stove is stared at the bottom, two ends and is provided with gas outlet (7), when needing fast cooling, open the air inlet electromagnetically operated valve and be blown into compressed air, evenly be blown into through ring-like distributing pipe for guaranteeing cooling.Process a lot of holes (9) in the two sides of a ring-like gas-distributing pipe (8), annular gas-distributing pipe (8) is around inner thermal insulating layer (5) middle part, cooling air is blown into the insulation interlayer by hole (9), make the internal furnace fast cooling, when being incubated, needs close electromagnetic gas valve, so since inlet, outlet is less and down the air in the interlayer can't flow and have good heat insulation effect, play well energy-conservation and temperature stabilization effect simultaneously.
The inner thermal insulating layer of burner hearth is 20-60mm, air blanketing is 5-100mm, external thermal insulation is that 20-160mm insulation material is alumina silicate fibre or insulation material commonly used, and annular gas-distributing pipe is heat-resistance stainless steel or copper or aluminium or iron pipe work, can make cooling rate reach 10-20 ℃/min in this way.
As the burner hearth inner thermal insulating layer is 60mm, air blanketing is 20mm external thermal insulation 70mm, the annular gas-distributing pipe is that the stainless steel tube of Φ 20x2mm bends 12 of apertures that form the equal Φ 4mm in both sides, interior external thermal insulation two ends are with same insulation material fixed support, other temperature control is the same with conventional diffusion furnace, and the maximum aborning cooling rate of improved burner hearth can reach 15 ℃/min.

Claims (1)

1, a kind of diffusion furnace of energy fast cooling, it is characterized in that: double-decked insulation is arranged in the burner hearth, burner hearth one end is provided with into cooling tracheae (1) and electromagnetic gas valve, the burner hearth other end is provided with gas outlet (7), annular gas-distributing pipe (8) is around inner thermal insulating layer (5) middle part, the two sides of ring-like distributing pipe (8) porose (9), cooling air can enter insulation interlayer (4) by hole (9).
CNU2008201595739U 2008-12-05 2008-12-05 Fast cooling diffusion furnace Expired - Fee Related CN201303001Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008201595739U CN201303001Y (en) 2008-12-05 2008-12-05 Fast cooling diffusion furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008201595739U CN201303001Y (en) 2008-12-05 2008-12-05 Fast cooling diffusion furnace

Publications (1)

Publication Number Publication Date
CN201303001Y true CN201303001Y (en) 2009-09-02

Family

ID=41086630

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008201595739U Expired - Fee Related CN201303001Y (en) 2008-12-05 2008-12-05 Fast cooling diffusion furnace

Country Status (1)

Country Link
CN (1) CN201303001Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012099687A1 (en) * 2010-12-30 2012-07-26 Poole Ventura, Inc. Thermal diffusion chamber with heat exchanger

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012099687A1 (en) * 2010-12-30 2012-07-26 Poole Ventura, Inc. Thermal diffusion chamber with heat exchanger
CN103547703A (en) * 2010-12-30 2014-01-29 普尔·文图拉公司 Thermal diffusion chamber with heat exchanger

Similar Documents

Publication Publication Date Title
CN107445156A (en) A kind of graphitizing furnace with quick cooling and function of recovering waste heat
CN201751401U (en) Tin tank heating/ cooling device for float glass
CN101881555B (en) High-temperature atmosphere furnace with electromagnetic field
CN202322911U (en) Internal-heating type horizontal grid barrier flow guide vacuum annealing furnace
CN201303001Y (en) Fast cooling diffusion furnace
CN206387269U (en) A kind of stove gate device with automatic open-close thermal insulating door thermally insulated door
CN103822469B (en) Chamber type electric resistance furnace
CN203021698U (en) Continuous graphitization superhigh-temperature tube furnace
CN102021660A (en) Polysilicon crucible sintering furnace
CN104775012A (en) Broad-width induction heating method and device used for uniform heating of strip steel
CN204795658U (en) Hot plate of vapourizing furnace
CN204923865U (en) Resistance furnace
CN202562298U (en) Radiating system for vacuum high-temperature horizontal sintering furnace
CN201634775U (en) Generating device utilizing waste heat of heat dissipation hole of aluminum electrolysis cell
CN104534860A (en) Efficient insulation box wall of impregnated paper drying box
CN202705403U (en) Continuous annealing furnace
CN205590747U (en) Electric heating furnace
CN205043117U (en) Hot chamber machine sandwich heating crucible
CN204224649U (en) The box annealing furnace of novel energy-conserving
CN205119801U (en) Resistance furnace for work piece
CN203768221U (en) Energy-saving glass tempering furnace
CN201897379U (en) Hydrogen demagnetization kiln
CN213599820U (en) Energy-saving germanium zone smelting pot
CN202193876U (en) Furnace radiating device of single crystal furnace
CN207672093U (en) A kind of Heat-treating Furnace For Steel Tubes

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090902