CN201292836Y - Exploratory well oil-testing contimuous metering apparatus - Google Patents

Exploratory well oil-testing contimuous metering apparatus Download PDF

Info

Publication number
CN201292836Y
CN201292836Y CNU200820171688XU CN200820171688U CN201292836Y CN 201292836 Y CN201292836 Y CN 201292836Y CN U200820171688X U CNU200820171688X U CN U200820171688XU CN 200820171688 U CN200820171688 U CN 200820171688U CN 201292836 Y CN201292836 Y CN 201292836Y
Authority
CN
China
Prior art keywords
hand
valve
pipeline
operated valve
flowmeter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU200820171688XU
Other languages
Chinese (zh)
Inventor
李新华
宋明水
马珍福
周广清
魏斌
邱明文
崔滨源
郭海滨
孟宪波
盖王磊
徐文庆
刘常福
杭发琴
马恩才
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Oil Production Technology Research Institute of Sinopec Shengli Oilfield Co
Original Assignee
Oil Production Technology Research Institute of Sinopec Shengli Oilfield Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Oil Production Technology Research Institute of Sinopec Shengli Oilfield Co filed Critical Oil Production Technology Research Institute of Sinopec Shengli Oilfield Co
Priority to CNU200820171688XU priority Critical patent/CN201292836Y/en
Application granted granted Critical
Publication of CN201292836Y publication Critical patent/CN201292836Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to an exploration-well testing-oil continuous metering device which comprises a control system, a separator, a flowmeter, valves, pipelines, and the like, wherein a sand remover, a hand-operated valve, a thermograph and a manometer are sequentially arranged at the upper part of the separator from a liquid inlet pipeline to a wellhead production pipeline; a vortex precession flowmeter is arranged between hand-operated valves on an oil-well gas measuring pipeline; a hand-operated valve, an automatic adjusting valve and a vortex procession flowmeter are sequentially arranged on a gas metering pipeline at the top end of the separator; a hand-operated valve, a mass flowmeter and an automatic adjusting valve are sequentially arranged on a liquid outlet pipeline at the lower end of the separator; a safety valve and a waste liquor recycling box under the safety valve are arranged at the upper part of the separator, a liquid level meter is arranged in the middle of the separator, and a heater is arranged inside the separator; a vortex precession flowmeter is arranged between hand-operated valves of a wellhead casing pipeline; and the hand-operated valves and the vortex precession flowmeter are connected with an inlet of a master control valve. The utility model has the advantages of high measuring precision and automation degree, and the like and is widely applied in a continuous metering process of drainage liquid in the petroleum exploration well.

Description

Exploration well oil test continuous metering apparatus
One, technical field
The present invention and petroleum industry oil well metering device, particularly a kind of exploration well oil test continuous metering apparatus.
Two, background technology
The metering of exploration well oil test output is an important process in the field production management, and prospect pit output is carried out accurately, in time measured, and to grasping the oil reservoir situation, formulates production decision, has important directive significance.At present, the most original method is still used in the metering of prospect pit production fluid amount: the output liquid measure of tank gauging oil well.Both entered the time of oil tank with the stopwatch metering liquid, the height with invar tape measurement oil tank liquid level behind the certain hour, measures the height that liquid level increases at interval, calculates the oil well production fluid amount of every day.There is following defective in this method of measurement: (1) liquid volume measurement is inaccurate, and error is bigger; (2) prospect pit gas production can't be measured; (3) measurement of water ratio is inaccurate; (4) method is original, and automaticity is low.
Three, summary of the invention
The purpose of this invention is to provide a kind of exploration well oil test continuous metering apparatus, adopt a whole set of measurement instrument, both overcome the shortcoming or the deficiency that exist in the prior art effectively.
Exploration well oil test continuous metering apparatus of the present invention, comprise control system, desander, eliminator, heater, content gauge, vortex precession flowmeter, mass flowmenter, electromagnetic flowmeter, pressure meter, thermometer, automatic regulating valve, control valve, hand-operated valve, safety valve, master control valve and pipeline, it is characterized in that the feed liquor pipeline on described eliminator top is equipped with desander, hand-operated valve, thermometer, pressure meter in turn to well head production pipeline; On the casinghead gas bulk measurement pipeline hand-operated valve, vortex precession flowmeter and hand-operated valve are installed in turn; On the gas dosing pipeline on eliminator top hand-operated valve, automatic regulating valve, vortex precession flowmeter are installed in turn; On the fluid pipeline of separator lower end hand-operated valve, mass flowmenter and automatic regulating valve are installed in turn; Eliminator top be equipped with safety valve and under the waste liquid collection box, the middle part is equipped with content gauge, inside is equipped with heater; Hand-operated valve, vortex precession flowmeter and hand-operated valve are installed on the well head bushing pipeline in turn; Hand-operated valve, electromagnetic flowmeter and hand-operated valve are installed between thermometer and the hand-operated valve in turn; The import of hand-operated valve, vortex precession flowmeter and master control valve links together; Described vortex precession flowmeter, automatic regulating valve, electromagnetic flowmeter, mass flowmenter, content gauge are electrically connected with control system.
Wherein, parallel well-flushing pipeline and the bypass line of being connected with between described thermometer and the hand-operated valve.Be connected by the outlet of hand-operated valve on the described bypass line with the master control valve.Described well-flushing pipeline is connected with the outlet of master control valve by hand-operated valve, electromagnetic flowmeter, hand-operated valve.On the pipeline between described pressure meter and the well head heater is installed.
The present invention compared with prior art has following advantage:
1 can satisfy stripper well, is interrupted the metering of liquid oil well;
2 can realize the metering of sleeve pipe output gas and divided gas flow amount;
3 can measure separately the well-flushing liquid measure;
4 can satisfy the oil well on-line measurement that height is moisture, contain sand and different viscosities crude oil;
5 pairs of lower oil wells of temperature can be realized the online heating of pipeline and eliminator;
6 can be used for fixed installation and move installation;
7 by computer control, continuous measurement automatically, but also manual operation.
8, safety valve carries out releasing pressure automatically and collection dirt;
9, pipeline carries out filter sand before advancing eliminator.
Four, description of drawings
Accompanying drawing is a kind of structural representation of the present invention
Five, the specific embodiment
Consult accompanying drawing, a kind of exploration well oil test continuous metering apparatus comprises control system 24, desander 4, eliminator 5, heater 6, content gauge 7, vortex precession flowmeter 11,16, mass flowmenter 13, electromagnetic flowmeter 19, pressure meter 1, thermometer 2, automatic regulating valve 10,14, hand-operated valve 3,9,12,15,17,18,20,21, safety valve 8, master control valve 22 and pipeline 26,27,28,29.The feed liquor pipeline on eliminator 5 tops is produced on the pipeline 26 to well head desander 4, hand-operated valve 3, thermometer 2, pressure meter 1 is installed in turn; Hand-operated valve 15, vortex precession flowmeter 16 and hand-operated valve 17 are installed on the casinghead gas bulk measurement pipeline 27 in turn; Hand-operated valve 9, automatic regulating valve 10, vortex precession flowmeter 11 are installed on the gas dosing pipeline on eliminator 5 tops in turn; Hand-operated valve 12, mass flowmenter 13 and automatic regulating valve 14 are installed on the fluid pipeline of eliminator 5 lower ends in turn; Eliminator 5 tops be equipped with safety valve 8 and under waste liquid collection box 23, the middle part is equipped with content gauge 7, inside is equipped with heater 6; Hand-operated valve 18, electromagnetic flowmeter 19 and hand-operated valve 20 are installed between thermometer 2 and the hand-operated valve 3 in turn; The import of hand-operated valve 17, vortex precession flowmeter 11, automatic regulating valve 14 and master control valve 22 links together; Described vortex precession flowmeter 11,16, automatic regulating valve 10,14, electromagnetic flowmeter 19, mass flowmenter 13, content gauge 7 are electrically connected and control with control system 24.
Parallel well-flushing pipeline 28 and the bypass line 29 of being connected with between thermometer 2 and the hand-operated valve 3.Be connected by the outlet of hand-operated valve 21 on the bypass line 29 with master control valve 22.Well-flushing pipeline 28 is connected with the outlet of master control valve 22 by hand-operated valve 18, electromagnetic flowmeter 19, hand-operated valve 20,21.On the pipeline 26 between pressure meter 1 and the well head heater 25 is installed.

Claims (5)

1, a kind of exploration well oil test continuous metering apparatus, comprise control system, desander, eliminator, heater, content gauge, vortex precession flowmeter, mass flowmenter, electromagnetic flowmeter, pressure meter, thermometer, automatic regulating valve, control valve, hand-operated valve, safety valve, master control valve and pipeline, it is characterized in that the feed liquor pipeline on described eliminator top is equipped with desander, hand-operated valve, thermometer, pressure meter in turn to well head production pipeline; On the casinghead gas bulk measurement pipeline hand-operated valve, vortex precession flowmeter and hand-operated valve are installed in turn; On the gas dosing pipeline on eliminator top hand-operated valve, automatic regulating valve, vortex precession flowmeter are installed in turn; On the fluid pipeline of separator lower end hand-operated valve, mass flowmenter and automatic regulating valve are installed in turn; Eliminator top be equipped with safety valve and under the waste liquid collection box, the middle part is equipped with content gauge, inside is equipped with heater; Hand-operated valve, vortex precession flowmeter and hand-operated valve are installed on the well head bushing pipeline in turn; Hand-operated valve, electromagnetic flowmeter and hand-operated valve are installed between thermometer and the hand-operated valve in turn; The import of hand-operated valve, vortex precession flowmeter and master control valve links together; Described vortex precession flowmeter, automatic regulating valve, electromagnetic flowmeter, mass flowmenter, content gauge are electrically connected with control system.
2, exploration well oil test continuous metering apparatus according to claim 1 is characterized in that parallel well-flushing pipeline and the bypass line of being connected with between described thermometer and the hand-operated valve.
3, exploration well oil test continuous metering apparatus according to claim 2 is characterized in that being connected by the outlet of hand-operated valve with the master control valve on the described bypass line.
4,, it is characterized in that described well-flushing pipeline is connected with the outlet of master control valve by hand-operated valve, electromagnetic flowmeter, hand-operated valve according to claim 2 or 3 described exploration well oil test continuous metering apparatus.
5, exploration well oil test continuous metering apparatus according to claim 1 is characterized in that on the pipeline between described pressure meter and the well head heater being installed.
CNU200820171688XU 2008-09-17 2008-09-17 Exploratory well oil-testing contimuous metering apparatus Expired - Fee Related CN201292836Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU200820171688XU CN201292836Y (en) 2008-09-17 2008-09-17 Exploratory well oil-testing contimuous metering apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU200820171688XU CN201292836Y (en) 2008-09-17 2008-09-17 Exploratory well oil-testing contimuous metering apparatus

Publications (1)

Publication Number Publication Date
CN201292836Y true CN201292836Y (en) 2009-08-19

Family

ID=41006312

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU200820171688XU Expired - Fee Related CN201292836Y (en) 2008-09-17 2008-09-17 Exploratory well oil-testing contimuous metering apparatus

Country Status (1)

Country Link
CN (1) CN201292836Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2455619C2 (en) * 2010-06-07 2012-07-10 ФГУП "Сибирский научно-исследовательский институт авиации им. С.А. Чаплыгина" Facility for testing swirl-brakes
CN110219639A (en) * 2019-04-26 2019-09-10 中国石油集团西部钻探工程有限公司 The method of the automatic gauge of formation testing swabbing operation

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2455619C2 (en) * 2010-06-07 2012-07-10 ФГУП "Сибирский научно-исследовательский институт авиации им. С.А. Чаплыгина" Facility for testing swirl-brakes
CN110219639A (en) * 2019-04-26 2019-09-10 中国石油集团西部钻探工程有限公司 The method of the automatic gauge of formation testing swabbing operation
CN110219639B (en) * 2019-04-26 2023-02-03 中国石油集团西部钻探工程有限公司 Automatic metering method for oil testing pumping operation

Similar Documents

Publication Publication Date Title
CN106522934B (en) Physical simulation experiment device and method for development of complex fractured reservoir horizontal well
EP2075403A1 (en) Real-time measurement of reservoir fluid properties
CN200993004Y (en) Separator oil-gas continuousautomatic metering device
CN108592978A (en) A kind of oil gas water multiphase on-line metering calibration calibrating installation
CN104316673A (en) Device for measuring water content of oil
CN108759951B (en) Method and device for measuring crude oil/natural gas/water three-phase flow on line
CN101353960A (en) Exploration well oil test continuous metering apparatus
CN201292836Y (en) Exploratory well oil-testing contimuous metering apparatus
CN205138983U (en) High temperature corrosion and erosion test device of oil well pipe bucking tubular column
CN104234691B (en) On-line multiphase flowmeter during a kind of high-precision real for oil field
CN104515562A (en) Multiphase flow micro-differential pressure measuring device and flow metering method
CN107246259A (en) Tubular type oil well gas-liquid two-phase flow meter and its measuring method
RU2532490C1 (en) Method and installation for flow rate measurement of products from gas-condensate and oil wells
CN2537960Y (en) High precision oil gas and water three phase flow automatic meter
CN201007666Y (en) Mine slurry continuously autoweighing device
CN204612779U (en) A kind of liquid level takes into account fluid reservoir
RU2378638C2 (en) Density metre-flow metre of fluid media
CN201730604U (en) Spiral passive gas-liquid separator
RU66779U1 (en) INSTALLATION OF BOREHOLD ACCOUNTING OF HYDROCARBON PRODUCTS
CN103245387A (en) Small-liquid-amount gas-liquid two-phase oil well meter
CN103603661B (en) Intelligent offshore oil well sampler and sampling method
CN201420546Y (en) Full-automatic differential pressure weighing type oil-gas metering device
CN101852637A (en) Method for accurately metering oil input of oil field united station
CN109138979B (en) Method and metering equipment for metering oil-gas-water well yield by equal-flow branch
CN203961951U (en) Oil extraction metering device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090819

Termination date: 20100917