CN201268850Y - Concrete non-return apparatus for steel column reverse pouring concrete casting construction - Google Patents

Concrete non-return apparatus for steel column reverse pouring concrete casting construction Download PDF

Info

Publication number
CN201268850Y
CN201268850Y CNU2008200650048U CN200820065004U CN201268850Y CN 201268850 Y CN201268850 Y CN 201268850Y CN U2008200650048 U CNU2008200650048 U CN U2008200650048U CN 200820065004 U CN200820065004 U CN 200820065004U CN 201268850 Y CN201268850 Y CN 201268850Y
Authority
CN
China
Prior art keywords
concrete
hole
steel column
conveying pipe
concrete conveying
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2008200650048U
Other languages
Chinese (zh)
Inventor
胡兴波
杨汉林
赵桃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC5 Group Corp Ltd
Original Assignee
Mcc Chenggong Construction Co Ltd Engineering Technologies Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mcc Chenggong Construction Co Ltd Engineering Technologies Branch filed Critical Mcc Chenggong Construction Co Ltd Engineering Technologies Branch
Priority to CNU2008200650048U priority Critical patent/CN201268850Y/en
Application granted granted Critical
Publication of CN201268850Y publication Critical patent/CN201268850Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model discloses a concrete non-return device for steel column back flow concrete pouring construction. On a base plate which can be matched and connected with an orificial flange of a concrete conveying pipeline and has a rectangular working area of which the width is larger than the caliber of the concrete conveying pipeline and the length is twice larger than the caliber of the concrete conveying pipeline, one side of the length direction of the rectangular working area is provided with a through hole of which the caliber is adapted to that of the concrete conveying pipeline, and the other side of the length direction of the rectangular working area is provided with a sealing and baffling surface for sealing the concrete conveying pipeline; and at least one position between the through hole and the sealing and baffling surface is provided with a matching connecting hole adapted to a bolt hole of the orificial flange of the concrete conveying pipeline. When applied to the steel column back flow concrete pouring construction, the concrete non-return device has ideal non-return effect, convenient operation, simple structure and easy popularization and application and is favorable for improving the concrete pouring construction quality.

Description

Be used for the concrete check device that steel column pours in down a chimney pouring concrete construction
Technical field
The utility model relates to and is used for the concrete check device that steel column pours in down a chimney pouring concrete construction in a kind of building operations.
Background technology
The concrete pile that adopts steel column to pour in down a chimney concrete pouring mode construction of buildings is a kind of job practices commonly used at present.The concrete materials that mixes is poured in the building pile steel pipe of erect in the mode of pushing tow from bottom to top by pressurized delivered equipment, and its advantage is to need not to vibrate effectively to avoid existing the problem in bubble cavity in the concrete pile of being poured into a mould.For solving the concrete materials poured into a mould in the steel pipe behind the casting complete when removing conveying equipment, released by the mouth of pipe backflow of former cast feed pipe under the self gravitation effect, non-return mode commonly used at present is to beat the wedge jack and insert the wedge stake therein to stop concrete backflow with interleaved mode at the duct wall position of feed pipe.The construction practice result shows that it is relatively poor that this wedge is inserted the effect that seals the non-return mode.Because its structure is complicated, at the required precision height that intersects when splitting the wedge jack, execute-in-place inconvenience, operating efficiency are low, materials when not only having increased operation and recruitment cost and uneconomical, and after concrete casting, also exist blocking-up to seal tight inadequately situation, still have a small amount of concrete grout backflow leakage inevitably, therefore seal the weak effect of non-return.
The utility model content
Given this, the utility model will provide a kind of concrete check device that steel column pours in down a chimney pouring concrete construction that is used for, thoroughly to address the above problem.
The utility model is used for the concrete check device that steel column pours in down a chimney pouring concrete construction, can be connected with the nozzle flange of concrete conveying pipe, and have on the width greater than the concrete conveying pipe caliber, on the substrate greater than the rectangle work area of 2 times of concrete conveying pipe calibers on the length, length direction one side in its rectangle work area is provided with the through hole that adapts with the concrete conveying pipe caliber, length direction opposite side in the rectangle work area is the block face that is used for the closed concrete conveyance conduit, and the position between through hole and block face is provided with the hole that is connected that adapts with said concrete conveying pipe nozzle flange bolt hole at least.
This substrate in the said structure should have under the prerequisite of said this work area size at least, and the global shape of this substrate can be selected as required, as rectangle, square, polygon, circle or ellipse etc.
The mode of occupation of the utility model said apparatus when steel column pours in down a chimney pouring concrete construction is: carry out pushing tow when pouring in down a chimney fluid concrete in steel column, said apparatus is placed between the abutted flange of conveyance conduit between concrete conveying equipment and steel column and with its firm connection, make this through hole on the substrate be between the flange docking site simultaneously and aim at the mouth of pipe, to guarantee concrete normal conveying; After cast finishes, this the block face on the substrate is transferred to the place, docking site of nozzle flange with external force, with the blocking-up pipeline, and through the hole that is connected therebetween substrate and steel column side charging nozzle flange are interconnected with suitable mode, just the bypass outlet block of steel column inner concrete is lived, promptly can remove conveying equipment safely afterwards.
In above-mentioned concrete check device, be used for the connecting hole that the nozzle flange with concrete conveying pipe is connected on the said substrate, should be provided with the former connecting hole on the flange under the situation that the position adapts, except that adopting on the substrate corresponding periphery of said this through hole and block face to be provided with respectively the hole that is connected for its use, when adopting as length/width than the particular form rectangular substrate that is 2/1, be arranged between said through hole and the block face this hole that is connected, can also be adopted as the form in the two shared one group hole that is connected that is connected with flange, structure is more simplified by it.When adopting the former mode that this is set to be connected the hole, the operation of after above-mentioned concrete pouring finishes the block on the substrate being shifted towards the nozzle flange docking site can realize by the translation mode that makes substrate; When adopting latter's mode that this is set to be connected the hole, concrete pouring finishes the back except that the block face that can adopt same parallel-moving type with substrate is transferred to place, nozzle flange docking site, can also adopt the rotating manner of the shared connecting hole of the two to realize and the transfer of this desired position around it, can increase the more selectivity of mode of operation in the construction, enlarge the flexibility that is suitable for.
Result of the test shows that the non-return of the above-mentioned check device of the utility model is satisfactory for result, and is easy to operate in the construction, helps improving the pouring concrete construction quality, and it is simple in structure, is easy to apply.
Below, foregoing of the present utility model is described in further detail again by the specific embodiment by the accompanying drawing illustrated embodiment.But this should be interpreted as that the scope of the above-mentioned theme of the utility model only limits to following example.Do not breaking away under the above-mentioned technological thought situation of the utility model, various replacements or change according to ordinary skill knowledge and customary means are made all should be included in the scope of the present utility model.
Description of drawings
Fig. 1 is the structural representation that a kind of steel column of the utility model pours in down a chimney the pouring concrete construction check device.
Fig. 2 is the mode of occupation schematic diagram that a kind of steel column of the utility model pours in down a chimney the pouring concrete construction check device.
Fig. 3 is the schematic diagram when Fig. 1 form check device is in concrete pouring feed status position in Fig. 2 construction state.
Fig. 4 is that Fig. 1 form check device is in the schematic diagram of pouring into a mould when finishing the non-return state position in Fig. 2 construction state.
Fig. 5 is the structural representation that the another kind of steel column of the utility model pours in down a chimney the pouring concrete construction check device.
The specific embodiment
Shown in Figure 1 is the utility model is a kind of to be used for the form of structure that steel column pours in down a chimney the concrete check device of pouring concrete construction.This check device is the substrate 1 of a rectangular steel plates form that can be connected with the nozzle flange 5 of concrete conveying pipe 6, and its width is greater than the caliber of concrete conveying pipe 6, and length is greater than 2 times of concrete conveying pipe 6 calibers.Side at substrate 1 length direction is provided with the through hole 3 that adapts with concrete conveying pipe 6 calibers, and the opposite side of substrate 1 length direction is the block face 4 that is used for closed concrete conveyance conduit 6.Be respectively arranged with the hole 2 that is connected that it adapts with said concrete conveying pipe nozzle flange 5 bolts hole separately at the periphery of through hole 3 and block face 4.
Fig. 2~Fig. 4 is the user mode of the utility model concrete check device.Be placed on during construction between the nozzle flanges 5 that the concrete input channel 6 of concrete conveying equipment pipeline and steel column docks mutually, with bolt it interconnected, as shown in Figure 2.In steel column during with pushing tow mode fluid concrete, should make substrate 1 in mode as shown in Figure 3, make through hole 3 on the substrate 1 be in the docking site of nozzle flange 5.After cast finishes, after unloading the connecting bolt of 5 of infrabasal plate 1 and nozzle flanges, beat with external force 4 translations of this block face on the substrate are pushed in the docking site of nozzle flange 5 to block the pipe internal channel, and with bolt, iron wire etc. suitably mode the substrate 1 and the nozzle flange 5 of steel column side are connected and fixed, the backflow that can effectively stop in the steel column fluid concrete to cause because of gravity, as shown in Figure 4.
Fig. 5 is the another kind of form of structure of the utility model concrete check device, be that with the difference of structure shown in Figure 1 substrate 1 wherein is that a length/width is than the particular form rectangular steel plates that is 2/1, and the hole 2 that is connected of being used for of being provided with between this through hole 3 and block face 4 and concrete conveying pipe nozzle flange 5 is to supply its two shared a pair of hole 22 that is connected.Structure with respect to Fig. 1, the structure of Fig. 5 substrate is more simplified, on it this hole 2 that is connected is provided with quantity and reduces, and when construction is behind casting complete, except that can by above-mentioned the same manner with this block face 4 on the translation mode transfer base substrate to shift the docking site of nozzle flange 5, if desired, can also adopt mode around one of them shared hole 22 half-twist that are connected with substrate on this block face 4 be transferred to the place, docking site of nozzle flange 5.

Claims (3)

1. be used for the concrete check device that steel column pours in down a chimney pouring concrete construction, it is characterized in that and to be connected with the nozzle flange (5) of concrete conveying pipe (6), and have on the width greater than concrete conveying pipe (6) caliber, on the substrate (1) greater than the rectangle work area of 2 times of concrete conveying pipe (6) calibers on the length, length direction one side in its rectangle work area is provided with the through hole (3) that adapts with concrete conveying pipe (6) caliber, length direction opposite side in the rectangle work area is the block face (4) that is used for closed concrete conveyance conduit (6), and the position is provided with the hole that is connected (2) that adapts with said concrete conveying pipe nozzle flange (5) bolt hole between through hole (3) and block face (4) at least.
2. as claimed in claim 1ly be used for the concrete check device that steel column pours in down a chimney pouring concrete construction, it is characterized in that being respectively arranged with the hole that is connected (2) that adapts with said concrete conveying pipe nozzle flange (5) bolt hole at the periphery of said through hole (3) and block face (4).
3. as claimed in claim 2ly be used for the concrete check device that steel column pours in down a chimney pouring concrete construction, it is characterized in that said substrate (1) for length/width than the rectangular slab that is 2/1, the hole that is connected (2) that adapts with concrete conveying pipe nozzle flange (5) bolt hole that is arranged between said through hole (3) and the block face (4) is its two the shared hole that is connected (22).
CNU2008200650048U 2008-09-03 2008-09-03 Concrete non-return apparatus for steel column reverse pouring concrete casting construction Expired - Lifetime CN201268850Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200650048U CN201268850Y (en) 2008-09-03 2008-09-03 Concrete non-return apparatus for steel column reverse pouring concrete casting construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200650048U CN201268850Y (en) 2008-09-03 2008-09-03 Concrete non-return apparatus for steel column reverse pouring concrete casting construction

Publications (1)

Publication Number Publication Date
CN201268850Y true CN201268850Y (en) 2009-07-08

Family

ID=40841446

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200650048U Expired - Lifetime CN201268850Y (en) 2008-09-03 2008-09-03 Concrete non-return apparatus for steel column reverse pouring concrete casting construction

Country Status (1)

Country Link
CN (1) CN201268850Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102168454A (en) * 2011-04-06 2011-08-31 中国二十二冶集团有限公司 Self-compacting concrete jacking-nonnonreturn device
CN102777034A (en) * 2012-06-28 2012-11-14 广东中城建设集团有限公司 Concrete pouring method for combined structural steel and concrete structure of high-rise building
CN111827676A (en) * 2020-06-29 2020-10-27 中冶天工集团有限公司 Steel column internal flow stopping device for jacking concrete filled steel tube and using method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102168454A (en) * 2011-04-06 2011-08-31 中国二十二冶集团有限公司 Self-compacting concrete jacking-nonnonreturn device
CN102777034A (en) * 2012-06-28 2012-11-14 广东中城建设集团有限公司 Concrete pouring method for combined structural steel and concrete structure of high-rise building
CN102777034B (en) * 2012-06-28 2014-06-25 广东中城建设集团有限公司 Concrete pouring method for combined structural steel and concrete structure of high-rise building
CN111827676A (en) * 2020-06-29 2020-10-27 中冶天工集团有限公司 Steel column internal flow stopping device for jacking concrete filled steel tube and using method thereof

Similar Documents

Publication Publication Date Title
CN201268850Y (en) Concrete non-return apparatus for steel column reverse pouring concrete casting construction
CN110439286A (en) A kind of liner is put more energy into joint steel pipe concrete column drag reduction jack-up construction method of weakening
CN203213162U (en) Concrete flowing-around preventing structure of underground continuous wall
CN204780780U (en) Embankment dam gap cementer
CN106948374A (en) A kind of hot band tooth pre-buried channel flow construction method of pipe gallery
CN208563315U (en) A kind of pile foundation grouting behind shaft or drift lining constructing device
CN103741949B (en) Treatment of juncture between vertical structure and horizontal structure
CN205314572U (en) V type props jacking of steel pipe concrete and pours device
CN105382935A (en) Stirring and grouting integrated machine
CN102865087B (en) Embedded grout pipe device in lining concrete of chamber and construction method
CN107185921A (en) A kind of shield machine grouting equipment pipeline cleaning system
CN110485632A (en) A kind of construction way of concrete filled steel tubular column pour concrete
CN208088842U (en) A kind of concrete mixer
CN110985052A (en) Self-compacting concrete pouring construction process method
CN213670954U (en) Concrete pouring device
JP2008261145A (en) Method of reinforcing hollow steel pipes of power transmission steel tower
CN102287191B (en) Large-diameter engineering well wall back filling cementation quick slurry stirring construction method
CN205077480U (en) Double cannula bored concrete pile structure
CN106150097B (en) Novel structure column concrete pumping system
CN205840349U (en) Novel structure post concrete pumping system
CN204919373U (en) Spray of molten steel pipe slip casting structure
CN210766733U (en) Double-component high-pressure filling equipment with cleaning function
CN204585545U (en) Self-compacting concrete stirs hopper
CN207048796U (en) A kind of special concrete wet shot chassis containing Simple mechanical arm
CN206397501U (en) High performance concrete is with slipping apparatus for ash

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: China MCC5 Group Corp., Ltd.

Assignor: MCC Chenggong Construction Co., Ltd. Engineering Technologies Branch

Contract record no.: 2010510000039

Denomination of utility model: Concrete non-return apparatus for steel column reverse pouring concrete casting construction

Granted publication date: 20090708

License type: Exclusive License

Record date: 20100611

ASS Succession or assignment of patent right

Owner name: CHINA NO.5 METALLURGICAL GROUP CO., LTD.

Free format text: FORMER OWNER: MCC CHENGGONG CONSTRUCTION CO., LTD. ENGINEERING TECHNOLOGIES BRANCH

Effective date: 20100910

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 610066 13/F, WUYE BUILDING, NO.222, SHUANGLIN ROAD, CHENGDU CITY, SICHUAN PROVINCE TO: 610063 CHINA NO.5 METALLURGICAL GROUP CO., LTD., INDUSTRIAL PARK, JINJIANG DISTRICT, CHENGDU CITY, SICHUANG PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20100910

Address after: Jinjiang District Industrial Park in Chengdu city in Sichuan province 610063 Chinese Wuye Group Co. Ltd.

Patentee after: China MCC5 Group Corp., Ltd.

Address before: 610066 Sichuan city of Chengdu province Shuanglin Road No. 222 building 13 floor mcc5

Patentee before: MCC Chenggong Construction Co., Ltd. Engineering Technologies Branch

CX01 Expiry of patent term

Granted publication date: 20090708

CX01 Expiry of patent term