CN201285133Y - House air purifying device - Google Patents

House air purifying device Download PDF

Info

Publication number
CN201285133Y
CN201285133Y CNU2008200535020U CN200820053502U CN201285133Y CN 201285133 Y CN201285133 Y CN 201285133Y CN U2008200535020 U CNU2008200535020 U CN U2008200535020U CN 200820053502 U CN200820053502 U CN 200820053502U CN 201285133 Y CN201285133 Y CN 201285133Y
Authority
CN
China
Prior art keywords
air
room
blowing device
air cleaning
heating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008200535020U
Other languages
Chinese (zh)
Inventor
刘迪辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNU2008200535020U priority Critical patent/CN201285133Y/en
Application granted granted Critical
Publication of CN201285133Y publication Critical patent/CN201285133Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Ventilation (AREA)

Abstract

The utility model relates to a room air cleaning device comprises a heating and blowing device (1) and a ventilating device (2). The top of the heating and blowing device (1) is provided with a sensor (4); a control module (5) is arranged below the sensor (4) and above a fan (3); a heating device (6) is arranged blow the fan and above an air outlet; and the ventilating device (2) comprises an exhausting device and an air inlet device. After the ventilating device (2) and the heating and blowing device (1) are respectively arranged on a window and in the central position of a room, the doors and the windows of the room are closed, and all the assemblies are connected by cables so to be in good working state to execute tasks, the room air cleaning device starts to work. The utility model has simple structure and low cost and cleans room air with the pure physical method without air cleaning agent.

Description

The house air cleaning unit
Technical field
The utility model relates to a kind of house air cleaning unit.
Background technology
After the present room finish,, move in again behind the generally all vacant ventilation some months, but this can not guarantee that the room just not have to fit up the pernicious gas that left behind in order to reduce the injury of pernicious gas to health.So not only delayed the time, healthyly also still be on the hazard.The present invention is exactly an indoor air-purification device behind the finishing that designs at this class problem.
Current air cleaning unit has a lot, all is by chemical mode basically, and the auxiliary humidification of use heats and air circulation, airborne pernicious gas is absorbed and neutralizes and reaches the purpose of air cleaning with chemical agent.
The shortcoming of this class device maximum is to need chemical agent consumption, and can not guarantee be useful in the absorption and the medicament of pernicious gas itself does not have harm to the health of human body.
Used the medicament that need in time more renew behind the certain hour could continue to use and reach the purpose that purifies air at medicament, if can not in time change medicament, become ornaments, thereby jeopardized the health of human body just purifier can not absorb pernicious gas.
Another be exactly medicament can only in and the harmful substance of desurfacing, and the harmful substance of deep layer is still residual, in long-time from now on, still can slowly evaporate, and influences health.
Summary of the invention
The purpose of this utility model just provide a kind of house decoration intact after, accelerate pernicious gas and discharge outdoor house air cleaning unit.
The technical solution of the utility model is: utilize heater that whole room is heated up, make the temperature in whole room reach even with blowing device, (pernicious gas under this temperature in the room is easy to distribute when temperature reaches predetermined temperature, can not damage simultaneously the ornament materials in the room) time, provide signal by sensor and pass to control module, send instruction then and stop heating, after keeping a period of time (for example half an hour), automatically start air interchanger, change the air in whole room, and then the startup heater carries out next one circulation.After so carrying out a plurality of circulations, air quality will be significantly improved in the room.During whole device work, the room seals.The house air cleaning unit, comprise heating blowing device 1 and air interchanger 2, it is characterized in that the top of heating blowing device 1 is provided with sensor 4, control module 5 is installed in the below of sensor 4, the top of fan 3, and heater members 6 is positioned at the top of fan 3 belows, air outlet.
This device comprises heating blowing device 1 and air interchanger 2.Heating blowing device top is air inlet, the bottom is an air outlet, in sensor 4, control module 5 (comprising switch module and signal processing module), fan 3 and heater members 6 are arranged, wherein sensor 4 is positioned at the top of heating blowing device 1, the better temperature in the nernst cell, control module 5 is installed in the below of sensor 4, the top of fan 3, and heater members 6 is positioned at the top of fan 3 belows, air outlet.Air interchanger 2 is made up of exhaust apparatus and inlet duct, exhaust apparatus and inlet duct all include an air inlet and an exhaust outlet, on the air inlet of exhaust apparatus and inlet duct fan is housed, the power switch of fan is by the control module control in the heating blowing device.Heating blowing device 1 is positioned over indoor, and air interchanger 2 is installed on the window, and makes the window sealing.
The utility model has the advantages that: simple in structure, cost is low, and pure physical method purifies the air of a room, and need not the cost of medicament.Simple to operate, by cable various piece is coupled together, startup just can enter automatic mode.Easy to maintenance: simple in structure repairing also makes things convenient for, and device commonly used all is common on the market.Effective: by promoting temperature, impel pernicious gas to quicken volatilization, volatilization is quickened in cyclical breathing and intensification, the profound level of pernicious gas from finishing material is evaporated, thereby distribute the source from having removed the pernicious gas in the room in essence.Cycle is short: after shortening house decoration greatly, the stand-by period of moving in, broken people and seen the new house that dressing is fixed and the situation that dare not live.
Description of drawings
Fig. 1 is this house air cleaning unit structural representation.
Fig. 2 is this heating blowing device structural representation.
The specific embodiment
To heat blowing device 1 and be placed on the center, room, air interchanger 2 is installed on the window, carries out encapsulation process, with cable various piece is coupled together, and sets duty and task, just can start working.Can work automatically, also can Artificial Control.
The top of this heating blowing device is a drum shape, and the bottom is conical, also can be other shape.

Claims (5)

1, house air cleaning unit, comprise heating blowing device (1) and air interchanger (2), it is characterized in that the top of heating blowing device (1) is provided with sensor (4), control module (5) is installed in the below of sensor (4), the top of fan (3), and heater members (6) is positioned at the top of fan (3) below, air outlet.
2, house according to claim 1 air cleaning unit is characterized in that this air interchanger (2) is made up of exhaust apparatus and inlet duct.
3, house according to claim 2 air cleaning unit is characterized in that on the air inlet of exhaust apparatus and inlet duct fan being housed.
4, house according to claim 1 air cleaning unit is characterized in that heating blowing device and is positioned over indoorly, and air interchanger is installed on the window, and makes the window sealing.
5, house according to claim 1 air cleaning unit, the top that it is characterized in that this heating blowing device is a drum shape, the bottom is conical.
CNU2008200535020U 2008-06-23 2008-06-23 House air purifying device Expired - Fee Related CN201285133Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200535020U CN201285133Y (en) 2008-06-23 2008-06-23 House air purifying device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200535020U CN201285133Y (en) 2008-06-23 2008-06-23 House air purifying device

Publications (1)

Publication Number Publication Date
CN201285133Y true CN201285133Y (en) 2009-08-05

Family

ID=40950119

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200535020U Expired - Fee Related CN201285133Y (en) 2008-06-23 2008-06-23 House air purifying device

Country Status (1)

Country Link
CN (1) CN201285133Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101813406B (en) * 2009-11-03 2012-05-23 黄在斌 Parching method for indoor pollution governance
CN108061353A (en) * 2018-01-26 2018-05-22 黄河科技学院 The device and method of formaldehyde are removed by forming cross-ventilation

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101813406B (en) * 2009-11-03 2012-05-23 黄在斌 Parching method for indoor pollution governance
CN108061353A (en) * 2018-01-26 2018-05-22 黄河科技学院 The device and method of formaldehyde are removed by forming cross-ventilation

Similar Documents

Publication Publication Date Title
CN204460487U (en) Air purifier
CN108131775A (en) The adjusting method and device of indoor organic matter rate of release
WO2019140543A1 (en) Method and device for regulating release rate of indoor organic matters
CN105716159A (en) Indoor fresh air purification device
CN205137683U (en) Automatically cleaning air purification system
CN108716749A (en) A kind of intelligent monitoring adjusts Ecology fresh air air cleaning unit
CN204126309U (en) Medical operation room
CN103322629A (en) Household air purification treatment and heat energy recovery device and household air purification treatment and heat energy recovery method
TW428220B (en) Temperature-humidity controller for semiconductor equipment and controlling method thereof
CN201285133Y (en) House air purifying device
CN203240670U (en) Wind and light complementary air purifier
CN111112272A (en) Variable air volume ventilation cabinet
CN206963654U (en) A kind of hen house shutter
CN204735039U (en) Intelligence respiration window
CN102865630A (en) Air purifier
CN207963046U (en) The regulating device of indoor organic matter rate of release
CN206944371U (en) Medical air cleaning system for multiple operating rooms
CN104941333A (en) Intelligent breathing window
CN206195451U (en) Antifog haze fresh air ventilator system of solar energy
CN202613609U (en) Centralized processing system for fresh air
CN110542171A (en) Concealed fresh air system
CN205372766U (en) Purify PM2. 5 heat recovery fresh air ventilator
CN205561048U (en) Ceiling type air purifier
CN211290440U (en) Concealed fresh air system
CN204107325U (en) A kind of boiler flue gas purification treatment system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090805

Termination date: 20110623