CN201301552Y CNU2008202033194U CN200820203319U CN201301552Y CN 201301552 Y CN201301552 Y CN 201301552Y CN U2008202033194 U CNU2008202033194 U CN U2008202033194U CN 200820203319 U CN200820203319 U CN 200820203319U CN 201301552 Y CN201301552 Y CN 201301552Y
Authority
CN
China
Prior art keywords
porter
payment
skirting
buttress
ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008202033194U
Other languages
Chinese (zh)
Inventor
李楚平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNU2008202033194U priority Critical patent/CN201301552Y/en
Application granted granted Critical
Publication of CN201301552Y publication Critical patent/CN201301552Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Steps, Ramps, And Handrails (AREA)

Abstract

The utility model discloses a novel combined skirting, which is characterized by mainly comprising a skirting stack fixed between stairs and a skirting at the top end of the skirting stack. One end surface of the skirting is provided with a female groove and one end surface of the skirting stack is equipped with a male tenon corresponding to the female groove, thereby the skirting stack and the skirting can be in match usage. The utility model is not only simple in structure and convenient in installation but also can save materials and reduce application costs.

Description

A kind of novel payment to a porter in combination
Technical field
The utility model relates to a kind of decorative board material, specifically is meant a kind of novel payment to a porter in combination.
Background technology
According to the Standard for quality inspection and assessment of buiding construction of country, require highly unanimity of ground payment to a porter, the thickness of outstanding front is evenly moderate, and seam is smooth tight, combines firmly with metope, and is suitable for reading straight.Therefore, according to this evaluation criteria, the existing ground payment to a porter that has occurred many types at present on the market.But, when these ground payment to a porter are installed in staircase, mostly be to adopt elder generation's actual height and width according to stair on the timber of a monoblock to carry out cutting, so that the timber after dismissing is in the height and the complete corresponding integral body of width that form in shape with stair, should be fixed on the corner by integral body timber again, and those tiny wood fragments materials of being dismissed just can't utilize again, can great waste material.
The utility model content
The purpose of this utility model is to overcome the shortcoming and defect of above-mentioned prior art, and a kind of novel payment to a porter in combination is provided, and this ground payment to a porter not only structure is very simple, and it is very convenient to install, and can also save material, reduces practical cost.
The purpose of this utility model is achieved through the following technical solutions: a kind of novel payment to a porter in combination, mainly by being fixed on stair by the payment to a porter buttress between wall one side side panel and step plate intersection location and be arranged on this payment to a porter and pile up neatly the ground payment to a porter on top and constitute, an end face of described ground payment to a porter has female groove, an end face at payment to a porter buttress then is provided with and the corresponding public tenon of this mother's groove, the use so that this payment to a porter buttress and ground payment to a porter can match.
Dismounting for convenience, the payment to a porter of described ground are that the cross section of female groove of the rectangular of a rectangle and this ground payment to a porter is rectangular.
Described payment to a porter buttress be shaped as triangle, and the size of this triangle can carry out cutting according to the situation of reality, the quantity of this payment to a porter buttress is at least more than one simultaneously.
The utility model compared with prior art has the following advantages and beneficial effect:
(1) ground of the present utility model payment to a porter is as a whole between first floor, and the cross section of female groove of this ground payment to a porter is rectangle, and the public tenon of payment to a porter buttress be with the corresponding projection of the female groove of this rectangle, therefore is convenient to ground payment to a porter and payment to a porter dismounting and the installation between piling up neatly;
(2) quantity and the shape of payment to a porter buttress of the present utility model can be carried out cutting according to the actual quantity of stair and the width and the length of staircase, thereby have avoided traditional timber after carrying out cutting can not reduce use cost greatly in the defective of utilizing.
Description of drawings
Overall structure schematic diagram when Fig. 1 uses for the utility model;
Fig. 2 is a cross-section structure connection diagram of the present utility model;
Overall structure schematic diagram when Fig. 3 separates for the utility model.
The specific embodiment
Below in conjunction with embodiment and accompanying drawing, to the detailed description further of the utility model do, but embodiment of the present utility model is not limited thereto.
Embodiment
As shown in Figure 1, 2, 3, payment to a porter buttress 2 of the present utility model is fixed on the wall of per two terraced staircases, and ground payment to a porter 1 then is arranged on the top of this all payment to a porter buttress 2.As can be seen from Figure 2, in ground payment to a porter 1 is the strip of a rectangle, and have female groove 3 on an end face of this ground payment to a porter 1, promptly this ground payment to a porter 1 end face indent forms groove one, then is provided with and this mother's groove 3 corresponding public tenons 4 on the end face of payment to a porter buttress 2.Because the cross section of this mother's groove 3 is rectangular, therefore public tenon 4 can be fixed in the ground payment to a porter 1 easily by this mother's groove 3.
Because the difference of actual conditions, the stair exponent number difference between the different floors, the width of per two rank staircases and highly also being not quite similar, so payment to a porter is piled up neatly 2 quantity and is at least more than one.Because all payment to a porter buttress 2 of the present utility model all are fixed in the ground payment to a porter 1, therefore, the quantity of this ground payment to a porter 1 only is one and gets final product between every two floors, so both can make things convenient for the installation of payment to a porter buttress 2, can reach effect attractive in appearance again.
In the installation process of reality, the length of ground payment to a porter 1 is determined according to the physical length of stair, quantity, height and the width of payment to a porter buttress 2 then carry out cutting according to actual quantity, height and the width of stair, and the payment to a porter buttress 2 triangular in shape after the cutting directly is inserted in female groove 3 by public tenon 4 and gets final product, therefore can save material, can conveniently install again.
As mentioned above, just can realize the utility model preferably.

Claims (5)

1, a kind of novel payment to a porter in combination, it is characterized in that, mainly by being fixed on stair by the payment to a porter buttress between wall one side side panel and step plate intersection location and be arranged on this payment to a porter and pile up neatly the ground payment to a porter on top and constitute, an end face of described ground payment to a porter has female groove, an end face at payment to a porter buttress then is provided with and the corresponding public tenon of this mother's groove, the use so that this payment to a porter buttress and ground payment to a porter can match.
2, a kind of novel payment to a porter in combination according to claim 1 is characterized in that the cross section of female groove of described ground payment to a porter is rectangular.
3, a kind of novel payment to a porter in combination according to claim 1 is characterized in that the payment to a porter of described ground is the rectangular of a rectangle.
4, a kind of novel payment to a porter in combination according to claim 1 is characterized in that, described payment to a porter buttress is triangular in shape.
5, a kind of novel payment to a porter in combination according to claim 1 is characterized in that, the quantity of described payment to a porter buttress is at least more than one.
CNU2008202033194U 2008-11-13 2008-11-13 Novel combined skirting Expired - Fee Related CN201301552Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008202033194U CN201301552Y (en) 2008-11-13 2008-11-13 Novel combined skirting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008202033194U CN201301552Y (en) 2008-11-13 2008-11-13 Novel combined skirting

Publications (1)

Publication Number Publication Date
CN201301552Y true CN201301552Y (en) 2009-09-02

Family

ID=41085176

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008202033194U Expired - Fee Related CN201301552Y (en) 2008-11-13 2008-11-13 Novel combined skirting

Country Status (1)

Country Link
CN (1) CN201301552Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014078978A1 (en) * 2012-11-23 2014-05-30 上海品聚实业发展有限公司 Skirting board and method of manufacturing same

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014078978A1 (en) * 2012-11-23 2014-05-30 上海品聚实业发展有限公司 Skirting board and method of manufacturing same

Similar Documents

Publication Publication Date Title
CN2438558Y (en) Two-layer cross laminated composite flooring
CN201301552Y (en) Novel combined skirting
CN203669286U (en) Connecting structure of floors and keels of integrated house
CN201353808Y (en) Metal honeycomb composite solid wood board
CN204626875U (en) The multi-layer solid wood composite floor of bayonet type splicing
CN202430932U (en) Ceramic sculpture decorative plate
CN201883652U (en) Compounded solid wood floor board
CN103741929A (en) Integrated-house floor structure
CN103741925A (en) Integrated-house floor and keel connecting structure
CN201635325U (en) Novel composite solid wood flooring
CN202718360U (en) Floor board and floor board splicing structure
CN201254819Y (en) Multilayer wedge joint wood floor
CN207260495U (en) A kind of multi-layer combined type grid stone ceramic mosaic plate
CN214696653U (en) Anion laminate flooring
CN201026638Y (en) Lumber core board with vertical wood core
CN201065621Y (en) Wood compound floor
CN201367676Y (en) Wood I-beam
CN201833446U (en) China fir plywood
CN210454030U (en) Ceramic wood panel
CN203022320U (en) Triangle pointing device for facing tile
CN201288399Y (en) Precasting folding assembled stairway
CN203669292U (en) Floor structure of integrated house
CN2926381Y (en) Composite wooden floor
CN204081380U (en) Save the wood flooring of material and the splicing structure of wood flooring
CN207919964U (en) A kind of three layers of heating floor

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090902